An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. February 2013

  2. 1. COMPANY PRESENTATION 1.1 Introduction 1.2 Services 1.3 FieldsofActivity

  3. 1.1 Introduction • NORAQUA, Engineering Consultants, ltd, was founded as a company in 1981 and resulted from bringing together the efforts its founding partners - civil engineering graduates - had been developing separately in basic sanitation research and projects. It also resulted from the increasing need, felt by everyone, to increment added value to research through introducing new competencies. • Currently the company is ongoing implementation process of certification of quality management system according to ISO 9001:2008.

  4. 1.2 Services • Baseline Studies • Feasibility Studies • Master Plans • Design • Technical Assistance (in construction) • Project Management and Supervision • Rehabilitation Works

  5. 1.3 FieldsofActitity • 1 – Hydraulics and Water Resources • Water Resources assessment • River Flood Control • Hydrological studies • Floods Studies • Weirs construction for floods • Multipurpose hydroelectric plant (mini) • River basin plans • Hydraulics Infrastructure Design • Agricultural Hydraulic Infrastructures Design

  6. 1.3 FieldsofActitity • 2 – Urban Hydraulics • General Plans for Basic Sanitation • Water Supply Design: abstraction, water treatment plants, water main pipes, reservoirs e water supply networks • Wastewaters Drainage System and Industrial Sewage Networs Design: drainage network, sewage interceptors, pumping systems, wastewater treatment plants (domestic and industrial), underwater outfalls. • Storm water drainage systems designs • Industrial processes and domestic effluent characterization studies • Existing infrastructures diagnosis

  7. 1.3 FieldsofActitity • 3 – Environment • Environmental impact assessment • Pollution control systems • 4 – Building installations • Water and Waste water networks • Fire protection and safety in buildings • Gaz Networks • Reuse of waste water • 5 – Cartografy and Registry • Geographical information systems (GIS) • Digital Cartografy • Expropriations

  8. 2. PORTFOLIO 2.1 Master Plans 2.2 UrbanHydraulics 2.3 TreatmentPlants 2.4 BuildingInstallations

  9. 2.1 Master Plans Master plan for Water Supply and Waste Water Supply Systems in the North of Portugal (consortium) date 2007/2008 Description Water Supply and Waste Water Supply Systems diagnosis, global analysis, proposing new solutions, estimated cost, investment timming Coverage 74 Municipalities; Population: 264 000 habitants

  10. 2.1 Master Plans Revision of Master Plan for Water Supply and Waste Water Systems along Ave River Basin (consortium) Waste Water Systems date 2007 Description Revision of baseline elements, analysis of proposed solution and proposing alternatives, main description of new proposing solution, estimated costs, development plan Population Covered 453 000 habitants

  11. 2.1 Master Plans Felgueiras Paços de Ferreira Lousada Amarante Paredes Penafiel Cinfães Castelo de Paiva Arouca FurtherstudyoftheTechnical-financial feasibilitystudyfor Vale do Sousa Region (municipalities: Amarante, Arouca, Castelo de Paiva, Cinfães, Felgueiras, Lousada, Paços de Ferreira, Paredes e Penafiel) (consortium) date 2005 Description Theaimofthisstudywas to fixseveralproblems in basic sanitationofthisregion PopulationCovered 434 000 habitants Costs WaterSystems– 134 M €; WasteWaterSystems- 247 M €

  12. 2.2 UrbanHydraulics JOVIM-NOVA SINTRA MAINPIPE date 2007 owner Águas do Douro e Paiva, S.A. Description New “Jovim-Nova Sintra” Main Pipe Design (DN900); technical assistance; maximum flow: 940 l/s cost 9.500.000 € extension 11.5 km

  13. 2.2 UrbanHydraulics PEDROUÇOS-NOGUEIRA II MAIN PIPE date 2006 owner Águas do Douro e Paiva, S.A. Description New “Pedrouços-Nogueira II” MainPipe (DN700); technicalassistance cost 4.000.000 € extension 8.5 km

  14. 2.2 UrbanHydraulics CHAVES WATER SYSTEM NETWORKS date 2008 Owner Chaves Municipality Description Chaves WaterSystems Networks (several zones) design (from DN110 to DN200); technical assistance cost 3.300.000 € extension 46.4 km

  15. 2.2 UrbanHydraulics ESPINHO WATER SYSTEMS date Since1981 Owner Câmara Municipal de Espinho Description Global WaterSystem Design (from DN60 to DN350) includingseveralreservoirs; technicalassistance extension 61 km

  16. 2.2 UrbanHydraulics EXPANSION OF PEDROUÇOS RESERVOIR date 1997 Owner Águas do Douro e Paiva, S.A. Description Expansionof Pedrouços Reservoir (at Maia); tender preparation; technicalassistance cost 2.000.000 € Capacity 10 000 m3

  17. 2.2 UrbanHydraulics MASTER PLAN FOR CITY OF ESPINHO AND neighboring areas STORM WATER date 1993 Description Delineation of drainage basins for the city and strategies and parameters for the deployment of a network of storm water drainage Populationcovered 33 700 habitants

  18. 2.2 UrbanHydraulics CITY OF ESPINHO AND neighboring areas STORM WATER DRAINAGE SYSTEM date 2000 Description Storm Water Drainage System Design: around 50 km of network (from DN 315 to DN 1500) Population covered 33 700 habitants

  19. 2.2 UrbanHydraulics Gafanha da Nazaré STORM WATER DRAINAGE SYSTEM date 2011 Description Storm Water Drainage System Design: around 22 km of network (from DN 315 to DN 1500 and “box-culvert” 1.0x2.0m) Population covered 17 100 habitants Cost (estimated) 7.4 M €

  20. 2.2 UrbanHydraulics Vila do Conde STORM WATER DRAINAGE SYSTEM date 2005/2011 Description Storm Water Drainage System Design: around 16 km of network (from DN 315 to DN 1500 and “box-culvert” 1.5x2.0m) Cost (estimated) 4.85 M €

  21. 2.3 TreatmentPlants GRAMIDO WASTE WATER TREATMENT PLANT date 1989 owner Serviços Municipalizados de Gondomar service Design Populationcovered 52 815 habitants (equivalents) Capacity: 10 574 m3/day

  22. 2.3 TreatmentPlants MOSTEIROS WASTE WATER TREATMENT PLANT date 2002 owner Serviços Municipalizados de Ponta Delgada service Design cost 591 757 € Populationcovered 3 709 habitants (equivalents) Capacity: 763 m3/day

  23. 2.3 TreatmentPlants S. SILVESTRE WASTE WATER TREATMENT PLANT date 2007 owner Empreiteiros CASAIS / Águas do Mondego, S.A. service Design cost 2 001 445 € Populatuioncovered 11667 habitants (equivalents) Capacity: 2 100 m3/day

  24. 2.3 TreatmentPlants SOUSA WASTE WATERTREATMENT PLANT date 2011 owner DST / Águas do Noroeste, S.A. service Design cost 9 774 559 € Populationcovered 84082 habitants (equivalents) Capacity: 16 161 m3/day

  25. 2.3 Estações de Tratamento PADRASTOS WATER TREATMENT PLANT date 1991 owner Câmara Municipal de Vale de Cambra service: Design cost 357 374 € Populationcovered 17505 habitants (equivalents) Capacity: 3 339 m3/day

  26. 2.3 TreatmentPlants QUEIMADELA WATER TREATMENT PLANT date 1996/2005 owner Câmara Municipal de Fafe / Águas do Noroeste, S.A. Service Projeto de execução Cost 1 009 617 € / 514 050 € Populationcovered Around 40 000 habitants Capacity: 17 859 m3/day

  27. 2.4 BuildingInstalations HOTEL SHERATON LISBOA DATE 2005 APPLICANT MAROPE DESCRIPTION: Remodelation/ expansion of a 405 rooms hotel, Health Club, Restaurants, indoor and outdoor swimming pools, several common areas for lazer and hotel services. CHARACTERISTICS: Floors: 35, 5 below the ground SCOPE OF WORKS: - Water supply systems - Fire protection network - Waste water drainage network - Storm water drainage network COST 630.000 €

  28. 2.4 BuildingInstalations HOTEL CROWN PLAZA (VILAMOURA BEACH) DATE 2007 - 2009 APPLICANT MAROPE DESCRIPTION Remodelation/ expansion of a 330 rooms hotel, Health Club, Restaurants, indoor and outdoor swimming pools, several common areas for lazer and hotel services. CHARACTERISTICS Floors: 14, 1 below the ground SCOPE OF WORKS: - Water supply systems - Fire protection network - Waste water drainage network - Storm water drainage network COST 750.000 €

  29. 2.4 BuildingInstalations “CONTINENTE” HYPER AND SUPERMARKETS DATE 1998 - 2013 APPLICANT SONAE, MC. DESCRIPTION Construction, remodelationandexpansionofaround 145 Continente, Continente Modelo and Continente Bom Dia shops, allaround Portugal SCOPE OF WORKS: - Water supply systems - Fire protection network - Waste water drainage network - Storm water drainage network

  30. 2.4 BuildingInstalations ANTAS SHOPPING CENTER (DOLCE VITA PORTO) DATE 2001 APPLICANT AMORIM IMOBILIÁRIA, S.A. DESCRIPTION: This building is composed by a Shopping Centre with 130 shops and 1695 vehicle parking places, one residential building and an Hotel CHARACTERISTICS Shopping Centre Area: 62 500 m2 Floors: 7, 2 below ground Residential Building Apartments: 300 Hotel Rooms: 120 SCOPE OF WORKS: - Water supply systems - Fire protection network - Waste water drainage network - Storm water drainage network COST 2.423.000 €