220 likes | 432 Views
The Future Initiative of the Deutsches Museum. „Future Initiative“ - reasons. flood in the mine. storage building. rotten infrastructure. water in the storage. „Future Initiative“- reasons. Modernisation of outdated exhibitions. many exhibitions are outdated. Ø 18,9 years 1. < 5. 5 - 9.
E N D
„Future Initiative“ - reasons flood in the mine storage building rotten infrastructure water in the storage
„Future Initiative“- reasons Modernisation of outdated exhibitions many exhibitions are outdated Ø 18,9 years1 < 5 5 - 9 10 - 14 15 - 19 20 - 24 ≥ 25 age (years) 1 6/2006 Quelle: Deutsches Museum, McKinsey
„Future Initiative“- measures Main Measures Exhibition Building:- Structuralfirepreventionmeasures- Modernisationofthebuilding- Modernisationoftheexhibitions Library Building:- Connection Forum – Exhibition Building- Modernisationofthebuilding- Additional exhibitionspace Forum:- Modernisationofthebuilding- New mainentrance- Planetarium andmultifunctionalmeetingplaceCentral Storage (visitabledepot):- Professional storage- Logistics- Financial savings Exhibition Building Library Building Forum Central Storage
„Future Initiative“ - masterplan The way to the „Masterplan“ Expert planners Work groups Topics Masterplan
Natural sciences • Environment, health, • social environment • Traffic and mobility • Media, communication • Material and production Cross-cutting themes(no several project teams) Exhibition Organisational topics Furtheruses Vision Employees Library/Archive/Research/Education Building/Technic/Security Collection concept/ Central „show“ collection „Future Initiative“ Work groups of the „Masterplan“
„Future Initiative“ Workshop of the „Masterplan“ • Active participation of the „experts“ • Open, moderated discussions • Exchange of different positions • Knowledge profit through change of perpectives
„Future Initiative“ Workshop of the „Masterplan“ Integration of expert planners • Fire protection planner • Cost Manager • Time schedules • Architects • Experts of building services • Structural engineer
„Future Initiative“ Timeline (example exhibition building) ? 2016-2019 2018-2023 2014-2017 2022-2025 2013-2015
„Future Initiative“ Cost Estimation MINIMUM 400 MIO EURO
„Future Initiative“ New Exhibition: Chemistry
„Future Initiative“ New Exhibition: Chemistry - Design Music
„Future Initiative“ Central Storage - Visitable Depot Depot Garching ca. 4000 m² Depot Ingolstadt ca. 9.000 m² Flugplatzgelände Oberschleißheim ca. 730 m² 30.000 m² storage space for 300.000 objects low energy construction professional storage and conservation environment visitable (partly) special space for sensitive objects (e.g. musical instruments) electronic documentation facilities and research infrastructure CENTRAL STORAGE Depot Hauptzollamt ca. 3.200 m² Depot Museum Island ca. 7.000 m² FLOOD DANGER Depot Flugwerft Schleißheim ca. 5.100 m² Actual depot costs ca. 1,8 Mio. € / a
„Future Initiative“ Structural Fire Prevention Measures
„Future Initiative“ Firesections - class listed monument5 new staircases on each floor
„Future Initiative“ fireprotection concept green areas will be the new escape routes
„Future Initiative“ Modification example: fire protection unit D (BA D)