10 likes | 277 Views
ONR Introductory Remarks 0800 - 0810 Mr. Steve Smolinski (ONR) OPNAV Introductory Remarks 0810 - 0820 CAPT Mark Howell (OPNAV N8F) IPT Introductory Remarks 0820 - 0830 CAPT Mark Howell (OPNAV N8F) EPE Gap Reviews and Discussion* 0830 - 1230
E N D
ONR Introductory Remarks 0800 - 0810 Mr. Steve Smolinski (ONR) OPNAV Introductory Remarks 0810 - 0820 CAPT Mark Howell (OPNAV N8F) IPT Introductory Remarks 0820 - 0830 CAPT Mark Howell (OPNAV N8F) EPE Gap Reviews and Discussion* 0830 - 1230 POM14-01 Naval Platform and Systems Total Ownership Cost 0830 - 0930 POM14-02 Naval Platform and Systems Operational Availability 0930 - 1030 POM14-03 Naval Platform Survivability Improvement 1030 - 1130 POM14-05 Automation to Reduce Workload 1130 - 1230 Closing Remarks / Way Ahead * Gap review and discussion should not exceed 1 hour per Gap. POM-14 EPE Roundtable AgendaTuesday, 19 April 2011