RPC TC/RC/DPG/Commissioning meeting at 18.aug.2014

RPC TC/RC/DPG/Commissioning meeting at 18.aug.2014. Dong- hyun kim Behalf on the RPC current investigate team. Plan. RPC Current study at P5 – Part : RPC EN4 all channels. Step 1. 1. Research the EN4 part 36 channel( From 20.May To 21.May ). Step 1.

deo
Download Presentation

RPC TC/RC/DPG/Commissioning meeting at 18.aug.2014

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RPC TC/RC/DPG/Commissioning meeting at 18.aug.2014 Dong-hyunkim Behalf on the RPC current investigate team

  2. Plan • RPC Current study at P5 – Part : RPC EN4 all channels

  3. Step 1 • 1. Research the EN4 part 36 channel( From 20.May To 21.May )

  4. Step 1 • 1. Research the EN4 part 36 channel( From 20.May To 21.May )

  5. Step 1 • 1. Research the EN4 part 36 channel( From 20.May To 21.May )

  6. Step 1 • 1. Research the EN4 part 36 channel( From 20.May To 21.May )

  7. Step 1 • 1. Research the EN4 part 36 channel( From 20.May To 21.May )

  8. Step 1 • 1. Research the EN4 part 36 channel( From 20.May To 21.May )

  9. Step 2 • 2. Select channel that had a potential problem Current all most Zero Unstable

  10. Step 2 • 2. Select channel that had a potential problem Current all most Zero Unstable current at 9400V

  11. Step 2 • 2. Select channel that had a potential problem Current almost Zero Current goes down to Zero

  12. Step 3 • 3. Select research period( common period from May to Aug. )

  13. Step 4 • 4. Investigate channels that had potential problem( Processing ) < EN4 R2_R3_C10 Low – current > • < EN4 R2_R3_C06 current down to ≈ 0 > • Several channels had this pattern • 7.03 14~ 7.04 21-9400 • 8.01 12~8.03 17-9400

  14. Conclusion • Ongoing to investigate for the EN4 potential problem channels. • Continuously, we will investigate the EP4 36 channels

  15. Thank you for attention