150 likes | 238 Views
RPC TC/RC/DPG/Commissioning meeting at 18.aug.2014. Dong- hyun kim Behalf on the RPC current investigate team. Plan. RPC Current study at P5 – Part : RPC EN4 all channels. Step 1. 1. Research the EN4 part 36 channel( From 20.May To 21.May ). Step 1.
E N D
RPC TC/RC/DPG/Commissioning meeting at 18.aug.2014 Dong-hyunkim Behalf on the RPC current investigate team
Plan • RPC Current study at P5 – Part : RPC EN4 all channels
Step 1 • 1. Research the EN4 part 36 channel( From 20.May To 21.May )
Step 1 • 1. Research the EN4 part 36 channel( From 20.May To 21.May )
Step 1 • 1. Research the EN4 part 36 channel( From 20.May To 21.May )
Step 1 • 1. Research the EN4 part 36 channel( From 20.May To 21.May )
Step 1 • 1. Research the EN4 part 36 channel( From 20.May To 21.May )
Step 1 • 1. Research the EN4 part 36 channel( From 20.May To 21.May )
Step 2 • 2. Select channel that had a potential problem Current all most Zero Unstable
Step 2 • 2. Select channel that had a potential problem Current all most Zero Unstable current at 9400V
Step 2 • 2. Select channel that had a potential problem Current almost Zero Current goes down to Zero
Step 3 • 3. Select research period( common period from May to Aug. )
Step 4 • 4. Investigate channels that had potential problem( Processing ) < EN4 R2_R3_C10 Low – current > • < EN4 R2_R3_C06 current down to ≈ 0 > • Several channels had this pattern • 7.03 14~ 7.04 21-9400 • 8.01 12~8.03 17-9400
Conclusion • Ongoing to investigate for the EN4 potential problem channels. • Continuously, we will investigate the EP4 36 channels