1 / 11

Prototype Fabrication Economic & Test Plan QDR

Prototype Fabrication Economic & Test Plan QDR. AAE 451: Team 2. Michael Caldwell Jeff Haddin Asif Hossain James Kobyra John McKinnis. Kathleen Mondino Andrew Rodenbeck Jason Tang Joe Taylor Tyler Wilhelm. Overview. Aircraft 3-View Overall Schedule Economic Plan Flight Test Plan.

dfoley
Download Presentation

Prototype Fabrication Economic & Test Plan QDR

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Prototype Fabrication Economic & Test Plan QDR AAE 451: Team 2 Michael Caldwell Jeff Haddin Asif Hossain James Kobyra John McKinnis Kathleen Mondino Andrew Rodenbeck Jason Tang Joe Taylor Tyler Wilhelm

  2. Overview • Aircraft 3-View • Overall Schedule • Economic Plan • Flight Test Plan

  3. Aircraft 3-View Mission Requirements • 15 min. endurance • Take-off distance ≤ 60 ft. • Vstall ≤ 15 ft/s • Vloiter ≤ 25 ft/s • 35 ft. turn radius

  4. Overall Schedule

  5. Overall Schedule

  6. Economic Plan • Total Person-Hours(as of Week 9 - 3/21/05): 1700 hours • Estimated Total Person-Hoursat Project Completion: 3500 hours

  7. Component Testing Motor and Controller $134.00 Rate Gyro $124.99 Receiver $ 69.00 Servos $ 65.96 Battery $ 29.90 Propellers $ 22.00 ----------------------------------------- Total $445.85 Prototype Fabrication and Testing EPP Foam $ 60.00 Balsa $ 20.00 Ultrakote $ 18.00 Landing Gear $ 15.00 Epoxy $ 10.00 ----------------------------------------- Total $123.00 Economic Plan Cost Estimation

  8. Economic Plan

  9. Flight Test Plan • Schedule / Location of Flight Testing • April 14 – 19 • Possible Locations (depending on availability) • Outside • Airport Intramural Fields • West Lafayette High School • McAllister Park • Inside • Mollenkopf Athletic Center • Lambert Fieldhouse • Armory

  10. Flight Test Plan • Objectives • Unpowered Glide • Stability • Lifting Capabilities • Straight Line / Turning Flight • Include Take Off and Landing • Endurance • Flying Qualities

  11. Summary • Aircraft 3-View • Overall Schedule • Economic Plan • Flight Test Plan • Questions?

More Related