An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


    1. Growing the railways on Merseyside Neil Scales OBE Chief Executive & Director General Merseytravel

    2. Merseytravel Rail Development The Merseyrail network provides a high quality mass transit system which provides a basis for: Improving accessibility within Merseyside Connecting Merseyside in to the wider region through the development of the railway beyond the existing boundaries

    3. Merseytravel Rail Development The current position 30m use the Northern/Wirral Lines 5.5m use the City Line 37 stations are fully accessible (out of 87) 51 stations have park and ride 15 stations have dedicated bus interchange

    4. Merseyrail Network Map

    5. Key Themes Passenger Safety Accessing the Rail Network Provision of Information for Passengers Increased and/or Easier Opportunities for Interchange at Stations Improved Cycling Facilities

    6. Recent Achievements Refurbishment of Merseyrail Electrics Trains Upgrading 21 stations including: 12 - improved passenger facilities 10 - additional / upgraded car parks 6 - new/upgraded bus/rail interchanges 3 - fully accessible

    7. Refurbished Fleet

    8. Fleet Refurbishment Refurbishment of the full fleet of 59 units completed. Focus on Passenger Information and Accessibility.

    9. Formby: upgraded car park and new bus interchange

    10. Hoylake New Raise & Lower Counter

    11. Just Completed

    12. Liverpool South Parkway

    13. Liverpool South Parkway Opened on Sunday June 11 2006 Merseytravel's biggest ever project Combination of Allerton and Garston stations Cost of 32 Million Fast and efficient links to John Lennon Airport Has won awards even before it had opened!

    14. Liverpool South Parkway Facilities Incorporated bus station and taxi rank High frequency airport shuttle 240 space park and ride scheme Secure and Safe CCTV and customer information systems Fully accessible

    15. Liverpool South Parkway Eco friendly Use of waste blast furnace slag instead of cement Rainwater harvesting Roof using 2.3 tonnes of recycled aluminium Timber from responsibly managed forests Solar photovoltaic cells on windows

    16. Coming Soon.

    17. Lime Street Gateway

    18. Lime Street Station Gateway Key gateway to the City and Merseyside Development in conjunction with transfer of Lime Street to Network Rail Major Stations Part of wider regeneration of City Centre European Capital of Culture 2008

    19. Sandhills

    20. Sandhills One of the most heavily used stations on Merseyrail network Lift access from ground level Improved passenger facilities New booking office Interchange for buses/taxis and cars Unisex disabled toilet Retail outlet at platform level

    21. Bootle Oriel Road

    22. Bootle Oriel Road New passenger waiting facilities New footbridge New booking hall and ticket office CCTV cameras Stair and lift access to platforms Complements surrounding area that has seen major investment

    23. And Finally.?

    24. Major Projects Electrification proposals: Kirkby Headbolt Lane Bidston Wrexham City Line Electrification Liverpool Earlestown Manchester Huyton St. Helens Wigan Improved station facilities: Liverpool Central

    25. Line Reopenings Olive Mount Chord - Improved freight service provision Halton Curve - Links North Wales and Chester to Liverpool Airport St Helens Junction - Central Link Bootle - Aintree

    26. Long Term Possibilities More Electrification Hunts Cross Warrington Manchester Headbolt Lane Wigan Ormskirk Preston Bootle Branch Passenger Service - Football Ground Access Burscough Curves Linking Southport to Ormskirk and Preston