20 likes | 122 Views
TG3a Project Timeline. Jan03 Session #22 Complete TRD, Selection Criteria Doc, and Downselect Procedure Doc Mar03 Session #23 Proposals should be heard, criteria doc amended as needed May03 Session #24 Second round of proposals heard
E N D
TG3a Project Timeline • Jan03 Session #22 • Complete TRD, Selection Criteria Doc, and Downselect Procedure Doc • Mar03 Session #23 • Proposals should be heard, criteria doc amended as needed • May03 Session #24 • Second round of proposals heard • We should spend part of this session discussing proposals presented, answering technical questions/concerns (i.e. put the diehard engineers in a room and let them verbally duke it out). • Spend time on conference calls discussing proposals to let everyone get comfortable (before and after this session). • Criteria doc amended as needed • Jul03 Session #25 • Final round of presentations. Voting must occur here --start drafting process. • Sep03 Session #26 • proposals for draft improvements should be entertained at this time (i.e. now that we know the realm of the game, let the games begin) • Nov03 Session #27 • complete drafting process…seek approval to go to WG Letter Ballot Robert F. Heile, Appairent
TG3a Timeline PAR CFA 2002 Project Definition Downselect 2003 Draft J F M A M J J A S O N D J F M A M J J S O N A D D Robert F. Heile, Appairent