1 / 12

PERENCANAAN PEMBANGUNAN PRASARANA TELEMATIKA

PERENCANAAN PEMBANGUNAN PRASARANA TELEMATIKA. Oleh : Eddy Satriya. Disampaikan pada One Day Total e-Solutions Seminar The Grand Bali Beach Hotel – Sanur 29 Mei 2002. Analisis Pembangunan Prasarana Telekomunikasi. 1983/84. 1988/89. 1993/94. 1998/99. 2003/04. Pelita III. Pelita IV.

doria
Download Presentation

PERENCANAAN PEMBANGUNAN PRASARANA TELEMATIKA

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PERENCANAAN PEMBANGUNAN PRASARANA TELEMATIKA Oleh : Eddy Satriya Disampaikan pada One Day Total e-Solutions Seminar The Grand Bali Beach Hotel – Sanur 29 Mei 2002

  2. Analisis Pembangunan Prasarana Telekomunikasi 1983/84 1988/89 1993/94 1998/99 2003/04 Pelita III Pelita IV Pelita V Pelita VI-Krisis Propenas-Krisis 600.000 ss 900.000 ss 3.000.000 ss 8.000.000 ss ? DP, DIP, PMA, BLN DP, BLN, DIP, PMP DP, BLN, PBH DP, BLN, PBH, KSO DP, BLN, PBH, KSO? 40k ss / Th 80k ss / Th 400k ss / Th 1000k ss/T h ? CATATAN: DP: Dana Perusahaan; PBH: Pola bagi Hasil; PMP: Penyertaan Modal Pemerintah; DIP: Daftar Isian Proyek; BLN: Bantuan Luar Negeri (Hutang+Hibah), Penanaman Modal Asing

  3. Telephone Density vs Income • Korelasi antara income suatu negara dengan kepadatan telepon • ln density = a + b ln gnp + e • ln gnp = p + q ln density + e • Granger Causality Jipp, A., “Wealth of Nations and Telephone Density”, Telecommunication Journal (July 1963), pp 199-201

  4. DATA YANG DIGUNAKAN • Table 1.1 Size of Economy (GNI/GDP per capita) • Table 5.9 Power and Communications (main lines, average revenue per lines ~ ARPU) • Semua data merupakan laporan Bank Dunia ( 2001) dalam “World Development Indicators” dan dapat diakses di http://www.worldbank.org

  5. HASIL REGRESI KEPADATAN TELEPON TERHADAP INCOME

  6. HASIL REGRESI INCOME TERHADAP KEPADATAN TELEPON

  7. Target Pembangunan

  8. Highlights • Hasil Regresi : kepadatan vs income • Ln density = -5.5421 + 0.9918 ln gnp per capita (internasional) • Ln density = -4.1579 + 0.8324 ln gnp per capita (aspac) • Hasil Regresi : income vs kepadatan • Ln gnp per capita = 5.9395 + 0.8176 ln density (internasional) • Ln gnp per capita = 5.5345 + 0.9218 ln density (aspac) • Jumlah satuan sambungan yang harus dibangun sampai 2005 untuk mencapai international average • Dengan referensi internsional : 4.1 juta sst • Dengan referensi asia pasific : 7.5 juta sst

More Related