An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Summary of Linac4 integrationStatus and open issue - June 2010 WP.4.6 Coordination of Linac4 installation* * To be updated J.Coupard

  2. A coordination meeting takes place every 2 weeks. All the people involved in the installation are invited and receive information e-mails. If some of you want to be added in the e-group, let me know. The minutes are available on the Twiki page of the coordination This presentation is a summary of progress of the following main subjects: Linac4 Reference Database Integration studies Logistics and schedule studies Coordination of installation J.Coupard

  3. Integration studies ICL website Level 1 Level R Level S2 J.Coupard

  4. Level 1 • New update(s) / Modification(s) • Layout of wave guides – RFvalidation ongoing • Optimization of Racks location : some changes, but without any issue JP Corso J.Coupard

  5. Level 1 • Faraday cage – studies ongoing Presentation during the next coordination meeting - 5th July JP Corso J.Coupard

  6. Level 1 JP Corso • CV rooms 400-1-017 400-1-018 Will be renamed according to patrimony rules Validated in Autumn 2010 J.Coupard

  7. Level 1 • Missing in the integrations studies • Metallic structures: false-floors, platforms… (hall, services gallery) • Fire detection/Alarms, extinguishers • Lighting defined by EN/EL, but not integrated JP Corso JP Corso JP Corso J.Coupard

  8. Level 1 • Open Issue(s) • No plinths to stop any water cooling on the floor • No information for the control room. Who is the responsible ? • Additional racks … additional cables … but no more space available !! *Demanded’Installation de Cables • It is needed a passage between surface and underground, so one of the two last wave guides will be used for these last additional cables (5 more racks !), but cannot contain more. • DIC* before end of June 2010 • EDMS 1069147 – coordination meeting minute 22/03/10 Already used Used for additional cables J.Coupard

  9. Level R • New update(s) / Modification(s) • Access control JP Corso JP Corso J.Coupard

  10. Level R • Missing in the integrations studies • Fire detection/Alarms • Open Issue(s) • No plinths to stop any water cooling on the floor J.Coupard

  11. Level S2 • 3 MeV zone to be frozen, limited space J.Coupard

  12. Level S2 • New update(s) / Modification(s) • Interferences with CCDTL ongoing(validated with Russian Institute) • Update of the model of diagnostic line still pending (1 month) JP Corso JP Corso J.Coupard

  13. Level S2 • Missing in the integrations studies • RF reference line – ongoing • Fire detection/Alarms • Dump • Dump Line J.Coupard

  14. Level S2 • Open Issue(s) • Access behind the machine • Fence on platform at the end of transfer line JP Corso JP Corso J.Coupard

  15. Level S2 • Open Issue(s) • Interface L4-L2 Linac 4 Installation Personal Dosimeter D22 b.363 Emergency Exit Linac 2 Operation Personal Dosimeter Emergency exit J.Coupard

  16. Linac4 Reference Database For the moment, nothing has been put inside the layout database due to: • Definition of naming and code equipment - ongoing • Definition of regions (i.e inter-tank zones) S.Bartolome, R.Billen and P.Le Roux are still working on all present data contained in different supports such as Integration, Remo’s Excel file, MAD files… Information missing: • Beam instrumentations - pending • Vacuum valves - pending • Definition of the Assembly Breakdown Structure “ABS” for cavities - ongoing It will be necessary to have the MTF structure done to link the documentation Today, nothing in MTF database J.Coupard

  17. Linac4 Reference Database • Definition of the Dcums EDMS 1078132 JP Corso J.Coupard

  18. Logistics and schedule studies • Schedule of General Services – ongoing but mainly validated The following installations still need to be studied • Cooling systems • Safety Alarms systems • Wave guides and RF equipments installation • Racks • Schedule of Machine Installation – to be studied • Linac4 line • Transfer line J.Coupard

  19. Logistics and schedule studies • Before end of June 2010 • DIC / DIF • Ethernet, Wifi • Electrical Network • AUG/AUL • Schedule of General Services Oct.10 Nov.10 Dec.10 Jan.11 Feb.11 Mar.11 Apr.11 May.11 Jun.11 Jul.11 Aug.11 Sep.11 Oct.11 Nov.11 Dec.11 Jan.12 Feb.12 Infrastructures Survey / Scans Electrical distribution - Power Electrical distribution - Control & DC Handling systems Handling Ventilation Air Control Cooling Safety alarms 22nd Nov. 2010 = Linac2 stop  Civil engineering works at the interface L4-L2 CE J.Coupard

  20. Coordination of installation The installation phase will start very soon and it is important to be aware of the following information: • Authorization for installations • Integrated • Scheduled • Safety authorization (work permit, VIC) • Other works • Coordination/Safety authorization Main contacts • Integration : Jean-Pierre Corso • General Schedule & Coordination : Julie Coupard • Coordination on site / TSO : Serge Grillot • Safety Coordinators : Emmanuel Paulat, John Etheridge • Non Conformities of Installation  MTF support LHC J.Coupard

  21. SummaryIntegration J.Coupard

  22. SummaryLayout Database J.Coupard

  23. SummaryCoordination J.Coupard

  24. Julie Coupard – on behalf of the coordination of Linac4 installation Thanks for your attention J.Coupard