Progress On TRD Gas System. AMS TIM at CERN TRD Splinter Meeting July 27, 2005 Martina Green. Box S. Manifolds. Box C. Xe 1550 psia. TRD 300 Liters. Mixing Vessel D 200 psia. CO 2 940 psia. 17.6 -20.4 psia. Schematic of the AMS-TRD gas system. All pressures are at 25 C.
E N D
Progress On TRD Gas System AMS TIM at CERN TRD Splinter Meeting July 27, 2005 Martina Green Martina Green
Box S Manifolds Box C Xe 1550 psia TRD 300 Liters Mixing Vessel D 200 psia CO2 940 psia 17.6 -20.4 psia Schematic of the AMS-TRD gas system. All pressures are at 25 C. Martina Green
Box S Sub-assemblies Martina Green
Box S Pressure Relief Valve Martina Green
Status of Flight Module • CO2 and Xe vessels and bosses (Ardé):ready • Burst disks (BS & B Safety Systems):in hand @ MIT • Relief valves for Box S (Marotta):in hand @ MIT • Flight qualified cables (Glenair):In hand @ MIT • Brackets for Fill/Vent/Tower valves:CERN MIT • Three Sub-assy.pre-assemb.MIT Ardé (05/2005) Martina Green
2-Valve GP50 2-Valve GP50 Preassembled Flight Sub-assemblies Martina Green
2-Valve Filter Preassembled Flight Sub-assemblies Martina Green
4-Valve Preassembled Flight Sub-assemblies 4-Valve Martina Green
Box S Box S Sub-assemblies Martina Green
August December Arde Production Schedule Martina Green
Box S Mounting Platform Shipping Unit Box S - Mounting Platform • Completed Arde (07/2005) Martina Green
Open Issues with Flight Module • Vessels heaters • Foil or stick: waiting for Arde’s feedback • Installation: Arde or MIT • Thermostats: to be finalized & ordered • TRD heaters: Power? (UB’s details) • Xe/CO2 vessesl: Fill Location & Procedure • Arde Contract: Subcontract? Martina Green
Box S EM - Previous Status • Passed vibration test at ENSA(12/2003) • Reduced 1st Buffer Vol. (10/2004) CO2:15 5 c.c.Xe: 30 15 c.c. • Box S + Box C MIT:cabling/manual tests (11/04) • D-Vessel: added a ss tube w/1-mm holes(11/2004) Martina Green
S.S. Tube: with 1 mm holes Mixing Vessel Modification Martina Green
Progress of Box S – EM at MIT • Portable clean room:perform manual tests • Ardé visited MIT:(02/2005) • Visits ofINFN-Rome & A. Lebedev @ MIT(03/2005) • updated w/ flight module USCM (Lebedev) • new gas mixing software (Rome & Lebedev) • tested & evaluated software • CO2 & Xe transfers tests: validate buffer volume Martina Green
CO2 Fill in Vessel D Martina Green
Xe Fill in Vessel D Martina Green
CO2 – Xe Transfer from Vessel D to Box C Martina Green
CO2 Xe EM 10-day Xe/CO2 life cycleStudy • Xe/CO2 1% Flight mass – completed Xe (13.4 mole/L):27.5 L, 48.5 kg300 mL, 500 g CO2 (9.9 mole/L):13.3 L, 5.8 kg150 mL, 65 g Martina Green
High Pressure CO2 Fill Setup Martina Green
High Pressure Xe Fill Setup Martina Green
10-Day Life Cycle Study Result Martina Green
Current TRD Progress • EM of Box S + C Rome(electronic integ. 07/2005) • Xe & CO2 vessel fill procedure:MIT/Linde • Box C (Flight): being fabricated (G. Rybka) • Rest of Box S componentsArde ~08/05) Martina Green
Phase II Safety Data • Pressure System Table:No open issues • Other safety requests fulfilled: • Fill/Drain of S, C & M - locations & procedures • Vessel fill port seal cap - design/drawing • CO2 freezing issue – detailed writeup to follow • Radiation Hazard Report request • New monitor tube design & location • Fe55 loading Martina Green
Monitor Tube Location Martina Green
Monitor Tube – New Design Martina Green
Quantity of Fe55 Loading Martina Green