270 likes | 376 Views
Progress On TRD Gas System. AMS TIM at CERN TRD Splinter Meeting July 27, 2005 Martina Green. Box S. Manifolds. Box C. Xe 1550 psia. TRD 300 Liters. Mixing Vessel D 200 psia. CO 2 940 psia. 17.6 -20.4 psia. Schematic of the AMS-TRD gas system. All pressures are at 25 C.
E N D
Progress On TRD Gas System AMS TIM at CERN TRD Splinter Meeting July 27, 2005 Martina Green Martina Green
Box S Manifolds Box C Xe 1550 psia TRD 300 Liters Mixing Vessel D 200 psia CO2 940 psia 17.6 -20.4 psia Schematic of the AMS-TRD gas system. All pressures are at 25 C. Martina Green
Box S Sub-assemblies Martina Green
Box S Pressure Relief Valve Martina Green
Status of Flight Module • CO2 and Xe vessels and bosses (Ardé):ready • Burst disks (BS & B Safety Systems):in hand @ MIT • Relief valves for Box S (Marotta):in hand @ MIT • Flight qualified cables (Glenair):In hand @ MIT • Brackets for Fill/Vent/Tower valves:CERN MIT • Three Sub-assy.pre-assemb.MIT Ardé (05/2005) Martina Green
2-Valve GP50 2-Valve GP50 Preassembled Flight Sub-assemblies Martina Green
2-Valve Filter Preassembled Flight Sub-assemblies Martina Green
4-Valve Preassembled Flight Sub-assemblies 4-Valve Martina Green
Box S Box S Sub-assemblies Martina Green
August December Arde Production Schedule Martina Green
Box S Mounting Platform Shipping Unit Box S - Mounting Platform • Completed Arde (07/2005) Martina Green
Open Issues with Flight Module • Vessels heaters • Foil or stick: waiting for Arde’s feedback • Installation: Arde or MIT • Thermostats: to be finalized & ordered • TRD heaters: Power? (UB’s details) • Xe/CO2 vessesl: Fill Location & Procedure • Arde Contract: Subcontract? Martina Green
Box S EM - Previous Status • Passed vibration test at ENSA(12/2003) • Reduced 1st Buffer Vol. (10/2004) CO2:15 5 c.c.Xe: 30 15 c.c. • Box S + Box C MIT:cabling/manual tests (11/04) • D-Vessel: added a ss tube w/1-mm holes(11/2004) Martina Green
S.S. Tube: with 1 mm holes Mixing Vessel Modification Martina Green
Progress of Box S – EM at MIT • Portable clean room:perform manual tests • Ardé visited MIT:(02/2005) • Visits ofINFN-Rome & A. Lebedev @ MIT(03/2005) • updated w/ flight module USCM (Lebedev) • new gas mixing software (Rome & Lebedev) • tested & evaluated software • CO2 & Xe transfers tests: validate buffer volume Martina Green
CO2 Fill in Vessel D Martina Green
Xe Fill in Vessel D Martina Green
CO2 – Xe Transfer from Vessel D to Box C Martina Green
CO2 Xe EM 10-day Xe/CO2 life cycleStudy • Xe/CO2 1% Flight mass – completed Xe (13.4 mole/L):27.5 L, 48.5 kg300 mL, 500 g CO2 (9.9 mole/L):13.3 L, 5.8 kg150 mL, 65 g Martina Green
High Pressure CO2 Fill Setup Martina Green
High Pressure Xe Fill Setup Martina Green
10-Day Life Cycle Study Result Martina Green
Current TRD Progress • EM of Box S + C Rome(electronic integ. 07/2005) • Xe & CO2 vessel fill procedure:MIT/Linde • Box C (Flight): being fabricated (G. Rybka) • Rest of Box S componentsArde ~08/05) Martina Green
Phase II Safety Data • Pressure System Table:No open issues • Other safety requests fulfilled: • Fill/Drain of S, C & M - locations & procedures • Vessel fill port seal cap - design/drawing • CO2 freezing issue – detailed writeup to follow • Radiation Hazard Report request • New monitor tube design & location • Fe55 loading Martina Green
Monitor Tube Location Martina Green
Monitor Tube – New Design Martina Green
Quantity of Fe55 Loading Martina Green