This project focuses on the design, efficiency, and optimization of hydraulic fan motors. The team aims to improve production, safety, and quality, while reducing downtime and implementing preventative maintenance. Data collection, analysis, and adherence to industrial standards are key components of this project.
E N D
Team Valeo Team Members Stefan Enjem – ISE Joe Van Hofwegen - ISE Young Lee - ISE Joe Pecht - ME Walter Freitag - ME Jason Zion - ME Luis Garcia - EE
Hydraulic Fan Motors • Who uses them? • Why are they used? • How are they built?
Needs Assessment • QPH (9) • 4 to 6% Increase in Production • 2 year payback • Safety and Quality
Organization • Scope and Resource Distribution • Work Breakdown Structure • Scheduling • Gantt Chart • Communication • Yahoo Web Group
Deliverables • Standardized Procedures • Preventative Maintenance • Set Production Guidelines • Fix Problematic Stations • End of Line Tester Efficiency • Identify improved system configurations
Data Collection and Analysis • Data Collection • Motor Counters • EOLT Data Sheets • Cycle Time • Historical Data
Bottleneck Identification • Histogram shows major sources of backup
Micro-stop • Micro stop = Downtime of less than 5 minutes
Industrial Standards • Clean Room • Certified Class 100,000 • QS 9000 • Quality standard TS 16949 • Valeo Union Standard • 423 minutes per shift • Ergonomic Guidelines
Detailed Procedures • Standard Procedures • Worker Rotation • Failure Response Plan
Manual Stations Station 90 Station 160 • Current Problems • Concept for Improvements • Expected Improvements
Preventative Maintenance • Creation of a Preventative Maintenance Schedule
Station 210 • Current Problems Camera for Optical Test Leak Test Connectors
Station 210 • Concepts for Improvement • Mirror • PM on Rubber Connectors Rubber Connectors • Expected Improvements • Reduction in Downtime
End of Line Tester • Function • Current Problems • Feasibility of Concepts
Mounting Concept • Linear Slide Mount
Mating Concept • Modified Assembly Cell Balancer
Technical Analysis • FEA • Air Cylinder Sizing • Expected Improvements
Arena Simulation – Our Test Plan • Analyze system as a whole • Identify optimal system configuration and alternatives • Using pallets, conveyor speed, queue sizes • Justify Improvements
Cost Analysis of Total System • Estimated Cost Analysis • Net Present Value
Future of Project • Engineering Models • Head start • Simulation • Stations • Detailed Design • Meet the Goal