210 likes | 409 Views
AMS 02 Electronics TRD Crate Arrangement. Mike CAPELL Senior Research Scientist Massachusetts Institute of Technology TRD Meeting, CERN - July ‘02. TRD Crate Arrangement (1/4) : on ISS. 3+ years on ISS (altitude=400km). TRD Crate Location (2/4) : on AMS. Crates are arranged in rows,
E N D
AMS 02 ElectronicsTRD Crate Arrangement Mike CAPELL Senior Research Scientist Massachusetts Institute of Technology TRD Meeting, CERN - July ‘02 AmsE TRD Crates
TRD Crate Arrangement (1/4) : on ISS 3+ years on ISS (altitude=400km) AmsE TRD Crates
TRD Crate Location (2/4) : on AMS • Crates are arranged in rows, • Fixed to the USS, • Supporting the radiators AmsE TRD Crates
TRD Crate Location (3/4) AmsE TRD Crates
hole hole UGB CAB CVB CCEB TTCS TTCS PORT STAR. STAR. PORT TRD Crate Location (4/4) AmsE TRD Crates
TRD U-Crate Mechanics AmsE TRD Crates
Board Mechanics(stiffener optional) AmsE TRD Crates
UPD Mechanics AmsE TRD Crates
TRD Electronics Mechanics • Flight Design Locations • 2 U-Crates (Wake Up, Ram Up) • Centered in row per TRD request. • 2 UPD (Wake Port, Ram Port) • Symmetrically located near to U-Crates • 1 UG-Crate (Wake Up) • Near to UGB(S,C) • 1 UGPD (Wake Port) • Near to UG-Crate AmsE TRD Crates
U-Crate • 21 Slot Crate (as T-Crate) contains: AmsE TRD Crates
UPD • 11 Slot “xPD”, contains 9pr DC-DC • Not the same as TPD ! AmsE TRD Crates
UG-Crate • 11 Slot Crate (as S-Crate?): • Assuming single width cards. AmsE TRD Crates
UGPD • 7 Slot “xPD”?, contains 5pr DC-DC ? AmsE TRD Crates
Crate Design Status – Drawings exist: AmsE TRD Crates
Crate Design Status – Crate Exists (CSIST, TW) AmsE TRD Crates
Crate Design Status • 24 Slot “J-Crate” produced. • Few problems to clear up • Complicated surface treatment (electrical vs thermal requirements) under review at CGS. • Slots for “EMI” plates very difficult to machine. Drop for next version of crates – wait for QM results. • Drawings for U, UG Crates could be ready “soon”. AmsE TRD Crates
xPD Design Status – Drawings started. AmsE TRD Crates
xPD Design • Drawings started based on FlightDesign Tables for TPD. • Complete set reviewable by 1 Sept. • Need input from xPD responsibles • (btw – who is that for UPD?). AmsE TRD Crates
Crate and xPD production: • CSIST has agreed to produce: • Mechanics: 4 U-Crates + 4 UPDs • (nothing for UG, UGPD) AmsE TRD Crates
Crate & xPD Production • RWTH has agreed to produce: • 2 U-Crates (“QM1”, =EM?) • 0? UPD • 3? UG-Crates (EM=QM, FM, FS?) • 3? UGPD (ditto). • Crate Production (1 U & 1 UG) • could start Sep ’02 ? • (assume number of slots fixed) • xPD Production (0? UPD & 1 UGPD) • Could start Q4 ’02 ? • (assuming contents fixed) AmsE TRD Crates