An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The Refining Industry in Iraq

  2. Present Installed Refining Capacity 1- Salah al Din Complex – Baiji – 310 mb1/d 2- Doura Refinery – Baghdad – 210 mb1/d 3- Basrah Refinery – Basrah -140 mb1/d + 70mb1/d under construction 4- - 6 small refineries , 30mb1/d – 180 mb1/d Kirkuk,Syniah-Baiji , Najaf,Samawa,Nasiriyah,Maisan - 1 small refinery at Diwaniyah – 20 mb1/d - 1 = = = Kasak –Neinewah – 10 mb1/d - 1 = = = Haditha – Anbar – 16 mb1/d Total- 886 mb1/d +70 mba under construction

  3. Operating Capacity The average operating capacity is in the 540 – 600 mb1/d. The short fall in refining capacity is due to - Shortage in delivery of crude oil - Frequent stoppages due to operational problems - Accumulation of fuel oil or Naphtha in small refineries.

  4. Main Projects in Existing Refineries - 3 Ismerisation Units at Baiji , Doura & Basrah – under construction. -2 Gasoline Reformers at Doura & Basrah- Procurement & Construction Phases. - Fcc unit at Basrah –FEED phase. - Fcc unit at Doura–FEED phase. - Fcc unit at Baiji – Feasibility Completed. -2Gas Oil Desulphurisation Units at Basrah & Doura- Bidding Stage . -3 small Gasoline Reformer units at Najaf ,Samawa& Nasiriyah- Engineering phase. - Power Generation Units at Doura & Baiji – under construction

  5. NEW REFINERIESThere are five new grass root refineries planned for the next two decades .They are :-1- Karbala Refinery2- Maissan Refinery3- Nassiriya Refinery4- Kirkuk Refinery 5- Ninewa Refinery

  6. SITE INFORMATION: • Kerbala Refinery is located about (110) KM South west Of Baghdad. • Area : 4 X 3 Km2 • Coordinate U.T.M. : • N : 3580000 • E : 415000

  7. Karbala Refinery Process Units Licensors

  8. Products Specification will be according to EURO-4 as minimum required. • Gasoline , Kerosene &Gas oil with (10 ppm ) Sulphur content .

  9. Expected Product Quantities : There is a possibility of increasing the capacity to 200mb/d as requested by an investor who is considering this project

  10. SITE INFORMATION: • Maissan Refinery is located about (400) KM South Of Baghdad. • Area :( 2 X 3) Km2 • Coordinate U.T.M. : • N : 3537000 • E : 730000

  11. Missan Refinery Process Units Licensors

  12. Missan Refinery Process Units Licensors

  13. Products Specification will be according to EURO-4 as minimum required. • Gasoline , Kerosene &Gas oil with (10 ppm ) Sulphur content .

  14. Expected Product Quantities :

  15. SITE INFORMATION: • Al-Nassiriya Refinery is located about (400) KM South Of Baghdad. • Refinery Area  5.6 Km2 • Coordinates U.T.M. : • N : 3413750 • E : 622900

  16. Nassiryah Refinery Process Units Licensors

  17. Nassiryah Refinery Process Units Licensors

  18. Products Specification will be according to EURO-4 as minimum required. • Gasoline , Kerosene &Gas oil with (10 ppm ) Sulphur content .

  19. Expected Product Quantities :

  20. SITE INFORMATION: • Kirkuk Refinery is located about (300) KM North Of Baghdad. • Area :( 2 X 3) Km2 • Coordinate U.T.M. : • N : 3937794 • E : 431192

  21. Kirkuk Refinery Process Units Licensors

  22. Products Specification will be according to EURO-4 as minimum required. • Gasoline , Kerosene &Gas oil with (10 ppm ) Sulphur content .

  23. Expected Product Quantities :

  24. Ninewa Refinery • NinewaRefinery is located in the oilfields of Qayarah & Najma – Ninewa Governorate . It’s a project proposed by an investor to process the ultra heavy crude of these fields .The project was adopted by the Ministry since it will resolve the problem of transportation of the said crude. The timing of the project shall follow the time schedule for the development of the fields. The project is still in the initial stage. The preliminary capacity is 150mb/d . A power station is planned to utilize the heavy products of the refinery.

  25. Main Features of Law Number 64/2007 for Investment in Refineries 1- Ministry of Oil to supply the refinery with crude oil for a period of 50 years at (FOB) price with discount of 5% provided that the discount will be between 4 & 8 USD . 2- Ministry can adopt contracts in any internationally recognized form of investment including participation with no more than 25% of the investment . 3- The investor has the right to sell the products, at international prices prevailing in the area, inside Iraq or to export the same outside Iraq. The Ministry shall have the first option to buy. 4- The investor has the right to build and operate petrol stations inside Iraq to market his own products. 5- Ministry of Finance shall allocate a suitable piece of land to the investor on lease basis for a period of 50 years subject to extension. 6- The project shall enjoy the incentive of General Investment Law 13 /2006 which include tax holiday for 10 years.