Status of Upgrade releases David Lange Eric Brownson March 22, 2013 More details found in my PPD talk: https://indico.cern.ch/getFile.py/access?contribId=7&resId=1&materialId=slides&confId=242008
Release plan has not changed significantly since January workshop • CMSSW_6_1_X will be basis for near-term production in support of upgrade work • Latest and greatest fully validated release • Support for very high pileup digitization (at acceptable memory footprint) • Nominally changes should be validated in CMSSW_6_2_X development release cycle and then backported to CMSSW_6_1_X • Code that is compatible with current and upgraded detector configurations is highly desired but not essential • Compatibility can be maintained via conditions or configuration • A lot of incompatible code will lead to delays in integration. • We don’t have a way to support integration builds for incompatible code
Scenario implementation • We propose to provide configurations indexed by year. E.g.: • 2015: Post LS1 detector • 2017: Add phase 1 pixel detector • 2019: Add phase 1 HCAL detector • Etc…. • This scheme also provides a natural way of handling detector aging parameters. We will provide a simple ES producer to have a central definition of integrated and instantaneous luminosities • So far we are keeping all python configuration changes that depend on geometry in handful of customization functions. • Developing scheme to support these changes within nominal cff structure using tracking use case for initial development
Proposal for release schedule over next months • We anticipate a higher rate of code changes to be integrated given goals over the next months. • Propose to integrate tags into releases based on these deadlines separated by two weeks: • April 5 • April 19 ** latest chance for anything to run in production for June • May 3 • May 17 • Etc… • Expect the corresponding releases to then be available 1 week after these deadlines. Anticipate needing to maintain multiple releases given incompatible codes.
Readiness for CMSSW_6_1_X(as I understand them – apologies for omitting items)