Status of SVD2 upgrade. Koji Ueno National Taiwan U. 2003/2/13 @PSROC. Outline. Features of SVD2 Smaller beam pipe & more Si layers TTM( see Jerry’s talk) & Flex: done by NTU. Flex saga Low yield & spares Schedule & accident Beam pipe was broken Conclusion. Features of SVD2.
E N D
Status of SVD2 upgrade Koji Ueno National Taiwan U. 2003/2/13 @PSROC
Outline • Features of SVD2 • Smaller beam pipe & more Si layers • TTM( see Jerry’s talk) & Flex: done by NTU. • Flex saga • Low yield & spares • Schedule & accident • Beam pipe was broken • Conclusion
Features of SVD2 • Smaller beam pipe R = 2 cm --> 1.5 cm. • Originally 1 cm was planed. • More silicon layers 3 --> 4. • Originally 5 layers were planed. • Radiation-hard front-end electronics. • Up to 10 MRad is tested OK. • Z trigger. • Necessary to remove a beam-gas event.
Belle SVD2 246 Double-sided Silicon Strip Detectors (DSSDs). Each DSSD has 512 z strips and 512 phi strips. Total no. read out is 250 k. It is reduced to 110 k by ‘ganging’. Ganging is done by FLEX.
TTM & Flex • NTU is responsible for TTM & Flex. • TTM see Jerry’s talk. • We finished them in spring, 2002. • They are now used in 1/10 system without a problem. • We need a spare Flex and SVD to prepare for an “accident”.
Ganging in FLEX. DSSD Wire-bonding on Si and FLEX pads. FLEX Z strip Readout Signal Signal
Flex saga • Flex task was supposedly easy. • Flex was in a crisis a year ago: low yield, bad wire-bonding, repair etc. • Laser beam was used to repair shorted lines to meet a deadline. • Only small no. of companies can make a Flex in the world. • Exchange of Flex info. among Belle, D0 and CDF.
Laser surgery of shorted wire • The shorted wire is fixed by laser.
25 mm wire for bonding. Wire-bonding
Installation of 1.2 SVD HOM resonant heating Installation of 1.4 SVD Trouble of He cooling system
The SVD2 first cosmic ray muon event Nov. 15, 2002
Conclusion • SVD2 upgrade has a successful 1/10 system test. Has seen the 1st CR event. • It is likely installed in summer, 2003. • It aims for a higher luminosity. • We have to prepare a spare SVD and a spare Flex for an accident.