Preliminary Design of Galvez Estates Subdivision. Summary of Topics. Introduction General Site Information Sanitary Sewer Design Design of Subdivision Hydrologic Analysis Traffic Impact References. LA 42. General Site Location. General Site Information. Development Site: Tracts A & B
E N D
Summary of Topics Introduction General Site Information Sanitary Sewer Design Design of Subdivision Hydrologic Analysis Traffic Impact References
LA 42 General Site Location
General Site Information Development Site: Tracts A & B Development Size: 47.9 Acres Lot Size: 70’x150’ Minimum Number of Lots: 100 Land Cost: $30,000/acre Construction Cost: $450/linear foot of street Profit Goal: >$2.5 million
Sanitary-Sewer Design • Pipe Size Design Based on: • Peak Flowrate • Manning’s with PVC Pipes Flowing Half-Full Qpeak = 1.69 cfs Diameter = 1.7” ~ 2” Per EBR: Minimum Pipe size = 8”
Sanitary-Sewer Design • Velocity Requirements • Minimum Velocity = 2 fps • Maximum Velocity = 10 fps Manning’s with PVC Pipes Flowing Half-Full V = 2.4 fps
Design of Subdivision Lot size of 70’x 150’ Lot frontage along Curved Right of Ways held to 70’ at building line Building Lines held to 25’ 122 lots Curb and gutter with subsurface drainage
Design of Subdivision • Road Design • 12 feet utility servitude outside 50 ft right-of-way • Surfaced with 3”asphalt cement over 12” soil cement sub base • Road designed above Base Flood Elevation of 18’ • Minimum road slope of 0.4%
Drainage Design • Site Conditions • Topography • Soil Types • Flood Zone • Pre-Development Drainage • Post-Development Drainage • Fill Mitigation • Design Storm
Soil Types • Calhoun Silt Loam • 81.1% of Site • Deerford-Verdun Complex • 17.9% of Site • Olivier Silt Loam • 1% of Site • Predominately Hydrologic Group D
FEMA F.I.R.M. • FIRM Panel# 2205C0035E • Flood Zones “AE” & “X” • BFE=18.0’
Catchment Area 1 Discharge • Rational Method • Weighted Runoff Coefficient, C = 0.32 • Intensity, I = 4.0 in/hr (EBR Drainage Manual) • Area, A = 47.2 Ac (Includes 7 Ac of adjacent land) • Pre Development Discharge, Q = 60.4
Fill Mitigation • Not an Issue • Majority of Site is above Base Flood Elevation • 1,100 C.Y. of Storage Loss due to Fill • Pond Normal Pool Below B.F.E. • B.F.E.=18.0’ • Normal Pool = 13.75’ • Potential for >30,000 C.Y. of Storage Offsets Loss due to Fill
Design Storm • 10 yr, 24 hr Event • Total Rainfall = 8.5” (EBR Drainage Manual) • Modeled in HydroCAD • SCS - Type III Event
Current Site Conditions Route: LA0042 milepoint: 19.61 station: 205510 Year – ADT 2007 – 12566 Route: LA0933 milepoint: 0.82 station: 205530 Year – ADT 2007 - 5684
Traffic Impact Analysis (Per Institute of Transportation Engineers’ Trip Generation Model)
Design Vehicle S-Bus36 Minimum Design Turning Radius = 38.9’ Centerline Turning Radius = 34.9’ Minimum Inside Radius = 23.8’
Galvez Boulevard @ La 932 La 932 Galvez Boulevard
Permits • Lousiana DOTD • Right Of Way Permits • Highway Access, Utilities, Vegetation • Department of Health And Hospitals • Sanitary Sewer, Onsite Treatment • Ascension Parish • Subdivision Permit
References East Baton Rouge Parish Unified Development Code Trip Generation – Institute of Transportation Engineers - 6th Edition Google Maps www.DOTD.Lousiana.gov AASHTO Guide for Design of Pavement Structures