1 / 21

COMPLEXUL ENERGETIC HUNEDOARA

COMPLEXUL ENERGETIC HUNEDOARA. OBIECTIVE de INVESTITII. Complexul Energetic Hunedoara Obiective de investitii. Din punct de vedere a necesitatii si oportunitatii : Urgente De perspectiva, vizand in principal extinderea de capacitatii de productie. Termocentrala Mintia.

ewa
Download Presentation

COMPLEXUL ENERGETIC HUNEDOARA

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. COMPLEXUL ENERGETIC HUNEDOARA OBIECTIVE de INVESTITII

  2. Complexul Energetic HunedoaraObiective de investitii Din punct de vedere a necesitatii si oportunitatii: • Urgente • De perspectiva, vizand in principal extinderea de capacitatii de productie Termocentrala Mintia Termocentrala Paroseni

  3. Obiective de investitii urgente Au, in general, surse de finantare proprii si imprumuturi bancare garantate de stat

  4. Termocentrala Mintia • Instalaţii de desulfurare a gazelor de ardere aferente grupului nr.3 • Instalaţie noncataliticǎ de reducere a cantitǎţii de NOx aferenta grupului nr.3 • Schimbarea sistemului de colectare, transport si depozitare a zgurii si cenusii (slam dens) • Reabilitare grup nr.4 • Instalaţii de desulfurare a gazelor de ardere aferente grupului nr.4 • Instalaţie noncataliticǎ de reducere a cantitǎţii de NOx aferenta grupului nr.4 • Grup energetic cu turbina cu gaze în ciclu combinat, cu capacitate de 400 MW • Valorificarea  potentialului hidroenergetic al lacului de acumulare de pe raul Mures, prin realizarea de microhidrocentrale

  5. Termocentrala Paroseni • Instalatia de desulfurare a gazelor de ardere – grup nr.4 de 150 MW si CAF de 100 Gcal/h • Schimbarea sistemului de colectare, transport si depozitare a zgurii si cenusii (slam dens) • Instalarea unui CAF de 100 Gcal/h • Reabilitarea retelelor si a punctelor termice din Valea Jiului • inchiderea depozitului de zgura si cenusa - Valea Caprisoara

  6. MINTIA

  7. MINTIA - Desulfurare grup nr.3 • procedura de achizitie publica – va fi demarata prin licitatie deschisa, inclusiv credit furnizor pentru echipamente • indicatorii tehnico-economici - in curs de aprobare prin hotarare de guvern in scopul obtinerii unui credit bancar garantat de stat. • a fost depusa documentatia la EximBank pentru emitere scrisoare de intentie /confort • au fost obtinute avizele si acordurile necesare • costul investitiei este de 46 mil.€ (fara TVA)

  8. MINTIA - Instalatii noncatalitice de reducere a NOx solutii tehnice similare pentru grupul nr. 3 si grupul nr. 4 pentru grupul nr. 3 procedura de achizitie este in curs, se negociaza cu operatorii economici termen PIF pentru instalatia aferenta grup nr.3: semestrul I 2013 asigura valori de NOx sub 200 mg/Nm3 valoare estimata / grup 1.700 mii€

  9. MINTIA – Schimbarea tehnologiei de colectare, transport si depozitare a zgurii si cenusii • Valoarea investitiei: 96,5 mil. lei, din care depozitul de zgura si cenusa- 27 mi. lei (lucrare finalizata) si instalatia de slam dens – 69,5 mil. lei Termen de finalizare : 2014 Surse de finantare : fonduri proprii

  10. MINTIA - Reabilitare grup nr.4 Stadiul: furnitura de cazan si turbina (Rusia) achizitionata si platita sunt in curs negocieri pentru expertizarea si regarantarea tehnica din partea furnizorului finantare conform HG nr.1855/2006 in valoare de 67,9 mil €, in curs de reconfirmare la MFP EximBank analizeaza documentatiile depuse MECMA sustine proiectul prin adresa nr. 136171/5.06.2012 demers la MFP sustinut de MECMA pentru sprijin in asigurarea finantarii Valoarea lucrarii (fara TVA) : 95 mil €

  11. MINTIA - Desulfurare grup nr. 4 • indicatorii tehnico-economici in curs de aprobare prin hotarare de guvern in scopul obtinerii garantiei de stat pentru creditul bancar ( a fost depusa documentatia la MECMA) • avize si acorduri obtinute • schema de finantare identica grupului nr. 3 • conditionat de promovarea lucrarii de reabilitare a grupului nr. 4 • costul investitiei este de 40 mil. € (fara TVA)

  12. MINTIA - Obiective de investitii de perspectiva Acestea vizeaza in principal extinderea capacitatii de productie Valorificarea  potentialului hidroenergetic al lacului de acumulare de pe raul Mures, prin realizarea de microhidrocentrale CTE Deva. Grup energetic cu turbina cu gaze în ciclu combinat, cu capacitate de 400 MW

  13. MINTIA - Grup energetic cu turbina cu gaze în ciclu combinat, cu capacitate de 400 MW • proiectul este selectat in PNI si are finantare nerambursabila in proportie de 25 % • se amplaseaza in locul grupurilor 1 si 2 care se retrag din exploatare, folosind o parte din facilitatile acestora • asigura un plus de siguranţa sistemului energetic prin injecţia de putere pe care o realizează în zonă • servicii de sistem si profit aferent • înfiinţarea unui producător independent de energie (IPP reglementat prin Ordinul M.E.C. nr.1646/28.08.2012) • numirea comisiei de negociere prin ordinul ministrului nr.2065/17.10.2012 • Valoarea estimata al investitiei este de 253 mil. € (fara TVA)

  14. MINTIA - Valorificarea  potentialului hidroenergetic al lacului de acumulare de pe raul Mures, prin realizarea de microhidrocentrale se instalează următoarele echipamente noi: turbine hidraulice şi generatoarele aferente, având puterea totală instalată de aprox. 7 MW. finanţarea ca proiect de tip „Green/Brown Field” prin constituirea unui producător independent de energie organizat sub forma unei societăţi comerciale cu capital mixt. a fost emis Ordinul nr.1823/19.09.2012 al ministrului MECMA de numire a comisiei de negociere si a secretariatul tehnic este pregǎtitǎ documentaţia pentru selecţia investitorului. a fost publicat anuntul pentru preselectarea investitorului valoare estimata conform SF 25 mil. €

  15. PAROSENI

  16. PAROSENI – Desulfurare grup nr.4 • Investitie aprobata prin HG 549/2009 • Valoarea investitiei : 49 mil. Euro, asigurata din credite • Stadiu: au fost obtinute toate avizele si s-au efectuat lucrari de demolare pentru eliberarea amplasamentului

  17. PAROSENI – Schimbarea tehnologiei de colectare, transport si depozitare a zgurii si cenusii • Investitie aprobata prin HG 549/2009 • Valoarea investitiei : 16,23 mil. Euro • Stadiu : a fost obtinut Certificatul de urbanism si avizele si acordurile solicitate prin acesta • Termen de finalizare : 31 de luni de la intrarea in vigoare a contractului cu consortiul care executa lucrarile.

  18. PAROSENI – Instalarea unui CAF de 100 Gcal/h • Investitie aprobata prin HGR 379/1990, modificata cu HGR 897/2002 • Valoare totala actualizata: 358.299 lei • Surse de finantare : surse proprii • Grad de realizare : 71%

  19. PAROSENI – Reabilitarea retelelor de termoficare din sistemul de transport al Vaii Jiului • Valoarea actualizata a investitiei : 9.742.650 lei • Finantare : surse proprii • Investitia este realizata in proportie de 80% • Termen de finalizare estimat : 2018

  20. PAROSENI - Inchiderea depozitului de zgura si cenusa - Valea Caprisoara • Valoarea aprobata a investitiei : 6.135.800 lei • Finantare : surse proprii • Finalizare : pana la finalizarea instalatiei de slam dens

  21. COMPLEXUL ENERGETIC HUNEDOARA

More Related