SWG Resource Team Update. Thomas Carr August 20, 2009 TAS Meeting Salt Lake City, UT. Resource Team Meetings & Tasks. Resource team weekly meetings: June 4, 16, 24 July 1, 8, 16, 22, 27 August 5, 12, 18 Tasks Calculate RPS energy requirements for 2019 & 2029

faraji
Download Presentation

SWG Resource Team Update

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SWG Resource Team Update Thomas Carr August 20, 2009 TAS Meeting Salt Lake City, UT

  2. Resource Team Meetings & Tasks • Resource team weekly meetings: • June 4, 16, 24 • July 1, 8, 16, 22, 27 • August 5, 12, 18 • Tasks • Calculate RPS energy requirements for 2019 & 2029 • Deriving the load-resource gap in 2019 • Develop resource portfolio for 2019 and 2029 cases • Generation resources subject to Once Through Cooling (OTC) and Endangered Species Act (ESA)

  3. 1. RPS Requirements 2019 & 2029 • 2019 Methodology • Start with BA 2019 loads supplied to WECC • Convert to state load forecast 2019 • Adjust state load by % shares using EIA 2007 data • Multiply each share by appropriate RPS% • Tentative estimate: 146,090 GWh or 13.7% of load • Adjustments made for line losses and sales, CA non-RPS • 2029 Methodology • Expand 2019 BA loads by 10 year growth factor • Revise RPS% for each state • Tentative estimate: 205,043 GWh or 16.6% of load • Old estimate does not reflect adjustments for line losses in 2019 estimates

  4. 2. Load & Resources – Gap • General methodology • Gap = [Peak load + planning margin] – Generation at peak • Started with WECC-wide analysis without transmission constraints assuming: • Planning margin: range of 12% to 15% • Capacity factors at peak: hydro 90% to 70% • Renewable shares: wind/solar range 70%/10% to 40%/40% • Shift to Subregional analysis • Transmission constraints between subregions • Subregions have different peaks, planning margins, capacity factors, and resource portfolios

  5. Approach #1: Subregional Loads & Resource Analysis • Subregional Load-Resource Methodology • Model 7 subregions in WECC • Don Scoffield spreadsheet development • Toggle switch • Summer and winter subregional coincident peaks • Development status of generation, i.e. under construction • Input assumptions • planning margins for each subregion • discounted capacity factors for each subregion. • Model derives an initial gap for each subregion • Adjustment for trade flows between subregions • Flows identified on major transmission paths at peak period • Estimated net imports to derive an adjusted gap

  6. Approach #2: Incremental Analysis • Incremental Load Methodology • Arne Olson spreadsheet development • Premise: 2008 resources were adequate to meet demand in each subregion with a sufficient planning reserve margin. • Three step process • First, measure the peak demand growth from today to 2019 for each BA. Use maximum peak demand for the 2006-2008. • Second, sum the BA demand growth for each sub-region to yield a measure of sub-regional peak demand growth. • Third, assess the reasonableness of that demand growth estimate by calculating average peak demand growth rates for each sub-region.

  7. 3. Resource Portfolio for Base Case • Specify TEPPC base case resources to meet RPS requirements in applicable states • Two prong strategy to specify renewables for the TEPPC base case • California • RETI / CA PUC 33% RPS report • Rest-of-WECC • LSE IRP information • L&R data on renewable projects

  8. Base Case Portfolio • California • 33% RPS target; about 70-75% of all incremental renewables • RETI project identified renewable energy zones • CA PUC released 33% RPS Implementation Analysis that identified 4 resource scenarios to meet the 33% RPS target • Reference Case – current procurement and market trends, including large reliance on solar CSP • Out-of-State Case – higher levels of imports from NV and WY • Data to specify CA resources • CA PUC 33% RPS Report, appendix p. 86-89 • 33% RPS Calculator model/spreadsheet • RETI Phase 1B, Chap 4, maps of RETI zones • Keith White of CA PUC providing information

  9. Base Case Portfolio • Rest-of-WECC • IRP survey of LSEs outside of CA • L&R data for renewable projects by subregion

  10. OTC/ESA Generation Resources • WEIL scenario to evaluate the impact of removing resources subject to Once-Through-Cooling (OTC) and Endangered Species Act (ESA) • Mary Johannis took lead in developing list of generation resources subject to OTC and ESA potential restrictions • Generation to be removed identified, now working on what to add