GroundMed DAQ/DMS Training Coimbra 6-12-2011

GroundMed DAQ/DMS Training Coimbra 6-12-2011. Andre Quintino Duarte Anibal T. de Almeida Joao Fong. Summary. 1. DAQ - Data Acquisition System 1.1. Hardware Installation 1.1.1. Devices’ Assemblage 1.1.2. Power Connections 1.1.3. Communication Connections 1.1.4. Sensors Connections

farrah
Download Presentation

GroundMed DAQ/DMS Training Coimbra 6-12-2011

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. GroundMed DAQ/DMS Training Coimbra 6-12-2011 Andre Quintino Duarte Anibal T. de Almeida Joao Fong

  2. Summary • 1. DAQ - Data Acquisition System • 1.1. Hardware Installation • 1.1.1. Devices’ Assemblage • 1.1.2. Power Connections • 1.1.3. Communication Connections • 1.1.4. Sensors Connections • 1.2. Software Installation • 1.2.1. Software Configuration • 1.2.2. Measuring Utility • 2. DMS - Data Management System (NEW) • 3. Further Development in Coimbra • 4. Questions and Answers • 5. Coimbra GroundMed facility visit

  3. Info All information available at: www.isr.uc.pt/~groundmed

  4. Info All information available at: www.isr.uc.pt/~groundmed

  5. 1. DAQ - Data Acquisition System

  6. 1. DAQ - Data Acquisition System National Instruments cRIO 9074

  7. 1. DAQ - Data Acquisition System National Instruments cRIO 9074 NI 9217 NI 9871 NI 9219

  8. 1. DAQ - Data Acquisition System DAQ

  9. 1. DAQ - Data Acquisition System DAQ Brunata Thermal Meters Carlo Gavazzi Meters Humidity Sensor Pyranometer Indoor/Outdoor Temperature Sensors

  10. 1. DAQ - Data Acquisition System DAQ System DAQ

  11. 1. DAQ - Data Acquisition System Septemes les Vallons, France DAQ System Internet Oradea, Romenia DAQ System Internet Coimbra, Portugal DAQ System Internet GroundMed WebSite Benedikt, Slovenia DAQ System Internet DMS Server Valencia, Spain DAQ System Internet DAQ System Barcelona, Spain Internet Padova, Italy DAQ System Internet DAQ System Athens, Greece Internet

  12. 1.1. Hardware Installation 1.1.1. Device’s Assemblage

  13. 1.1. Hardware Installation 1.1.1. Device’s Assemblage Coimbra

  14. 1.1. Hardware Installation 1.1.1. Device’s Assemblage Barcelona

  15. 1.1. Hardware Installation 1.1.2. Power Connections

  16. 1.1. Hardware Installation 1.1.3. Communication Connections

  17. 1.1. Hardware Installation 1.1.3. Communication Connections Important: - Create an RS-485 network; - Use shield cable with 2 twisted pairs; - Connect shield to ground; - Connect a 120Ω resistor on the edges of the network; - All the devices on the network must have different addresses; - The order is not important.

  18. 1.1. Hardware Installation 1.1.3. Communication Connections

  19. 1.1. Hardware Installation 1.1.4. Sensors Connections

  20. 1.1. Hardware Installation 1.1.4. Sensors Connections Sensors: - Indoor Temperature Sensor; - Outdoor Temperature Sensor; - Pyranometer; - 2x Brunata (Flow Sensor and 2 Temperature Sensors each); - Current Transformers; - Humidity Sensor (Optional).

  21. 1.1. Hardware Installation 1.1.4. Sensors Connections

  22. 1.1. Hardware Installation 1.1.4. Sensors Connections Important: - Don’t mix Brunata Temperature Sensors; Brunata Display Unit Temperature Probes

  23. 1.1. Hardware Installation 1.1.4. Sensors Connections Important: - Don’t mix Brunata flow sensors; Flow sensor Brunata Volume Meter

  24. 1.1. Hardware Installation 1.1.4. Sensors Connections Important: - Each Brunata Display Unit has one and only one Volume Meter. Brunata Display Unit Brunata Volume Meter

  25. 1.1. Hardware Installation 1.1.4. Sensors Connections

  26. 1.2. Software Installation

  27. 1.2. Software Installation • Download and Install in this order: • 1. NI cRIO Drivers (about 1600MB)http://joule.ni.com:80/nidu/cds/view/p/id/2411/lang/en; • 2. RTAD Application Installer (about 10MB) http://zone.ni.com/devzone/cda/epd/p/id/5986;3. Asynchronous Message Communication (AMC) reference library (about 6MB) (Not required anymore) http://zone.ni.com/devzone/cda/epd/p/id/6091;4. Reference Library for Reading cRIO System Configuration Information (about 6MB) (Not required anymore)http://zone.ni.com/devzone/cda/epd/p/id/1717;5. GroundMed software from ISR available at: • www.isr.uc.pt/~groundmed;6. GroundMed Configuration Utility;7. GroundMed Measurement Utility.

  28. 1.2. Software Installation 1.2.1. Software Configuration

  29. 1.2. Software Installation 1.2.1. Software Configuration Set cRIO Time Zone, Time & Date: 1. Load MAX (Measurement & Automation) on the computer;2. Click on Remote Systems, then the cRIO module available;3. On the right size, click below on Time Settings;4. Set your Time Zone, Date and Time;5. Click above on Save.

  30. 1.2. Software Installation 1.2.1. Software Configuration Demonstration

  31. 1.2. Software Installation 1.2.1. Software Configuration Run RT Application Deployment: Software to install Your cRIO 1) Press Settings under “Application Images”; 2) Browse to load the GroundMed downloaded image; 3) Press “Deploy”.

  32. 1.2. Software Installation 1.2.1. Software Configuration Demonstration

  33. 1.2. Software Installation 1.2.1. Software Configuration - 8 different demonstration sites Does this means 8 different software versions?

  34. 1.2. Software Installation 1.2.1. Software Configuration

  35. 1.2. Software Installation 1.2.1. Software Configuration

  36. 1.2. Software Installation 1.2.1. Software Configuration

  37. 1.2. Software Installation 1.2.2. Measuring Utility

  38. 1.2. Software Installation 1.2.2. Measuring Utility

  39. 1.2. Software Installation Demonstration

  40. 3. Further Development in Coimbra

  41. 3. Further Development in Coimbra

  42. 3. Further Development in Coimbra Finder Relay 20.21.9.024.4000 NI 9472 - 8 Sourcing Digital Outputs; - 6 to 30V range. - 24V Coil Voltage; - 250V AC Rated Voltage.

  43. 3. Further Development in Coimbra

  44. 4. Questions and Answers 5. Coimbra GroundMed facility visit

  45. 5. Coimbra GroundMed facility visit Thank You Andre Quintino Duarte Anibal T. de Almeida Joao Fong