Reconfigure visitor centre. Construct new offices & retail • Decommission & demolish offices Area 1,2 and offices on upper mezzanine Area 1 Area 2 Construction Phasing: Departures Phase 1 (4 months) Week 0 16 Delhi International Airport Existing International Terminal T2 Re-modelling Airport Design Consult ADC
Construct new outer check in desks and belts, landside retail, airside toilets, new transfer routes • Construction check in desks and belts line 2 • Construction check in desks and belts line 7 • Demolish airside toilets Construction Phasing: Departures Phase 2 (4 months) • Construct new Clipper Lounge on mezzanine Week 0 32 16 Delhi International Airport Existing International Terminal T2 Re-modelling Airport Design Consult ADC
Demolish west retail and wall dividing pre departures from gates • Construct new 1st phase emigration, customs & security in sections • Decommission west transit Construction Phasing: Departures Phase 3 (3 months) Week 0 44 32 16 Delhi International Airport Existing International Terminal T2 Re-modelling Airport Design Consult ADC
Decommission existing main security • Hoard off and demolish Clipper Lounge, east retail and wall dividing pre departures from gates • Construct remaining emigration, customs & security in sections Construction Phasing: Departures Phase 4 (3 months) • Commission part completed emigration, customs & security and west transit route Week 0 44 56 32 16 Delhi International Airport Existing International Terminal T2 Re-modelling Airport Design Consult ADC
Hoard off and construct new airside retail Construction Phasing: Departures Phase 5 (2 months) • Commission remaining emigration, customs & security and east transit route Week 0 44 56 32 64 16 Delhi International Airport Existing International Terminal T2 Re-modelling Airport Design Consult ADC
Delhi International Airport Existing International Terminal T2 Re-modelling OVERALL PROJECT SCHEDULE AUG-SEPT’ 06 OCT-NOV’ 06 DEC’ 06 – MAR’ 08 DESIGN, DRAWINGS & SPECIFICATIONS TENDERING & FINALIZING CONTRACTOR CONSTRUCTION IN 5 PHASES Airport Design Consult ADC