LHCb CALO commissioning meeting 7.07.08 Anatoli Konoplyannikov /ITEP/

XCAL commissioning with LED. News New LED scan and stability data for ECAL and HCAL were collected. First recipes for ECAL-C LED monitoring was created. During the LAST GC week the PHYSICS|COSMICS recipes for FE boards of ECAL and HCAL have been created together with Frederic .

Download Presentation

LHCb CALO commissioning meeting 7.07.08 Anatoli Konoplyannikov /ITEP/

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. XCAL commissioning with LED • News • New LED scan and stability data for ECAL and HCAL were collected. • First recipes for ECAL-C LED monitoring was created. • During the LAST GC week the PHYSICS|COSMICS recipes for FE boards of ECAL and HCAL have been created together with Frederic. • HCAL CW behavior with different LV values. • ECAL HV system study: • Two run (12 hours each) of the CW LV monitoring have been done (2 and 4 of July). • One of 32 HV board has a wrong behavior and will be repaired. • Modification of the HV boards of side A has been started. • Planning • XCAL LED monitoring recipe creation and detectors stability tests LHCb CALO commissioning meeting 7.07.08 Anatoli Konoplyannikov /ITEP/

  2. XCAL commissioning with LED Description of the collected data Aim is to improve the procedure of the LEDTSB recipe creation and XCAL middle term stability study. ECAL - A+C: Run coord: Marei-Noëlle/Anatoli ECAL data (1600 ev/step, each PMT flashing by 1/8 trigger freq, steps=13, tot_ev= 20800, Calibration trigger rate = 56 Hz):1. /castor/cern.ch/grid/lhcb/data/2008/RAW/ECAL/PHYSICS_TimeScan/26292 ... scan   HV = nominal, LEDTSB_del_C=150 ns;  LEDTSB_del_A=recipe_ecA_TSBrecipe_24893; LED_intens=nominal cnt;  FErecipe-Default. 2. /castor/cern.ch/grid/lhcb/data/2008/RAW/ECAL/PHYSICS_TimeScan/26299 ...scan   HV = nominal,  LEDTSB_del_C=ecC_TSBrecipe_23700;  LEDTSB_del_A=recipe_ecA_TSBrecipe_24893;LED_intens=nominal cnt;  FErecipe-Default. 3. /castor/cern.ch/grid/lhcb/data/2008/RAW/ECAL/PHYSICS_TimeScan/26308 ... no scan 10000events   HV = nominal,  LEDTSB_del_C=ecC_TSBrecipe_23700;   LEDTSB_del_A=recipe_ecA_TSBrecipe_24893; LED_intens=nominal cnt;  FErecipe-Default. 4. /castor/cern.ch/grid/lhcb/data/2008/RAW/ECAL/PHYSICS_TimeScan/26340 ... no scan   96000 events    HV = nominal,  LEDTSB_del_C=ecC_TSBrecipe_23700; LEDTSB_del_A=recipe_ecA_TSBrecipe_24893; LED_intens=nominal cnt;  FErecipe-Default. 10 min pause + 1600 event collect, time Points=60.   Started at 18:1 0 of 4.07.08, stopped at 4:33 of 5.07.08. The run includes two raw files.         The LV monitoring started at18:00  and stopped 6:13. HCAL - A+C: HCAL  data (1600 ev/step, each PMT flashing by 1/8 trigger freq, steps=13, tot_ev= 20800, Calibration trigger rate = 56 Hz):1. /castor/cern.ch/grid/lhcb/data/2008/RAW/ HCAL/PHYSICS_TimeScan/ 26361  ... scan   HV = nominal, LEDTSB_del_C=150 ns;  LEDTSB_del_A= 150 ns ; LED_intens=nominal cnt;  FErecipe-Default. 2 . /castor/cern.ch/grid/lhcb/data/2008/RAW/ HCAL/PHYSICS_TimeScan/ 26362  ... scan   HV = nominal, LEDTSB_del_C=150 ns;  LEDTSB_del_A= 150 ns ; LED_intens= 0.95 * nominal cnt;  FErecipe-Default. LHCb CALO commissioning meeting 7.07.08 Anatoli Konoplyannikov /ITEP/

  3. XCAL commissioning with LED HCAL HV system study. HV dependence of ΔU±6v worse case < 0.2 V, worse case < 0.5 V, worse case < 0.7 V, Output HV dependences for three HCAL CW bases versus LV power variation for three control voltages is shown on table. LHCb CALO commissioning meeting 7.07.08 Anatoli Konoplyannikov /ITEP/

  4. Test conditions: • Each minute LV voltages of all HV boards are measured • 720 points were measured ( 12 hours in total) XCAL commissioning with LED Time (hour) - 6 V power lines + 6 V power lines LV stability of ECAL HV board_4. All eight negative power have the same behavior. (Problem with -6V regulator or with inverting OA). Board has to be repaired. LHCb CALO commissioning meeting 7.07.08 Anatoli Konoplyannikov /ITEP/

  5. XCAL commissioning with LED DCU ADC (cnt) - 5.7 V < 0.3 V Time (hour) LV stability of ECAL HV board_4. One – 6 V channel in detail. LHCb CALO commissioning meeting 7.07.08 Anatoli Konoplyannikov /ITEP/

  6. XCAL commissioning with LED Wrong message [00:20:33] PBUSWrite <0000> [00:20:33] DCUChannelRead <Channel = 2 , Data = 0:20:23] DCUChannelRead <Channel = 1 , Data = 1501, Converted Data = 1.6544> [00:20:23] Command Register <Read> <ECAL_HVboard4.mLED13.rPWR> [00:20:23] PBUS MUX write 0000 at addr d4, then read DCU channel 1 [00:20:23] PBUSWrite <0000> [00:20:24] DCUChannelRead <Channel = 1 , Data = 1503, Converted Data = 1.6532> [00:20:24] Command Register <Read> <ECAL_HVboard4.mLED14.rPWR> [00:20:24] PBUS MUX write 0000 at addr d5, then read DCU channel 1 DCU ADC (cnt) DCU ADC log file of 4.07.2008 Normal message SpecsServer_2008-7-4 log file Time (hour) Typical Specs DCU error. During 12 hours few tens errors appear for both side of ECAL. For a first LV stability run for ECAL-C (2.07.08) there were no any Specs errors. LHCb CALO commissioning meeting 7.07.08 Anatoli Konoplyannikov /ITEP/

  7. XCAL commissioning with LED DCU ADC log file of 2.07.2008 At this time about 5 AM the HV was switched off by Xavier and LV DCU ADC was changed on 7 counts. Time (hour) For a first LV stability run for ECAL-C (2.07.08) there were no any Specs errors. LHCb CALO commissioning meeting 7.07.08 Anatoli Konoplyannikov /ITEP/

  8. First look on the data XCAL commissioning with LED sample T0 sample Next1 ECAL LED response. First recipe of the LEDTSB delay settings has now about 7% of miss calibrated delay channels and will be improved. LHCb CALO commissioning meeting 7.07.08 Anatoli Konoplyannikov /ITEP/

  9. XCAL commissioning with LED First look on the data 8 PMT stability curves illuminated by one LED Normalized amplitude Normalized amplitude hour LEDTSB address 130110 Typical ECAL-C PMT stability is similar stability of A side Each point corresponds of the mean value of PM amplitude for 200 events hour LEDTSB address 130136 LHCb CALO commissioning meeting 7.07.08 Anatoli Konoplyannikov /ITEP/

  10. XCAL commissioning with LED • Conclusion • PHYSICS|COSMICS recipe was created for all XCAL FE electronics. • New LED scan and stability test data have been collected. • First HCAL/ECAL recipes for LEDTSB delay and FE-PIN ADC delay chips were created. In the same time development of the automated procedure of the recipes creation for the LED monitoring system will be continued. • New stability tests for HCAL and ECAL are planning with more realistic PMT anode current load. LHCb CALO commissioning meeting 7.07.08 Anatoli Konoplyannikov /ITEP/

More Related