An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CALO maintenance overview Yu. Guz 2014/05/21

  2. ECAL LED monitoring system replacement • commissioning: • Broken fibers (repaired): 3 at side C, 4 at side A • 3 cells at the side A have no signal, q. fibers are OK, need access to PMTs (dead CW or contact problem), next week • contact problems at the FEB side: few at the side A, much worse at the side C (next slide) • TODO: • General commissioning • Carefully fix contacts at the FEB end (in progress) and PMT end: • one more access to PMTs side C may be needed later • Tune: • LEDTSB timing • PIN amplitudes: mechanical arrangement of PIN fibers, voltage dividers for signal • PIN FEB timing Yu. Guz 2014/05/21

  3. ECAL commissioning • Fixing loose contacts (a source of instabilities), both at the FEB side and at the PMT side • Side C for the moment, fixed by now: • ~80 ATI connectors (FEB end) • ~40 BERG connectors (PMT side) • more expected … • Side A next week: • less problems expected with ATI • few loose BERG connectors (PMT side)seen with the reflection test, few days access to PMTs is foreseen ATI connectors side C (crimped in 2006) Yu. Guz 2014/05/21

  4. HCAL PMT degradation • Helium test performed (Pavel) • the good (stable) and bad PMTs degrade with equal speed • the reason of degradation of PMTs at HCAL is not understood  good PMT bad PMT Yu. Guz 2014/05/21

  5. HCAL maintenance and plans • maintenance of both garages of the source calibration system (replacement of a rubber membrane) performed • PMT replacement at the side A • 49 new PMTs have to be installed • planned after the ECAL access • for the moment: preparing new PMTs for replacement • new HCAL CW boards are being produced (40) Yu. Guz 2014/05/21

  6. AOB Blue light (460 nm) • another irradiation test of quartz fibers at UKL (Louvain-la-Neuve) is planned for beginning of July. This time the purpose is: • measurement of the depth of fast degradation/annealing cycles as a function of dose rate, using the sample already irradiated in 2013 • measurement of the wavelength dependence of degradation 825 krad 100 krad 300 krad 530 krad Yu. Guz 2014/05/21