1 / 12

ISO Liaison Report

ISO Liaison Report. Hidenori Shinoda Charles Parisot. ISO/TC215 meeting was held in Melbourne, Australia between Aug. 11 th and 15 th. Charles Parisot and Hidenori Shinoda attended as DICOM Liaison. Aug. 12 th : ISO/TC215 opening plenary meeting. Aug. 13 th – 14 th : WG2 meeting

gad
Download Presentation

ISO Liaison Report

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ISO Liaison Report Hidenori Shinoda Charles Parisot

  2. ISO/TC215 meeting was held in Melbourne, Australia between Aug. 11th and 15th. • Charles Parisot and Hidenori Shinoda attended as DICOM Liaison. • Aug. 12th : ISO/TC215 opening plenary meeting. • Aug. 13th – 14th : WG2 meeting • Aug. 15th : ISO/TC215 closing plenary meeting.

  3. Charles made a presentation on Web Access to DICOM Persistent Objects.

  4. Charles proposed

  5. WG2 accepted our proposal as an NWI. • We jointly edited our new work item proposal with WG2.3(Methodology) and WG2.1(Device) consecutively. • TC215/WG2 finally decided to form WG2.4(Web Access to DICOM Persistent Objects). • Co-Chair: Nicholas Brown (ISO) Hidenori Shinoda (DICOM) • WG2 proposed this NWI to TC215 at the preliminary meeting and TC215 approved this item as a WG2 work program at Stage 0.

  6. Rough Schedule 1st Draft of the supplement 18th : Review the 1st Draft at 1st t/con 11th : 2nd Draft of the supplement 30th : Review the 2nd Draft at 2nd t/con Review a draft at DICOM/WG6 meeting Face-to-face joint meeting at San Antonio DIS will be prepared and the draft will be submitted to the public comment. Review comments for the draft at t/con TC215 meeting at Oslo, Norway September, 2002 October, 2002 November, 2002 December, 2002 January, 2003 February, 2003 March, 2003 April, 2003 May, 2003

  7. Current members of the WG2.4 • From ISO/TC215 • Nicholas Brown (Co-Chair, UK) • Melvin Reynolds (Chair person of WG2.1(Device),UK) • Thomas Norgall (Germany) • Donald Singley (Kodac, ??) • ISO secretariat may announce and recruit other members from national member bodies. • From DICOM • Members of WG6

  8. ISO Standard Development Process (FYR)

  9. International Standard Development Process Stage 1: Proposal stage The first step in the development of an International Standard is to confirm that a particular International Standard is needed. A new work item proposal (NP) is submitted for vote by the members of the relevant TC/SC to determine the inclusion of the work item in the programme of work. The proposal is accepted if a majority of the P-members of the TC/SC votes in favour and at least five P-members declare their commitment to participate actively in the project. At this stage a project leader responsible for the work item is normally appointed. Stage 2: Preparatory stage Usually, a working group of experts, the chairman (convener) of which is the project leader, is set up by the TC/SC for the preparation of a working draft. Successive working drafts may be considered until the working group is satisfied that it has developed the best technical solution to the problem being addressed. At this stage, the draft is forwarded to the working group's parent committee for the consensus-building phase.

  10. International Standard Development Process Stage 3: Committee stage As soon as a first committee draft is available, it is registered by the ISO Central Secretariat. It is distributed for comments and, if required, voting, by the P-members of the TC/SC. Successive committee drafts may be considered until consensus is reached on the technical content. Once consensus has been attained, the text is finalized for submission as a draft International Standard (DIS). Stage 4: Enquiry stage The draft International Standard (DIS) is circulated to all ISO member bodies by the ISO Central Secretariat for voting and comment within a period of five months. It is approved for submission as a final draft International Standard (FDIS) if a two-thirds majority of the P-members of the TC/SC are in favour and not more than one-quarter of the total number of votes cast are negative. If the approval criteria are not met, the text is returned to the originating TC/SC for further study and a revised document will again be circulated for voting and comment as a draft International Standard.

  11. International Standard Development Process Stage 5: Approval stage The final draft International Standard (FDIS) is circulated to all ISO member bodies by the ISO Central Secretariat for a final Yes/No vote within a period of two months. If technical comments are received during this period, they are no longer considered at this stage, but registered for consideration during a future revision of the International Standard. The text is approved as an International Standard if a two-thirds majority of the P-members of the TC/SC are in favour and not more than one-quarter of the total number of votes cast are negative. If these approval criteria are not met, the standard is referred back to the originating TC/SC for reconsideration in the light of the technical reasons submitted in support of the negative votes received. Stage 6: Publication stage Once a final draft International Standard has been approved, only minor editorial changes, if and where necessary, are introduced into the final text. The final text is sent to the ISO Central Secretariat which publishes the International Standard.

  12. Review of International Standards (Confirmation, Revision, Withdrawal) All International Standards are reviewed at least once every five years by the responsible TCs/SCs. A majority of the P-members of the TC/SC decides whether an International Standard should be confirmed, revised or withdrawn.

More Related