News from ESRF Jean-Michel Chaize Tango collaboration meeting 13/14 May 2009. News from ESRF. The upgrade program Changes in the ESRF Staff Structure Construction Program Accelerator and Source Upgrades New Beamlines Program TANGO@esrf.fr. ESRF Programme 2009-2018.
E N D
News from ESRF Jean-Michel Chaize Tango collaboration meeting 13/14 May 2009 TANGO collaboration
News from ESRF • The upgrade program • Changes in the ESRF Staff Structure • Construction Program • Accelerator and Source Upgrades • New Beamlines Program • TANGO@esrf.fr TANGO collaboration
ESRF Programme 2009-2018 Structural/functional biology, and soft matter Science at extreme conditions New, better science Pump-and-probe experiments and time-resolved science X-ray imaging Nanoscience and nanotechnology TANGO collaboration
New Beamlines and New Instrumentation Structural/functional biology, and soft matter Science at extreme conditions Partnerships and Collaborations Accelerator and Source New, better science Pump-and-probe experiments and time-resolved science X-ray imaging Nanoscience and nanotechnology Data Processing and Computing Laboratory and Experimental Hall Buildings TANGO collaboration
The ESRF Council – in November 2008 – decides: To support the concept of the ESRF Upgrade as presented by the ESRF Management To provide a budget of ~180 M€ to finance the Phase-I Base Package in the 2009-2015 period To approve the 2009 budget with the first contribution to the ESRF Upgrade Programme. TANGO collaboration
News from ESRF • Changes in the ESRF Staff Structure • Construction Program • Accelerator and Source Upgrades • New Beamlines Program • TANGO@esrf.fr TANGO collaboration
ESRF Structure: from 1 - 05 - 2009 TANGO collaboration
A new Division for the ESRF: Instrument Service and Development Division • Bringing together: (120 people) • Detector and Electronics • Mechanical Engineering • X-ray Optics • Software • Advanced Analysis and Modeling TANGO collaboration 8
The software group ISDD head J. Susini Advanced Analysis modelling X ray optics Software group A.Götz 32 people Detectors and electronics Mechanical engineering Accelerator Control unit JM Chaize 9 people Beamline Control Unit L. Claustre 16 people Data Analysis Unit C. Ferrero 7 people projects team projects team projects team projects teams Online analysis team Tango team TANGO collaboration
News from ESRF • Changes in the ESRF Staff Structure • Construction Program • Accelerator and Source Upgrades • New Beamlines Program • TANGO@esrf.fr TANGO collaboration
Experimental Hall Extention project Creation of ~7,500sqm of « golden slab », for nano-experiments. Possibility to extend up to 13 beamlines at 110m/120m. Creation of 1 LOB with ~4,000sqm of labs, offices, multi-purpose areas… Satellite buildings for « extra long beamlines » (to enable a length of 150/250m instead of 110m) Future extension possibilities are kept for labs, partnerships, … TANGO collaboration 28th April 09 E. Bruas, Project Manager 11
Main principle for the extensions Extensions without LOB TANGO collaboration 28th April 09 E. Bruas, Project Manager 12
EX2 project: timescale • 2009: • June 2009: Council will be invited to approve the recommendation to place a contract with architect compagny • July 2009: start of the detailed design studies, • 2010: • Validation of the design reports and call for tender to be launched for the building companies • March 2011: start of works • 2011: • Building works • Mid 2011: Shutdown of the facilities (3 to 4 months to be confirmed), to allow the main excavation works, networks rerouting and slab creation… (which will produce vibration, dust, services cut-off…) • 2012: • Around mid 2012: full commissioning of the buildings, extension of the beamlines can start… TANGO collaboration 28th April 09 E. Bruas, Project Manager 13
Development of the joint site ILL/ESRF« Project Contract State-Region - CPER » • October 08: signature of the « Site Contract » by the local authorities, particularly for the Large Scale Facilities (ESRF and ILL) for a total amount of 15M€: • 2009: An additional budget could be addedto build IBS2 • The main objective is to develop partnership facilities and site visibility: • to develop ambitious research programmes in collaboration with external users of the highest scientific excellence • to improve the on-site science support to users • to boost the academic programme by better opportunities (PhD thesis students,…) • to implement a platform with better support for industrial and applied research activities TANGO collaboration 28th April 09 E. Bruas, Project Manager 14 14
TOTAL CPER budget: 15M€ Scientific partnerships New Site Entrance, restaurant, reception/shipping platform Visitors’ centre TANGO collaboration 28th April 09 E. Bruas, Project Manager 15 15
We are not alone! Building of IBS on site Upgrade of CEA Upgrade of CNRS Upgrade of Biomerieux A new rocade on site Building of high schools New tramway on avenue New Hotels A total of 800 M€ investment 200 000 M2 of offices 200 000 M2 of scientific buildings 100 000 M2 of universities 5000 apartments… Starts in 2010! A big mess! TANGO collaboration
News from ESRF • Changes in the ESRF Staff Structure • Construction Program • Accelerator and Source Upgrades • New Beamlines Program • TANGO@esrf.fr TANGO collaboration
SR-BPM completed • 32 cells * 7 BPMs = 224 Libera Brilliance • BPMLibera TANGO server from SOLEIL • Difficulties to stick with a common version: • Libera firmware not the same • Different way to use the Libera. E.g. Offsets, Turn by turn • Specific needs to each institut. E.g arctan algorithm, Incoherencies • BPMLiberaAll TANGO device server • Collect the X and Z positions for the SOFB • Make current dependancy corrections • Make HDB positions archiving • Will allow to make Turn by Turn measurement. • Applications: • Debugging (uses ATK panel) • Configuration tools: first installation, upgrades, TANGO configuration. • Clients: SRCO, LABview survey application TANGO collaboration
Beam Orbit Plot 10 mm 20 Cells with LIBERA-BPMs 8 Cells with Old BPMs Electronics 4 Cells with Old BPM Electronics a drastic improvement of resolution! TANGO collaboration
6 H&V 18 ch 8 H&V 24ch 6 H&V 18 ch 7 H&V 21ch Correctors Power Supplies Correctors Power Supplies Correctors Power Supplies Correctors Power Supplies 18 RS485 24 RS485 18 RS485 PMC Feedback Processor Rocket IO ----- ----- E t h Ethernet 21 RS485 C P U PMC Feedback Processor Rocket IO --- --- BPM BPM BPM BPM BPM BPM BPM BPM BPM BPM BPM BPM BPM BPM Group of 7 Liberas BPMs Cell-n Cell-m Cell+n Cell+m Feedback Processor 4 cabinets of 18 corrector’s channels each (AVG) BPMs of 2 consecutives cells over 8 and correctors scheme for 1/4th of the machine (SRDC) One of the 96 sextupoles housing the correctors Fast Orbit Feedback • In development • Itest powersupplies • Sniffer TANGO collaboration
Insertion Devices A new Cryogenic Undulator in 2009-2010 A prototype steerer developed for the canted beamlines Design work for a 2.5 m in-vacuum undulator TANGO collaboration
New LINAC Pre-injector in August 2009 • Cathode obsolescence • Use CLIO/SOLEIL Gun • Higher Current in 16 bunch • Bunch Cleaning TANGO collaboration
SSA at SOLEIL Solid State RF Amplifier (SSA) 600 kW + 450 kW SSA for Booster Cavities and future ID23 cavities soon to be ordered TANGO collaboration
RF Cavities with Higher Order Mode Damping • Design and prequalification made at the ESRF • Tendering for prototypemanufacturing in May 2009 TANGO collaboration
6 m or 7 m ID straight Section • Prototype on ID30 (August 2009) • Standard for most beamlines TANGO collaboration
News from ESRF • Changes in the ESRF Staff Structure • Construction Program • Accelerator and Source Upgrades • New Beamlines Program • TANGO@esrf.fr TANGO collaboration
Spending profile for the Upgrade TANGO collaboration
UPBL1,UPBL4UPBL8 Five science highlight areas: UPBL10 UPBL11UPBL6UPBL7 UPBL3UPBL9 UPBL2UPBL5 TANGO collaboration
Status as of today Autumn 2008 SAC endorsed TDR work to start on three projects TEXAS, MASSIF, NINA Expected for Autumn 2009 SAC meeting Further TDRs for subsequent SAC meetings TANGO collaboration
First batch of beamlines in the upgrade Move ID20 to ID06 UPBL11 (TEXAS): BM29 to BM23 UPBL04 (NINA): ID22 to ID16 UPBL10 (MASSIF): ID14 to ID30 UPBL06: ID16 to ID20 TANGO collaboration
39 new insertion devices 6m and 7m straight sections 300 mA operation 13 upgraded beamlines 5 moving beamlines 13 refurbished beamlines Enhanced data treatment facilities What can we offer after the upgrade TANGO collaboration
More beamlines to take care Construction, development, support Existing beamlines more complex Massive use of Icepap motor controllers Nano manipulation => intelligent controllers => device servers to write Archiving features becomes necessary Get read of VME VPAP -> Icepap (ready) Counter/timers ->Pci (ready) ADC/DAC to be studied Work on Data format (Nexus, HDF5) Implementation of Sardana Replace SPEC... Huge work for migrating 15 years of work Consequences on beamline software support TANGO collaboration
News from ESRF • Changes in the ESRF Staff Structure • Construction Program • Accelerator and Source Upgrades • New Beamlines Program • TANGO@esrf.fr TANGO collaboration
Detailed evaluation made by ATOS origin Comparison with EPICS and SCADA solutions Test bench mounted by Steeve Hunt Participation to several meetings in Cadarache TANGO@ITER ITER decided to use EPICS TANGO collaboration
144 subscibers to Tango mailing list ESRF,SOLEIL,ELETTRA,ALBA,DESY MAXLAB (Sweeden) FRMII (Germany) CEA (France) IN2P3 (France) EMBL (France, Germany) Kurchatov Institute, Moscow (Russia) Ansto (australia) Infn (Italy) PSI (swiserland) Institute for Plasma Research (India) Eso (germany) Cosylab, Maatel, Atos Origin,... Gmail...! Other potential TANGO users TANGO collaboration
Thank you! TANGO collaboration