1 / 6

SIS Update on Eastern Seams Issues

SIS Update on Eastern Seams Issues. WECC SIS Meeting 2/1/12 Salt Lake City, UT. Eastern-side Seams Topics. MISO-PJM JOA Update https://www.midwestiso.org/Library/Repository/Tariff/Rate%20Schedules/Rate%20Schedule%2005%20-%20Midwest%20ISO-PJM%20JOA%20and%20CMP.pdf

garth
Download Presentation

SIS Update on Eastern Seams Issues

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SIS Update on Eastern Seams Issues WECC SIS Meeting 2/1/12 Salt Lake City, UT

  2. Eastern-side Seams Topics • MISO-PJM JOA Update • https://www.midwestiso.org/Library/Repository/Tariff/Rate%20Schedules/Rate%20Schedule%2005%20-%20Midwest%20ISO-PJM%20JOA%20and%20CMP.pdf • Also Utilicast recently completed a baseline evaluation of the MISO-PJM agreement, available as a stand-alone document.

  3. Eastern-side Seams Topics • Broader Regional Markets Initiative • Also known as the “Lake Erie Loop Flow” issue

  4. Eastern-side Seams Topics • Market to Non-Market Issues • PFVT: a NAESB effort to address untagged non-firm flows within a BA boundary and improve market coordination • NDEX: MISO is deploying a new real-time stability assessment tool and associated transmission limit calculator

  5. Eastern-side Seams Topics • MISO-SPP SOA Renegotiations (Entergy) https://www.midwestiso.org/Library/Repository/Tariff/Rate%20Schedules/Rate%20Schedule%2006%20-%20Midwest%20ISO-SPP%20JOA%20and%20CMP.pdf

  6. Reference Site • Many areas to gather information • MISO reference: https://www.midwestiso.org/WhatWeDo/StrategicInitiatives/Pages/Seams.aspx • Seams management workshop/recording link: https://www.midwestiso.org/Events/Pages/SMWG20110721.aspx

More Related