Maintenance and Accelerator Support RHIC run10
Wednesday May 5th: • Very Short maintenance this time around • RHIC: • Tunnel areas to CA at *0800. Delays in some areas due to increased HP survey activity. • NOT ALL AREAS OPENED • No Berm access and power outages limited • AGS NO ACCESS PP Studies • LINAC and Booster remain running for NSRL
Major jobs: • RHIC: • Maintenance items only at this time. • LL timing effort continues • AGS: • Polarimeter C15 continued work • Controlled access only
Scheduling Meeting • Here at 1430hrs. • Attendance by ALL groups performing work essential for continued success. • Those needing access ANYWHERE must attend to avoid missing access windows.
Schedule 0800hrs AGS switch to PP operations Experiments to XA HP Surveys at beam dumps, collimators etc. 0830hrs RHIC CA in select areas ONLY 0930hrs Begin RHIC RF checkout (RF to RFNA mode) 1100 hrs Begin RHIC MMPS restoration 1200hrs Sweep Experimenter IRs 1230hrs Begin physics restoration