60 likes | 163 Views
Maintenance and Accelerator Support. RHIC run10. Tomorrow:. Similar schedule to last maintenance this time around RHIC tunnel opened at 0800 and closed by 1400 for equipment checkout RHIC beam at 1600. Major jobs:. RHIC: Spin flipper 10 Hz correctors AC work in tunnel, IRs AGS:
E N D
Maintenance and Accelerator Support RHIC run10
Tomorrow: • Similar schedule to last maintenance this time around • RHIC tunnel opened at 0800 and closed by 1400 for equipment checkout • RHIC beam at 1600
Major jobs: • RHIC: • Spin flipper • 10 Hz correctors • AC work in tunnel, IRs • AGS: • No Major work- inspections • Booster • BtA work • ON FOR NSRL!
Scheduling Meeting • 1530 here Today • Attendance by all groups is key to success • Those needing access should attend to avoid missing access windows • Reminder: Submit all jobs by 1300 Monday to allow for scheduling!