An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ERP Status Overview Steve Gigliotti Chief, Division of Safety Coal Mine Safety & Health

  2. Overview • Number of approved ERPs • Number of installed systems

  3. C&T Inspection Procedures • PIL being drafted • Compliance with ERP • PPL P09-V-01 • Qs & As • System components Part 23 approved • Verify C&T system is operational by randomly communicating during inspection and comparing route of travel with electronic records on the surface

  4. C&T Inspection Procedures • Responsible person on surface to monitor location of miners underground (75.1600-1) • Two way communication inside RA (75.1600-3) • Identifying number on miner’s brass tag worn on belt matches identifying number in system (75.1715) • Minimum safe distance to prevent interference with blasting circuits (75.1323(a)) • C&T systems shall remain operational during fan stoppages or a mine power outage (75.313)

  5. Overview - Consolidate Q&A documents for next round of ERPs

  6. QUESTIONS?