90 likes | 228 Views
ERP Status Overview. Steve Gigliotti Chief, Division of Safety Coal Mine Safety & Health. Overview. Number of approved ERPs Number of installed systems. C&T Inspection Procedures. PIL being drafted Compliance with ERP PPL P09-V-01 Qs & As System components Part 23 approved
E N D
ERP Status Overview Steve Gigliotti Chief, Division of Safety Coal Mine Safety & Health
Overview • Number of approved ERPs • Number of installed systems
C&T Inspection Procedures • PIL being drafted • Compliance with ERP • PPL P09-V-01 • Qs & As • System components Part 23 approved • Verify C&T system is operational by randomly communicating during inspection and comparing route of travel with electronic records on the surface
C&T Inspection Procedures • Responsible person on surface to monitor location of miners underground (75.1600-1) • Two way communication inside RA (75.1600-3) • Identifying number on miner’s brass tag worn on belt matches identifying number in system (75.1715) • Minimum safe distance to prevent interference with blasting circuits (75.1323(a)) • C&T systems shall remain operational during fan stoppages or a mine power outage (75.313)
Overview - Consolidate Q&A documents for next round of ERPs