Danbury Board of Education July 27, 2011 Space Challenges. Space Challenges for the FY 2011-2012. Three-Year Enrollment Increase: 2008 - 2010. 2011 – 2012 Enrollment Projections.

gent
Download Presentation

Space Challenges for the FY 2011-2012

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Danbury Board of Education July 27, 2011 Space Challenges Space Challenges for the FY 2011-2012

  2. Three-Year Enrollment Increase: 2008 - 2010

  3. 2011 – 2012 Enrollment Projections K-5 should remain at approximately 5,220. However, this is 258 (+5%) students over the enrollment projection by an external demographer 6-8 will increase by approximately 70 students 2010 - 2011: 2,208 2011 - 2012: 2,279 9-12 should remain at approximately 2,890

  4. 39%: Students Who Move In and Out of Our Schools Annually

  5. Class Size Targets for 2011 - 2012

  6. We are continuing to follow the recommendations that were reviewed with the Board of Education • The greatest enrollment challenge as of today is at grade three • The enrollment numbers are extremely volatile and will continue to change daily • Our 39% mobility rate contributes to the challenges • The professional demographers were not completely accurate Space Challenge Considerations

  7. REMEMBER– cutting below the cuts that were made last year.

  8. Place a moratorium on technology equipment expansion • Delay graduation requirements • Reallocate existing staff and resources wherever possible to meet basic operational needs • Continue to aggressively pursue cost containment and saving measures Budget Presentation Excerpts and Space Challenge Considerations

  9. Review of Space Study Recommendations to address enrollment challenges • Review of Yellow and Red School Enrollment Data challenge sheet • Review of Art and Music locations by school Space Challenge Considerations

  10. Space Challenge Considerations

  11. Space Challenge Considerations

  12. Space Challenge Considerations

  13. Space Challenge Considerations

  14. Continue to monitor enrollments throughout the summer with principals and secretaries • In situations in which there is already an enrollment concern, e.g. Shelter Rock we will: • Freeze permissive transfers • Not allow that school to be a “receiving Choice school” • Any new registrations will be assigned to a “sister school” which has lower enrollment and close proximity for a period of one year Space Challenge Considerations: Short Term

  15. Conduct a redistricting study in those schools in which there is significant overcrowding and make recommendation to the BOE by the first Board Meeting in September 2011 • In conjunction with the 2020 Committee explore the use of MRI as either a third middle school or a new K-5 school Space Challenge Considerations: Long Term