1 / 13

9th meeting of the Floods Working Group Agenda point 10 “Reporting” WGF 9, 31.3.1.4.2011

9th meeting of the Floods Working Group Agenda point 10 “Reporting” WGF 9, 31.3.1.4.2011 Budapest, Hungary. Maria Brättemark, WFD Team, DG ENV.D.1, European Commission. Preliminary Flood Risk Assessment (art 4-5). Reporting deadline 22.3.2012

gerald
Download Presentation

9th meeting of the Floods Working Group Agenda point 10 “Reporting” WGF 9, 31.3.1.4.2011

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 9th meeting of the Floods Working Group • Agenda point 10 “Reporting” • WGF 9, 31.3.1.4.2011 • Budapest, Hungary. • Maria Brättemark, WFD Team, DG ENV.D.1, European Commission

  2. Preliminary Flood Risk Assessment (art 4-5) • Reporting deadline 22.3.2012 • Schemas, GIS Guidance, tools drafted and 1 round of testing finalised. • 2nd round testing starting early April to early May 2011. • Testing includes final enumeration lists for types of floods and consequences. • All WG F members are invited to take part in testing and comment in writing on the schemas, lists and GIS Guidance. • Finalisation at the FDRDG June 2011. • Tools to be finalised and operational July 2011.

  3. Preliminary Flood Risk Assessment – Enumeration lists • Types of floods, divided into : • A: 1 sources of floods (obligatory level) • Fluvial, pluvial, groundwater, sea water, artificial water bearing infrastructure, other, no data available • A:2 Mechanism of flooding • A:3 characteristics of flooding • Types of consequence, divided into : • Human health (Human health, community) • Environemnt (waterbody status, protected areas, pollution sources) • Cultural heritage (Cultural assets, Landscape) • Economic (Property, infrastructure, rural land use, economic activity) • Part of the testing, final round of written comments from other WGF Members , Drafting group to finalise in June.

  4. Reporting - testing phase http://icm.eionet.europa.eu/schemas/dir200760ec/resources/

  5. Visualisation Information basis (art 4) Past or potential future flood – examples of visualisation

  6. Visualisation art 5 - Which assessment is used- Areas of potential significant flood risk APSFR (art 5) – examples of visualisation

  7. Flood Hazard and Flood Risk maps (art 6) • Reporting deadline 22.3.2014 • Reporting sheets approved in November 2010. • Schemas, GIS Guidance, tools to be issued to the FDRDG end of April, for written comments until the next meeting • One first round of testing fore seen over the summer. • This step is expected to be more technically complex than previous reporting steps, so an early start to develop technical formats foreseen. • The role of INSPIRE obligations will be important and will be taken into account in this process.

  8. Flood Risk Management Plans – reporting sheet • Reporting deadline 22.3.2016 • Flood Risk Management Plan Reporting Sheet Version 9 submitted to FDRDG 8 (16.2) • Further consideration of appropriate links with WFD reporting deemed necessary in 2011: • including the WFD-FD questionnaire • further developments on the Reporting sheets for the interim WFD report (2012) , which includes a component of reporting progress on specific measures • Proposal to present this for adoption in the Autumn Water Directors • Next steps : • Comments on the Enumeration lists for types of measures from WG F • Presentation of progress from WG F to WG D (8.4.2011), with emphasis on the need to coordinate the reporting of the two set of plans in 2016. • Commission to propose version 10 of the draft reporting sheet to next FDRDG (scheduled mid-June) • Reporting sheet to be presented to WG F, SCG and WD in the autumn.

  9. WISE Developments • New WISE portal launched 22.3.2011 : water.europa.eu • New Wise viewer launched same day with interactive maps • 2nd WISE implementation plan in production, to be discussed next week by WG D • The WISE IP can then be sent to WG F/drafting group for comments

  10. INSPIRE • Inspire Annex I technical specifications adopted in 2010 • Includes Hydrology, technical specifications and also a guidance document • Annex II and III TS expected to be sent for consultation in the summer, and after that testing at the end of the year • M Pfeiffer has made a progress report, available on CIRCA Drafting group

  11. Next drafting group • 8-9 or 15-16 June – Doodle link circulated today • Hope to have INSPIRE experts present – chair of the TWG NZ • Finalisation PFRA tools • Progress Map schema and GIS guidance • Progress FRMP Reporting sheets

  12. Reporting –Key links • CIRCA : http://circa.europa.eu/Members/irc/env/wfd/library?l=/floods_programme_1/d-drafting_groups/reporting_grafting&vm=detailed&sb=Title • Example of resources available here : • Drafting group meetings • Compilation of Reporting sheets agreed so far • INSPIRE resources, including progress report by M. Pfeiffer, focus Thematic Working Group on Natural Risk Zones : http://circa.europa.eu/Members/irc/env/wfd/library?l=/floods_programme_1/d-drafting_groups/reporting_grafting/inspire&vm=detailed&sb=Title • Report net : • Including draft PFRA schemas and GIS Guidance : • http://icm.eionet.europa.eu/schemas/dir200760ec/resources/

  13. More information Thank you for your attention ! http://ec.europa.eu/environment/water/flood_risk/index.htm Maria Brättemark, Desk officer Floods/WFD, European Commission, DG ENV.D.1

More Related