An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. JASON2 Status in NOAA Gary Petti Office of Satellite Data Processing and Distribution

  2. JASON2 Mission • 4-party Agreement between NOAA, NASA (JPL), CNES, and EUMETSAT Identifies Roles and Responsibilities (in an MOU) • NOAA • Command and Control of Satellite • Wallops & Fairbanks CDA Ground Stations • Operational Data Processing • Operational & Offline Data Distribution • Archive • EUMETSAT • Usingen Ground Station • Operational Data Processing • Operational Data Distribution • CNES • PROTEUS Satellite Bus • Command and Control of Satellite (before handover to NOAA) • Poseidon-3 Altimeter • DORIS orbit determination system • Science Data Processing • Offline Data Distribution • Archive • NASA (JPL) • Advanced Microwave Radiometer • GPS orbit determination system • Laser Retroreflector • Delta-II Launch Vehicle

  3. JASON2 Sensors • CNES • Poseidon-3 (C and KU Band): Dual Frequency RADAR Altimeter • DORIS: Doppler Orbitography and Radiopositioning Integrated by Satellite • T2L2: Time Transfer by Laser Links; Compare distant clocks and aid in characterization of DORIS noise • LPT: Light Particles Telescope (Japan); Radiation in Satellite Environment • Carmen-2: Environment Characterization and Modelization; Radiation in the Satellite Environment • NASA • AMR: Advanced Microwave Radiometer • LRA: LASER Retroreflector Array • GPSP: Global Positioning System Payload

  4. JASON2 Status • Launch Scheduled for June 15 2008 from Vandenberg • NOAA • Command and Control; In place • Operational Data Processing; Under development • Operational Distribution: Under development • Archive by CLASS; Initial support & testing begin Jan. 2008 • EUMETSAT • Operational Data Processing; Under development • Operational Distribution; Under development • CNES • Poseidon Altimeter; Completed, Mated to S/C • Science Data Processing System; Under development • Payload instrument integration occurred December 2006 – June 2007 • Satellite assembly, integration, test – June 2007 to January 2008 • NASA (JPL) • AMR; Completed Mated to S/C • Launch Services (Delta ll 7320); Scheduled

  5. JASON2 Products • Operational Geophysical Data Record (OGDR) • Produced by NOAA and EUMETSAT within 3 hours of observation • Native NetCDF format as well as OGDR-BUFR format • Operational Distribution from DDS • Orbit computed onboard from DORIS to 10 cm • Ground contact based files (products) • Interim Geophysical Data Record (IGDR) • Produced by CNES within 1-2 days • Segmented by passes (half orbital revs) • NetCDF format • 2.5 cm orbit accuracy • Geophysical Data Record (GDR) • Produced by CNES within 60 days • Cycle (10-days) based & pass segmented • NetCDF format • 1.5 cm precise orbit • O/I/GDR Contents • Sea Surface Height • Wind speed • Significant Wave Height • RADAR Backscatter • S-IGDR & S-GDR contain radar echo "waveforms" • O/I/GDR-SSHA products also available: reduced 1-Hz datasets

  6. JASON2 Schedule • Launch June 15, 2008 from Vandenberg • 1 month Orbit Acquisition & instrument checkout • Cycle 1 begins ~ July 16, 2008 • 5 months NRT Verification • NRT Data Distribution by NOAA & EUM begins Dec, 2008 • Do operational users want first 5 months of the NRT data reprocessed with final algorithms/software? • 5 more months Offline Verification • Offline data Distribution: May 2009 • Project begins using “final” algorithms at this time