1 / 11

Toward Enterprise GIS in Total E&P Indonesie

Toward Enterprise GIS in Total E&P Indonesie. Puguh SARWANTO (TOTAL E&P INDONESIE). Thank you. Click to play video. Introduction. Operation area in Mahakam Delta cover 11 site custodianships within area 6,281.5 km2

gisela
Download Presentation

Toward Enterprise GIS in Total E&P Indonesie

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Toward Enterprise GIS in Total E&P Indonesie Puguh SARWANTO (TOTAL E&P INDONESIE)

  2. Thank you Click to play video

  3. Introduction • Operation area in Mahakam Delta cover 11 site custodianships within area 6,281.5 km2 • Development of TEPI’s Enterprise GIS is divided into 4 Phases (Stand-alone, Centralize Data, Web Application & Integration) and has been developing since 2006

  4. Highlights • Introducing WebGIS in TEPI is tremendous way to publish and share geospatial data and activities. It’s changing the way of daily operation activities. • GIS-Mahakam is integrating 9 databases from 6 divisions (Engineering Facility, Field Operation/Production, Geoscience, HSE, Marine-Logistic, Drilling-Well Service)

  5. < BACK WebGIS-Mahakam User Statistics* Web-GIS have been accessing since June 2009, by 12 divisions, more than 35 departments. • Total Users : 2,684 ( 60% of TEPI population) • Total Hits : 100,957 hits • Average per day : 84 users and 207 hits • Average per month : 750 users ( 17% of TEPI population) • Special Training have been conducted to 448 people * Data per October 05, 2011

  6. 6 - Reference, date, place

  7. WebGIS-Mahakam Applications • PLANNING, DESIGN & PRE-PROJECT (USERS) • Well Planning (support Well Surface Meeting)* Business Development, Geoscience, Engineering Facility, Drilling, Societal • Well Site Preparation* Engineering Facility • iCon Integration Geoscience • SIGEO* Engineering Geophysics & Geotechnical • OPERATION • Well Service Well Service • Seismic Activities Exploration • Work Permit Field Operations/Production • Marine Hazard Marine Logistic • Production - Plant Information Field Operations/Production • AVTS (Real-time monitoring & Playback) Engineering Facility & Marine Logistic • HSE and Societal • Geographic Response Strategy & Oil Spill Simulation* Environment • Anomaly – Pipeline Pipeline Inspection • Anomaly – Societal point of view Societal/Land Affair • Land Asset Documentation* Societal/Land Affair * Still in ArcGIS Desktop

  8. WebGIS-Mahakam Impact & Way Forward • Users Requests  Handling Requests Mechanism • Organization  GIS Committee was established by NOO No. EVP/013/2011 on April 7th 2011. • Deputy Executive VP as Chairman • The member are from Survey Departement, IST, Geoscience-Data Management & New Venture • New Development Features: • Marine Vessel Route Planning to minimize travelling cost and access time to location • Monitoring Logistic Distribution & Inventory • Integrated Planning for Well Site Preparation • Working Permit Planning for Clash Management • PRODOM & SAP Integration

  9. “In the past, the main source of positioning risk was during data acquisition. Today, the main source of positioning risk is no longer data acquisition, but data management!” Terima kasih….!

  10. < BACK Mahakam Delta Paris • Operation activities in 11 RSES Site Custodianships, and average 300 Work Permits are opened every day. • GIS-Mahakam store 1913 existing wells + 700 future wells, 258 platforms, 1630 km pipeline, 2862 piles, 1144 valves, 400 fleets movement, 7 location of weather station,100 other objects/layers, more than 10,000 CAD drawing files & 1,040 survey documents (14,447 files) Mahakam versus Paris

  11. < BACK GIS Development Phases Phase 1: Desktop Application Development 2006 - 2007 Phase 2: Centralized Geodatabases & Servers 2008 - Q1 2009 Phase 3: Intranet Web-GIS Application Development Q2 2009 - Q2 2010 Phase 4: Enterprise Databases Integration 2010 - 2012 < BACK

More Related