1 / 31

NM USER FORUM 2014

Operations outlook and NM proposals for 2014. NM USER FORUM 2014. Giovanni Lenti Head of Network Operations 30/01/2014. Agenda. NM Operations Center (NMOC) activities Network Manager’s contributions to ops performance 2013 en-route target Airport delays

graham
Download Presentation

NM USER FORUM 2014

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Operations outlookand NM proposals for 2014 NM USER FORUM 2014 Giovanni Lenti Head of Network Operations 30/01/2014

  2. Agenda • NM Operations Center (NMOC) activities • Network Manager’s contributions to ops performance • 2013 en-route target • Airport delays • Report on Mandatory Cherry Picking (MCP) • Overview of 2013 events generating AFTM delays • Looking into 2014 • Addressing the issues in the ops relationship • NMOC reorganisation • NMOC priorities & expectations for 2014

  3. NMOC Activities Flight Planning activities • IFPS (Integrated FPL System) • 65,000 FPL messages treated by IFPS every day (> 20 million/year). • 92% of FPL messages are correctly filed to IFPS by AOs • 3.7% are manually processed in IFPS (2,400/day) • 4.3% are rejected. • 6% of flights are generated from Repetitive FPL Data (RPL) • More services • RPL • AMON(Arrival Monitoring, Vienna trial) • Flight efficiency(Opportunity Tool) • CSST (Callsign Similarity) • SAFA(Black-list alerting) • ACC3 (Cargo security alerting)

  4. Callsign Similarity Service • 55 AOs signed up for the CSS Tool (CSST) • 21AOs received training and are actively using CSST output in operations: Easyjet, Adria, Swiss, Ryanair, Air France, Germanwings, Meridiana, BA Cityflier, Finnair, Air Berlin, Flybe, Tarom, Transavia Holland, HOP, KLM, Aegean, SunExpress, Air Portugal, Flybe Finland, Iberia, Jet2 . • More than 1000 similarities analysed and recorded • CSST users have less risk ofcall sign confusion than non-users: 8% vs. 14% • Role of CSST Team • Publication of ‘anti-similarity’ rules. • Support to AO’s (Training/Familiarization). • Gathering feedback/monitoring the results of the implementation. Do you want to join? Please contact:nm.csmc@eurocontrol.int

  5. Flight Efficiency pilot project • Nov 2013: • RPL starts • Savings so far: • 33,513 miles • 201 tons fuel • 670 tons CO2 • 167,565 Euro • May 2013: • IFPU1 starts • Savings so far: • 215,017 miles • 1,188 tons fuel • 3,960 tons CO2 • 990,080 Euro April 2014: IFPU2 will start FE • NMOC started to use the FE Opportunity tool in pilot mode inMay 2013 • Total savings since May: • 248,530 nautical miles • 1,389tons of fuel = 4,630 tons of CO2 • 1,157,645Euro With combined FE activity of IFPS1, IFPS2, RPL Teams and more AO’s joining we expect a considerable increase in savings for 2014. Do you want to join? Please Contact:philippe.lenne@eurocontrol.int

  6. Airspace Data Management activities (CACD/CADF) • Creation/update of all static/dynamic data in CACD (Centralised Airspace & Capacity Database) in support ofCADF (Centralised Airspace Data Function). • Data are updated daily or at each AIRAC. Static/dynamic data in the system: • 21,945Significant points • 8,455Airspaces (FIR + Sectors+ Military) • 7,392 Aerodromes • 4,616 ATS Routes • 14,546Terminal Procedures (SID, STAR…) • 929Aircraft Types • 7,789Traffic Volumes (with 8415 flows) • 27,215Units (FPL and ETFMS messages distribution) • 19,200Restrictions (RAD + EU/EURO+ FUA, PTR, FRA,…) Static data can only be changed at AIRAC date Dynamic data: daily changes

  7. CACD/CADF activities 2013 • 600 NOTAMs (average) were monitored daily and about 50 required an action in CACD. • 500 daily live updates (average) • 120daily static updates (average) • 35 airspace pre-validations done in collaboration with ANSP/States on site (7 ongoing for 2014) • Staff involved in several activities: • AUP/UUP daily ‘business’ • Restrictions required for NM Operations: RAD, PTR’s, all kind of events (civil, military, …) • Airspace Data alignment (Published data vs Operational used data)

  8. The NM (Flow management) contribution in 2013 • In 2013, the Network had a total of 9,568,399 flights (minus 0.8% vs 2012 traffic) and 8,772,688 minutes of ATFM delay of which: • Total 2013 Airport delay: 3,728,974 minutes • Total 2013 En-route delay: 5,043,714 minutes • The en-route target for 2013 was set at 0.60min/flight. The recorded value is 0.53min/flight, so target was lowered. • The NM committed to improve the overall en-route delay in 2013 by minus 10%. In order to achieve such target, several sub-targets are defined in Network Manager Performance Plan (RRPs, weekend delays, number of regulations, flts delayed >30 mins etc). • The NM achieved 13,7% savings– therefore contributing to achieve the network target - (without NM contribution, the en-route delay would have been 0.61min/flight). • NMOC flow personnel performed  40,651 user manual actions (force/overriding slot, exclusions, rerouting proposals) saving 1,137,294minutes of ATFM delay of which: • NMOC reduction for airport delays: 337,749 minutes • NMOC reduction for en-route delays: 799,545 minutes

  9. En-route target 0.60 – lowered to 0.53 • Reasons for the decrease: playbook procedures/constantmonitoring of staffing & capacity delays, the NMOC actions, ANSP/OPL/NOS special events planning/mitigation, ANSP capacity plans, Airspace Users. • Most of weeks the en-route delay was lower than the weekly delay guideline (purple dotted line in graph), but still experienced a few noticeable spikes in performance. • Thanks to everyone who helped contribute towards the lowest en-route delay result on record! With some initiatives (e.g. weather playbook) planned this year, there is no reason why we shouldn’t be able to achieve or be lower than 2014 en-route target (0.50min/flight). ETF Strike TS & CB EGTT phone system French Strike LOWW transition to COOPANS TOPSKY & Pegasus Transition

  10. The NMOC contribution - Airports • The NM committed to save 5% of the overall delay for arrivals at 7 main airports: EGLL, LSZH, LEPA, EDDL, LFPG, EDDF, LTBA. • The overall NMOC delay saving for airports was 337,749mins. • The table below shows the percentage of reduction (all delay reasons) at:

  11. 2013: weekly Airport arrival delay/flight • The graph below was run as an ‘exercise’: we established a fictitious target for airport delays (0.46min/flight) for 2013 and we monitored it all year. • The value achieved is 0.43min/flight. • The target set for 2014 is 0.40min/flight.

  12. First Rotation ATFCM restrictions (regulations) Flights with an EOBT between 0300-0900UTC (the ‘first rotation’) are subject to 49% of the overall airport ATFM arrival delays. The NM target is to reduce first rotation delays by – 5% 1 minute of ATFM delay during the first rotation generates 4 minutes of reactionary delay (average 2013) In 2013: 44% of delays for passengers were attributed to reactionary delays. Reactionary delaysimpact future EOBT Speaker: Yves De Wandeler 12

  13. Better punctuality => Better predictability => Less re-work • Airport ATFM arrival regulations:49% of delay is generated during first rotation (0300-0900UTC). • High proportion of reactionary delays:44% of delays all causes. • Reactionary delaysimpactthe airport/sectors loads (shift of the EOBT causes non realistic demand), re-work for dispatchers and ATFM delays. • Focus on first rotation ATFM restrictions to reduce reactionary delays (multiplier effect). • The CODA scheduling indicator will help AO’s - e.g. BTO (Block Time Overshoot = EET+ taxi in/out = the percentage of flights with an actualblocktime which exceeds the scheduled blocktime). • BTO > 40% => reactionary delays • BTO < 20% => early arrivals may trigger airport arrival restrictions • BTO in 2013 was 28% • We can ‘force’ shifting using standard ATFM regulations or MCP* (mandatory cherry picking regulations). MCP could take into account airline scheduling info to reduce impact and limit delay propagation through the Network. * MCP: ATFM regulation assigning a slot only to a few flights, all the others are excluded (no slot). More information? Come and see the CODA stand or mail to:coda@eurocontrol.int Speaker: Yves De Wandeler 13

  14. Report on Mandatory Cherry Picking (MCP) • Trial 2013: 30 MCP replaced 30 standard regulations in EDYY, LFEE With 30 MCP: - 130flights received CTOT (see note 2) - overall delay 1,462’ -delay saving 4,666’ What if 30 standard regulations??? - 2,126 flights subject to CTOT - Overall delay estimated 6,128’ (see note1) Note 1: Amount of delay based on standard application of regulation at declared capacity values Note 2: The 130 flights with CTOT were operated by 49 different Aircraft Operators • Next steps • EPWW joined the trial on 16th Jan • Trial to continue until 31st March 2014 • Subject to the necessary approval, MCP will become a permanent procedure for EDYY, LFEE and EPWW.

  15. Overview of few events generating ATFM delays • ETS strike in June, EPWW Pegasus21 transition, LCCC TOPSKY, EGTT phone failure in Dec + overview LPPC and EDGG. • Such events are ‘part of the game’ • Main concern of ANSP’s is to minimize problems for Airspace Users • There is absolutely……. NO BLAME TO ANYONE! • As ‘The Network Manager’ we have to be transparent and equitable in reporting, so we need to analyse the events in order to learn lessons towards future improvements.

  16. ETF strike June 2013 - Overview • ATC personnel in France joined the ETF (European Transport Workers Federation) strike from 11th June 04:00 UTC until 13th June 04:00 UTC. • More than 33,000 flights were subject to AFTM measures in 48 hrs. • French ATFM regulations generated 552,759’ (88% of the total strike delay) in 48hrs. • All ACCs surrounding French airspace were impacted by the re-routed traffic. ATFM measures applied due to extra traffic caused73,076’ (12% of all strike delay). • Total strike ATFMdelay:625,572’(added + 0.08’ to 2013 en-route target). • +/- 750,000additional nautical miles flown by flights avoiding French airspace. • Additional fuel burned in two days: 5,225tons = 16,512 CO2 tons. • 5,500 FPL’s cancelled.

  17. ETF strike June 2013 – the reroutings11th June 829 flights found mainly avoiding French airspace. enter your presentation title 17

  18. ETF strike June 2013 - The NM actions French ATFM regulations duration tailored at D-1 to strike participation forecast, in order to avoid excessive French airspace avoidance by over-flights. North Atlantic tracks adapted to avoid excessive load into Brest airspace. Agreement with Algeria/Tunisia to accept traffic with no clearance to avoid LFMM ACC delays. Max sector configuration asked to neighbouring ACC’s to minimize delays for rerouted flights. Network coordination to suspend military activities constraining capacity. Restrictions (iso zero-rate regulations) applied by NMOC CACD for some French airports. Continuous monitoring of Oceanic ‘Tango’ routes availability (balancing the slots for first rotation South-bound vs. North-bound flows) to reduce average delay. NMOC flow managers assisted AO’s via manual exclusion/forcing/overriding slots: 462 manual interventions in two days saved 27,289’ of delay. 124 manual RRP (rerouting proposals) sent by AOLO (84 accepted – 11,377’ of delay saved) NMOC FP personnel/AOLO assisted AU’s for FPL validation and rerouting suggestions. Frequent updated information to ANSP’s and AUs via NOP portal and AIM’s. Excellent coordination/cooperation with DSNA before and during the strike enter your presentation title 18

  19. ETF strike June 2013 - traffic & delay evolutionfrom 1600 UTC on 10th until 2359 UTC 11th June 0500 UTC 11th Brown line: delay evolution Blue line: delayed traffic evolution

  20. ETF strike June 2013 – Savings • The potential amount of ATFM delay for 11th + 12th June 2013 was more than 1,500,000 minutes. • The actual ATFM delay recorded was 625,572 minutes. • The considerable reduction was due to: • Improved sector configurations by DSNA • More than 1,600 flights avoided areas regulated due to strike • The overall actions of the Network Manager It is not possible so far to quantify the attribution of delay saving to any of the items above. The Network Manager can only claim delays for which we have a ‘certified’ evidence (38,666 minutes - Flow managers’ manual interventions and accepted rerouting proposals)

  21. London ACC phone failure – December 2013 • In the night btw Dec 6th/7th a technical problem of voice comms/phone panel (following an upgrade of the system) prevented radar sector splitting. This event limited the EGTT ops-room to the night time sector configuration of 5 sectors (that continued to be kept for part of the day). • ATFM regulations applied resulting in a peak of 195,000 minutes delay. • Several delay mitigation measures applied by EGTT FMP (Minimum Departure Intervals, level cap destination EHAM/EBBR, local level capping measures, rerouteing suggestions - not all of them followed by AO’s, likely due to increased workload for dispatchers). • NATS held 4 teleconferences. • NMOC provided full/constant support (Tact dedicated position) to NATS with rerouting guidance, Network coordination and use of NOP headline news and AIM to disseminate all available info. • EGTT were able to split gradually the sectors. At 1830utc system was stable and all ATFM regulations were cancelled by 1959utc. Final delay recorded:129,482 minutes. The event was handled very well by NATS with great support by NMOC

  22. EPWW (Warsaw) Pegasus21 (new ATC system) • EPWW had a traffic increase in 2013: +1.03% (+2.31 in summer) • Overall delay for EPWW in 2012: 352,182 minutes • Overall delay for EPWW in 2013: 344,909 minutes ( -2.07% vs 2012) • 118,589 minutes due to Pegasus21 so far. • The transition to Pegasus21 started on 26th Nov 2013 with a sector capacity reduction of -25%. • Several rerouting scenarios and restrictions(agreed with neighbours and Airspace Users) were applied daily from 26th Nov until 15th Jan, forcing flights to route out of Polish airspace in order to mitigate the expected ATFM heavy delays. • Capacity was and will be progressively increased (through the 3 main phases of the transition) to 100% until 15th May 2014, expected date of transition end. We expect further and considerable improvement for 2014.

  23. LCCC (Cyprus) TOPSKY (new ATC system) • LCCC had a traffic increase in 2013: +2.91% (+3.19% in summer). • Overall delayforLCCC in 2012:428,366minutes. • Overall delayfor LCCC in 2013:599,225minutes (+39,89%vs 2012). • 185,534minutes due to TOPSKY • Staffing/social issues/TOPSKY generated high delays since March 2013. • Transition to TOPSKY started on Sept. 2013 - Capacity reduction: -30 %. • Technical problems prevented return to 100% en-route sectors capacity. Transition ended on 21st Jan, capacities increased – but not at 100% yet. • The geo-political situation in the area is a further serious constraining factor. • NM put a great effort to mitigate the delays together with the ANSP • New airspace structure since June, missions of FM staff to Nicosia, review of procedures, scenarios, NMOC exploring daily solutions for delay saving at D-1/tactically, daily close contact with FMP).

  24. LCCC – Plans for 2014 and beyond • NM’s support to the ANSP and Airspace Users will not diminish. • We expect an improvement in overall delay for 2014, although it is difficult to make a reliable forecast at this stage. • EUROCONTROL NM is supporting the Cypriot Government to establish a new State owned company to deliver Air Navigation Services according to the performance requirements of the region. Target date for implementation: January 2015. • In parallel efforts are ongoing to address the current shortcomings - aggravated by the economic crisis and related EU bail-out conditions.

  25. LPPC (Lisbon ACC) overview • LPPC had a traffic increase in 2013: +2.30% (+3.02 in summer) • Overall delay for LPPC in 2012: 281,190 minutes. • Overall delay for LPPC in 2013: 121,000 minutes (-57% vs 2012). • NB: Increased average delays in Nov. & Dec. 2013 were due to the non availability of ATCO’s overtimes. • 2014: We expect considerable improvements due to a new sector configuration and new division flight levels in the West area (depending anyway on staff availability).  Noticeable improvement due to a better sector configuration planning, CDM with FMP.

  26. EDGG (Langen ACC) overview 2013 • EDGG had a traffic decrease in 2013: -1.99% (- 0.61 in summer) • Overall delay for EDGG in 2012: 787,844 minutes • Overall delay for EDGG in 2013: 287,941 minutes (-64% vs 2012) • 3,496 minutes due transition to PSS (Paperless Strip System). • The considerable 2013 delay reduction due to the combined efforts and long standing collaboration between DFS and the NM • review of airspaces, sector configurations, traffic volumes, agreed exclusions, improved pre-tactical planning. • The PSS transition started last November with a capacity decrease of -20% (increased to -10% in December). • The PSS transitiondidnot represent an issue so far thanks to the well done preparation of the event. We expect a rather stable situation for 2014

  27. Looking into 2014 Improve NMOC/ANSPs/AOs Ops relationship (1) • Disagreements/arguments with FMPs on ATFM measures application • Reasons: timing, window width, bunching at the end of regulations, ‘other’ misunderstandings • Limited to a few episodes in 2013 (7 complaints received) • Target = ZERO issue for 2014 (favorable trend) • Disagreements on ATFM regulation reasons • A delay Task Force submitted a proposal to ODSG to be discussed on 11th/12th February 2014.

  28. Looking into 2014 Improve NMOC/ANSPs/AOs Ops relationship (2) • Airspace Users do not like mandatory re-routing/level-capping scenarios or EU restrictions: The Network Manager needs to balance the needs of ANSPs and AUs. A complete freedom for AOs would causehigher/unbalanced delays and more regulations (obstacle to manual/automatic slot improvements). If scenarios are ‘banned’: it could trigger a reaction from ANSP changing most used scenarios into RAD measures to avoid ATFM regulations. Mandatory scenarios or EU restrictions are applied in case of: • Transition (to new systems) plans • Axis(South West, South East, North East and Ski) • Regulations with high delays • Special events • Military activities

  29. Looking into 2014 NMOC reorganisation (please don’t shoot the piano player :-) WHERE WE ARE • Negotiationwith Unions completed. • Reorganisation documentwill be sent to ECTL Members for endorsement. • New job descriptionsfor all NMOC profiles ready to open internal competitions. • As soon as (and if) endorsed, the transition process will start, lastingtwo years • Constantly increasing workloadfor NMOC personnel. WHAT DO WE WANT TO ACHIEVE? • Adapt NMOC structure to Network requirements. • Synergy among NMOC domains(e.g.: group of 25 Network Managers ensuring continuity from pre-tactical to the day of operations). • Free resourcesto intensify Flight Efficiency activity, to increase Network Ops support to SESAR projects, ANSP’s system transitions, Axis, airspace pre-validations, NM system releases, Airport CDM, internal ECTL projects etc.

  30. Looking into 2014 Priorities for 2014 WE WILL • Strongly commit to achieve all performance targets Challenge: en-route target will be 0.5min/flight yearly until 2019. • Focus on flight efficiency and delays – the right balance. • Focus on slot/delayed flights lists – Manual interventions to improve slots when ETFMS reaches limits, e.g. for flights subject to >3 ATFM regulations) • Improve delays due to Weather New risk assessment tool in ops, weather playbook. • Continue support and advice to ANSP’s for pre-validations, delay hotspots. • Improve relationship with FMPs and AO’s: not only familiarization visits but focus on specific problems – you’re all always more than welcome in NMOC… personal contacts = better results. • Finalize a common ATFCM manual (FMP’s + NM).

  31. Looking into 2014 Expectations for 2014 WE HOPE • (And we will) cooperate for a better CDM with FMPs for weather forecast and better use of ATFM measures. • That Airspace Users adheremore and more to FPL’s Better traffic predictions by NM and FMP’s DEFINITELY help improve delays  e.g.: Most regulations applied by LFEE are caused by poor adherence to RFL or by ‘yo-yo flights’. . • And wish not to experience any crisis!!! Many thanks for your attention!

More Related