110 likes | 236 Views
NM Development Plan 2012-2014. Moving Towards an Integrated ASM/ATFCM/ATS Approach Etienne de Muelenaere 20 September 2012. V4.5. NM Development Plan 2012-2014. Towards the Shared Business Trajectory. Towards Time Based Operations (STAM, TTA). Enhancing CDM in Network Operations.
E N D
NM Development Plan 2012-2014 Moving Towards an Integrated ASM/ATFCM/ATS Approach Etienne de Muelenaere 20 September 2012 V4.5
NM Development Plan 2012-2014 Towards the Shared Business Trajectory Towards Time Based Operations (STAM, TTA) Enhancing CDM in Network Operations Improved sharing of ATM data NOP Roadmap Improving current NM Services Improving current Technical Services DNM Development Plan 2013-2014
C/S deconfliction Multi-AOs C/S deconfliction Post-Deployment improvements Post-Deployment improvements Pre-Deployment improvements Post-Deployment improvements Programmes roadmap Release NM17.5 Release NM16.5 Release NM17 Release NM18 Release NM19 2011 2012 2013 2014 2015 Shared Business Trajectory 4D Profile, FPR eRestriction Trial - Use of 4D Profile Towards Time-based operations TTA Publication, STAM decisions promulgation Trial 1 Trial 2 Enhancing CDM in NOS operations Scenario data management Access to simulations Improved sharing of ATM data ADR Phase 1 UUID ASM-ATFCM CACD EAD Support to Prevalidation ATM data Publication Remote provision of ATM data Archiving ADR Data New NOP interfaces Crisis management NOP CSST FRA Incremental improvements CIAM CCAMS ICAO 2012 Domains C&T Incremental improvements DNM Development Plan 2013-2014 Research & Development Development & Deployment Post-Deployment (Correction and Tuning)
IFPS ETFMS CACD Towards the Shared Business Trajectory NM operations TOD TOC Use of AO 4D profile (FB499 – NM17) Reduce manual process for FPL (FB550 – NM17) STAR SID Taxi Consistent 4D Profile processing (FB460 - NM17) EET FPR(FB556 – NM17) eRestrictions (FB555 - NM17.5) FPL Domain improvements (FB523 – NM17.5) FPL Support via NOP (FB553 – NM17.5) FPL submission via the NOP (FB559 – NM17.5) DNM Development Plan 2013-2014 Flight Object (FB544) FIXM (FB554)
ETFMS IFPS Towards Time Based Operations (STAM, TTA) NM operations STAM Decisions promulgation(FB140 – NM17.5) Impact of STAM on IFPS/ETFMS Support to coordination via the NOP (cherry picking, measure edition,action flow, hotspot overview, hotspot in Flight list) Traffic Complexity (FB229 – NM17.5) ACC1 ACC2 ACC3 TTA TTA STAM Measures for flows (FB529 – NM17.5) TTA Publication (FB533 - NM17) DNM Development Plan 2013-2014
Enhancing CDM in Network Operations NM operations ENV updates (AUP, UUP, RAD, Configuration changes) Improve Performance Monitoring (FB456) Access to Simulation (FB360 - NM17) PREDICT Enhance Network Impact Assessment (FB283 – NM17) SIMEX NMC / MILO Release 17.5 Regulation editor (FB587 – NM17.5) Dynamic design of Reference Locations(FB514 – NM18) 2nd step TACT CACD ENV ops Traffic volume DNM Development Plan 2013-2014
Improved sharing of ATM data NM operations Publication of ATM Data through ADR: Live Updates(FB510 – NM17.5) and New Data (FB567 – NM18) CACD NOP Access Layer Interoperability between EAD and CACD (FB569 – NM17, FB511 – NM18) Remote provision of ATM / non-AIP data (FB532 – NM18) Prepare Ops Deployment with ASM tools (FB572 – NM17) EAD DNM Development Plan 2013-2014
NOP Roadmap Real-time network situation displays (TB100 – NM17.5) Flights impacted by crisis - consistent information sharing (FB562 – NM17.5) D+1 reports (FB561 – NM16.5) RAD input, Axis input (FB558 – NM17.5) FPL submission via the NOP (FB559 – NM17.5) FPL Support via NOP (FB553 – NM17.5) DNM Development Plan 2013-2014 Update NOP to NM banners (FB584)
ATFCM domain FPL domain Airspace Data Domain FB524 FB523 – NM17.5 FB550 FB528, FB536 – NM17.5, FB581 – NM17.5 ICAO 2012 CSST FRA CCAMS CIAM FB521 – NM17.5 FB588 – NM17.5 FB513 – NM18 FB526, FB576 – NM17.5, FB577 – NM18 TB106 FB537, FB575 – NM17.5 FB527 TB082 Interfaces Reporting FB489 – NM17.5 FB154, FB585 – NM17.5 Improving current NM Services DNM Development Plan 2013-2014
Improve NOP User experience – HMI alignment Access from new devices, Application desktop view(TB107– NM17) • Enhanced usability • (TB109 – NM17) • Most info within 3 clicks • Harmonize design • Search functionality • Enhanced print • Time-out and response time issues addressed • Centralization of • Users preferences • (TB093 – NM17) • Interface personalization NM operations Monitor Service Access (TB101 – NM17.5) DNM Development Plan 2013-2014
Release Schedule Scope Definition Dates • Release NM17.0 -> Done • Release NM17.5 -> Oct 2012 • Release NM18.0 -> Mar 2013 Migration Dates • Release NM17.0 -> Mar 2013 • Release NM17.5 -> Sep 2013 • Release NM18.0 -> Mar 2014 • Release Notes (NM16.5 and NM17) and Releases Deployment Plan (NM16.5) available at: • http://www.cfmu.eurocontrol.int/cfmu/public/standard_page/library_release_information.html DNM Development Plan 2013-2014