1 / 13

NM USER FORUM 2014

NM USER FORUM 2014. NM 2014/2015 functional improvements. Etienne De Muelenaere Network Strategy & Development 30 January 2014. Releases timeline. Free Route Airspace Advanced Flexible Use of Airspace NOP Information Services. NM Projects. Demand-Capacity Balancing

kris
Download Presentation

NM USER FORUM 2014

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NM USER FORUM 2014 NM 2014/2015 functional improvements Etienne De Muelenaere Network Strategy & Development 30 January 2014

  2. Releases timeline • Free Route Airspace • Advanced Flexible Use of Airspace • NOP Information Services NM Projects • Demand-Capacity Balancing • Optimized AU Operations • Dynamic Airspace Management SESAR R&D New NM Projects • Cooperative Traffic Management 2014 2015 2013 Oct Mar Oct Mar May NM18.NOP NM18.0 NM19.0 NM18.5 NM19.5 Functional Improvements NM User Forum 2014 - NM 2014/2015 functional improvements 2

  3. NM Project - Free Route Airspace NM Achievements • Oct 2011 - Initial Deployment of NM systems • In 2013, 10 ACCs have either fully or partially implemented FRA (with one X-border) • End of 2013, 5 additional ACCs planned 0.1% October 2014 Avoid Boundary DCT 0.1% Rule for route substitution NM User Forum 2014 - NM 2014/2015 functional improvements 3

  4. NM Project - Advanced Flexible Use of Airspace PREDICT SIMEX TACT CACD NM operations Interoperability with local ASM Tools Network Impact Assessment October 2014 ASM interoperability level 1&2 Dynamic Updates Test Airspace not published Export NAT Tracks in AIXM 5.1. Format NMC / MILO ASM Tools Operational Static Data eAMI AOs, ANSPs eRAD NM User Forum 2014 - NM 2014/2015 functional improvements 4

  5. NM Project - NOP Information Services Cooperative ATFCM Services Trial in Spring 2014before ops PREDICT SIMEX Scenario editor Via the NOP (FB587 – NM18.0) TACT Cooperative Flight Management Summer 2014 FPL submission via the NOP (FB559 – NM18.NOP) NM User Forum 2014 - NM 2014/2015 functional improvements 5

  6. NM Project - NOP Information Services Q1 2014 Updating the CFMU URLs (incl B2B) (FB592 - NM18.0) All Users EVITA Phase II – enhanced interface (FB538 - 2014) Mid-2014 All Users EACCC Crisis Management Pack (FB562 –Mar 2015) Mar 2015 NOP access to event info (FB591 – NM17.5.2 – Internal Prototype) (FB630 – 2014) Network Events Repository Mid-2014 All Users NM User Forum 2014 - NM 2014/2015 functional improvements 6

  7. V3 V3 V3 V3 V3 V3 V2 SESAR Research & Development - Planning 2013 2014 2015 2016 • STAM • Edition, What-If • Coordination DCB • STAM • Interops INAP Tools Extended TTO/TTA V3 AMAN Integration V2 Extended FPL FOS AU Ops Slot Swapping OAT FPL Dynamic AS ASM Real-Time Release NM18.5 Release NM18 Release NM19 Release NM20 Release NM21 NM User Forum 2014 - NM 2014/2015 functional improvements

  8. Airborne flight trajectories (Newbridge) Scope: Improved predictability when post-dep trajectories received by the AUs from their airborne flights, are sent to the NM. STAM Ops Trial 2014 • Scope: • Hotspot management • STAM proposal definition • STAM collaboration and implementation • Implementation monitoring STAM Ops Trial 2015 Scope: Interoperability with local ATC Planning tools SESAR – DCB (Demand-Capacity Balancing) Operational Validations Sep 2014 May 2014 May 2015 NM User Forum 2014 - NM 2014/2015 functional improvements

  9. Slot Swapping (UDPP) • Scope: Enhance Slot Swapping capabilities and check benefits: • Slot swapping partners display + swap in one click • Reconcile CDM airport delay and ATFCM delay • Priority adaptation for swapped flights Military (OAT) FPL Validation of military flight plan by IFPS SESAR – Optimized AU Operations Operational Validations Summer 2014 Q4 2015 NM User Forum 2014 - NM 2014/2015 functional improvements

  10. PREDICT SIMEX TACT Interoperability with ASM Tools for real-time Scope: ASM/ATFCM coordination until the real-time activation of airspaces or routes (with local ASM tools) CACD SESAR – Dynamic Airspace Management ASM Tools Operational Validations Q4 2014 NM systems NM User Forum 2014 - NM 2014/2015 functional improvements

  11. V3 V3 V3 V2 Future NM Project - Cooperative Traffic Management 2014 2015 2016 2017 • STAM • Edition, What-If • Coordination SESAR • STAM • Interops INAP Tools Extended TTO/TTA V3 AMAN Integration • STAM • Edition, What-If • Coordination • Scenario Mgnt • Post-Ops • STAM • Interops INAP Tools • Scenario Mgnt • Post-Ops Cooperative Traffic Management • Adherence • Intruders surveil. • Late updates • Predictability monitor • TTA/AMAN Integration • Metring Fix Mgnt • TTA/AMAN Integration • D/E/A MAN reconciliation Release NM18 Release NM19 Release NM20 Release NM21 Release NM22 NM User Forum 2014 - NM 2014/2015 functional improvements

  12. Promotion on Communication about Releases: • Release Notes http://www.eurocontrol.int/publications • Webex http://www.eurocontrol.int/publications • Others NM User Forum 2014 - NM 2014/2015 functional improvements 12

  13. Questions? NM User Forum 2014 - NM 2014/2015 functional improvements 13

More Related