1 / 7

SSHAC Guidelines in NGA-East Project

SSHAC Guidelines in NGA-East Project. Dr. Annie Kammerer, P.E. (Most slides borrowed from Dr. Kevin Coppersmith) NGA-East Sigma Workshop Organizational Meeting. US NRC Projects to Assess Seismic Hazard in CEUS.

Download Presentation

SSHAC Guidelines in NGA-East Project

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SSHAC Guidelines in NGA-East Project Dr. Annie Kammerer, P.E. (Most slides borrowed from Dr. Kevin Coppersmith) NGA-East Sigma Workshop Organizational Meeting

  2. US NRC Projects to Assess Seismic Hazard in CEUS Central and Eastern US Seismic Source Characterization project for Nuclear Facilities (CEUS SSC) Next Generation Attenuation Relationships for the Central and Eastern (NGA-East) Recommendations for Application of the SSHAC Guidelines Source Characterization Ground motion prediction equations Framework for large PSHA studies

  3. Background • NUREG/CR-6372, “Recommendations for Probabilistic Seismic Hazard Analysis: Guidance on Uncertainty and Use of Experts” • Framework for integration of expert assessments and treatment of uncertainties • CEUS SSC Project SSHAC level 3 • Need to consider how NGA-East can incorporate the SSHAC guidelines

  4. Goal • To capture the center, body, and range of views of the invormed technical community • Broadens ownership • Increases assurance that uncertainties have been captured • Can be peer reviewed by those with comparable knowledge of the community

  5. Motivation • Differences in results of EPRI and LLNL PSHA lead to understanding of approach to conduct of study • Consideration of alternate interpretations creates a more stable regulatory process and increased acceptance of outcomes • Range of opinion believed to provide more stable estimates

  6. Two important activities • Evaluation • Identification of important data • Interaction among experts • Consideration and weighting of proponent viewpoints • Integration • Represent the informed technical community • Use expert assessments

  7. Roles • Expert roles • Evaluator expert • Resource expert • Proponent expert • Normative expert • Technical integrator or Technical faciliatator/integrator • Participatory peer review panel

More Related