FINANCIAMIENTO DE UN PROYECTO:

FINANCIAMIENTO DE UN PROYECTO:. FÁBRICA DE CEMENTO USANDO LOS CUADROS DE FUENTES Y USOS DE FONDOS. PROCEDIMIENTO PASO A PASO. CD. UNIVERSITARIA, NOVIEMBRE 2009. Capturado por: Alberto Esparza Reséndiz. PASO 1. Construir el proyecto: Créditos (1) Ks, (2) BIRF u otro banco AÑO 1955

hadar
Download Presentation

FINANCIAMIENTO DE UN PROYECTO:

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. FINANCIAMIENTO DE UN PROYECTO: FÁBRICA DE CEMENTO USANDO LOS CUADROS DE FUENTES Y USOS DE FONDOS. PROCEDIMIENTO PASO A PASO. CD. UNIVERSITARIA, NOVIEMBRE 2009. Capturado por: Alberto Esparza Reséndiz

  2. PASO 1.

  3. Construir el proyecto: Créditos (1) Ks, (2) BIRF u otro banco • AÑO 1955 • DCP = J = 0 • KP = 50 um = K • L = Crédito BIRF = 15 um • Fuentes: • N = TOTAL = ΣF = 0 + 50 +15 = 65 um • ΣF = F = 65 um

  4. ΣF = se reparte en (1) Programa de trabajo y (2) Calendario de inversiones. • ΣUe = (15 + 8 + 5 + 1.5 + 5 + 1 + 0 + 0) = 35.5 um = UΣ • Resultados 55 = (ΣF = 65 um); (ΣU = 35.5 um) • (ΣF – ΣU) = 65 – 35.5 = 29.5 D. Final, 1955. • Disp. Final P = DFP = 1955 = 29.5 (um) Pasará como DCP 1956

  5. PASO 2.

  6. 1956 • J = DCP = 29.5 UM • K = 0.0 • L = BIRF = 25.0 UM • ΣF = 54.5 UM • Se reparten los F = 54.5 UM en: • ΣUsos = (25 + 8 + 5 + 1.5 + 0) = 39.5 UM • (ΣF – ΣU) = (54.5 – 39.5) = 15 UM • (DFP) 56 (DCP) 57 ΣF

  7. PASO 3.

  8. 15 DCP 10 CRED. BIRF ΣFUENTE • 1957 • DCP = 1957 = 15 (UM) (+) BIRF = 10 UM • ΣF = (15 + 10) = 25 UM • Se reparten en ΣUsos = (10 + 6.6 + 3.4 + 0.6 + 0) = ΣU = 20.6 UM • (ΣF – ΣU) = (25 – 20.6) = 4.4 (UM) pasarán como (DCP) = 4.40

  9. PASO 4.

  10. 1958 • Empieza a funcionar el proyecto al 80% de la Ci = X debido a que es una FCA = cemento = Intermitente = 365 d/anuales. • 1 mes = 2 m = 3 m = Rep. Grales. • Datos: • A = U1 = Yn = Pv • X = 360 x 100.00 (tn/a) = 36 (M UMo) 80% = Y58 = 80% = 28.8 M (UMo)

  11. 1 = 58 2 = 59 3 = 60 Imp = I% i% = i% I % = año • (1) Costos totales = (10.7 + 5.2 + 4.1 + 0.4) = CT = 20.4 M(UMo) = 1958 • C = [ (UAIi) antes de pagar ] • C = A – B = (Y – Cr) = UBruta y/o Marg. = 28.8 – 20.4 = 8.4 M(UMo) • = no I % no i % UB UNAIi = 8.4 M(UMo)

  12. PASO 5.

  13. I % = 0 = D = 1958 i % = 2.3 M(UMo) = E (I + i) = (058 + 2.358) = 2.3 M(UMo) • UN • UN = C = UN – (D + E) = [8.4 – (0 + 2.3)] = 6.10 M UM • UN = F = 6.10 M(UMo) Después de pagar I e I % en 1958 = UDIi

  14. PASO 6.

  15. Cálculo de rentabilidades. • G = R1% = ( UI, i / KPs) x 100 = (F / KP) = (UDIi / K = KP) * 100 = (6.1 / 50) x 100 = 12.2 % • R2 = (Por todo el crédito, son 2) = 12.2 / 2 = 6.1 % (58) • (I) Cociente = [ UDIi / i (% BIRF)] = F / E = 6.1 / 2.3 = 2.65 M(UMo) = Capacidad de pago del proyecto en 1958. R1 = 12.2% i% = 2.3 M(UMo)

  16. PASO 7.

  17. Sigue funcionando el proyecto 1958 • Tenemos = DCP58 = DFP 57 = 4.4 M(UMo) • ¿Cómo se crea Fi? Crea el proyecto sus propias fuentes internas (ΣF) (UNIi + DEP) = Fuentes no distribuidas.

  18. PASO 8.

  19. F = UNDIi = 6.1 (MUMo) DL =4.1 = M(UMo) (6.1 + 4.1) = 10.2 M(UMo) • K = 0 • L = 0 • Fint = proyecto 58 = 10.4 M(UMo) Utilidades retenidas • Disp. Co. Periodo = [(DCP)58 + (Fuente interna)] = • (ΣFuentes)58 = (DCP + UDIi) = 14.60 M(UMo) = Total fuentes 4.40 = DCP58 = J 10.20 = Fint = M 14.60 (N)

  20. BIRF 1 Dividir 2 • ΣF = Fuentes 1958 • ¿Cómo se repartirán? Pagar a • Aplicaciones (U) • * Kp = 50 M (UMo) ΣU = (7) crédito BIRF + (8) Div (10% de Kp)* ΣU = 2.80 + 5 = 7.80 M(UMo) U = 7.80 M(UMo) 50 x 10 100 = 5

  21. (ΣF – ΣU) = (Total fuentes) – (Total aplicaciones) = 14.60 – 7.80 • (F – U) = 6.80 (MUMo) 1958 = (DFP)58 • (DFP)58 = 6.80 (MUMo) pasar a (DCP)1959 Y así sucesivamente

  22. PASO 9.

  23. 1958 = Garantía que ofrece el proyecto para pagar servicio de la deuda. • Cálculos Flujo Neto de Efectivo = FNE = Disponible antes de “A”. • (1) Disponible en efectivo = letra = C = UNAIi = 8.4 M(UMo) • UAIi = 8.4 M(UMo) = letra C = cuadro 1958 Y = 28.8 CT = 20.4 8.4

  24. KT = Ke otros 2.3 M(UMo) i% 2.8 M(UMo) BIRF 5.10 M(UMo) + • (2) Deuda = Carga Financiera = formada por: • Costo financiero = (i% + i% BIRF) = • (3) Cociente = (UADIi + DL*) / Carga financiera = • (8.40 + 4.10) / 5.10 = 12.5 / 5.10 • * DL = 4.1 M(UMo) • Cociente = CF = Disponible en efectivo para pagar servicio de deuda (ΣCFinan) 12.5 5.10 = = 2.45

  25. Tengo 2.45 veces (+) para pagar mi deuda = 5.10 = Salida • Tengo a mi haber = Flujo de entrada = 12.5 M(UMo)

  26. GRACIAS