1 / 1

Joint Reconnaissance and Autonomous Targeting System (JRATS) Master Schedule

Joint Reconnaissance and Autonomous Targeting System (JRATS) Master Schedule. FY27. FY20. FY21. FY22. FY23. FY24. FY26. FY19. FY25. Milestones & Phases. Production & Deployment LRIP effort FRP/ Operations & Support. Increment 1. FRP DR. IOC.

halia
Download Presentation

Joint Reconnaissance and Autonomous Targeting System (JRATS) Master Schedule

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Joint Reconnaissance and Autonomous Targeting System (JRATS) Master Schedule FY27 FY20 FY21 FY22 FY23 FY24 FY26 FY19 FY25 Milestones & Phases Production & Deployment LRIP effort FRP/ Operations & Support Increment 1 FRP DR IOC Contract Award Lot 3 Lot 2 Lot 4 Lot 5 Lot 6 Dev Testing DT ECPs JITC Interop Cert Operational Testing OTRR IOT&E FOT&E BLRIP Deliveries Lots 1 & 2 (LRIP) Full Rate (Lots 3-6) JRATS Inc 2 (BC sensor ) IOC TD Phase EMD Phase Budget / POM @ $2M Per FY] Full Rate $150M LRIP $10M DHS Production Contract TIME NOW Version 1.1 3-28-13

More Related