TRANSFER SM PM Jean-Claude CAU 27/09/2010
1st topic General Page 3 2nd topic Transfer process Page 5 3rd topic Transfer Page 6 4th topic Topic area Page 1 5th topic Topic area Page 1 Agenda Transfer SMPM for Commercial – 27/09/2010 - P 2
Transfer Contract SM PM 1st topic : General • Purpose of this information • Reminders about the rules • Reminders about the process • The transfer in SHT is made in two steps : One step technical One step financial and commercial 2 steps require to respect strictly the process Transfer SMPM for Commercial – 27/09/2010 - P 3
Transfer Contract SM PM 1st topic : General • Existing documents • Transfer process • Procedure to transfer GIS projects from commercial department to contract department (PL procedure) • GIS Projects transfer N°OI CC01 101 • Annex 1 to 6 Transfer SMPM for Commercial – 27/09/2010 - P 4
Transfer Contract SM PM 2nd topic : Transfer process • Transfer process Transfer Transfer SMPM for Commercial – 27/09/2010 - P 5
Transfer Contract SM PM 3 rd topic : Transfer • 1 – Technical transfer • Once TA signed for domestic contract • For export contract if LOI received (as a minimum) if technically the tender layout and product have been validated by customer • In both cases without a contract signed a deviation request (annex 6) has to be obtained by SM Transfer SMPM for Commercial – 27/09/2010 - P 6
Transfer Contract SM PM 3 rd topic : Transfer • 2 Commercial transfer • Once the contract is signed • It includes the financial transfer • For domestic, a financial transfer could be done if the contract has been signed by SHT. • Financial transfer means to give the EAS “As sold” : This stage is the EAS signed for presenting the offer to customer. • For “As booked”, Tendering revise the EAS taking into account the layout prepared by HVE and PM adjusts the ROR according to the deviations accepted or not and any occurrence after reading the contract and specification. Transfer SMPM for Commercial – 27/09/2010 - P 7
Transfer Contract SM PM 3 rd topic : Transfer • 3 – Timing • One week before the transfer, SM should send a copy of all transferred documentation to PM for a pre-Analysis. • Technical transfer • Commercial transfer with financial element within one month maximum. For a short delivery time, this period should be reduced to 2 weeks. Transfer SMPM for Commercial – 27/09/2010 - P 8
Subtitle / Main message Transfer SMPM for Commercial – 27/09/2010 - P 9
Subtitle / Main message Transfer SMPM for Commercial – 27/09/2010 - P 10