1 / 3

Run2AAG Work-Plan for next 3 months

Nov. 8, 2001. Run2AAG Work-Plan for next 3 months. Techniques to work on: Neural Networks Marcin, Tony Adaptive Mixtures Pushpa, Harrison Support Vector Machines Daniel W, Tony Independent Component Analysis Dan R, Marcin, .. Self-Organizing Maps Antonio, Mcihael Arov, Pushpa ,.

harva
Download Presentation

Run2AAG Work-Plan for next 3 months

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Nov. 8, 2001 Run2AAG Work-Plan for next 3 months • Techniques to work on: • Neural Networks • Marcin, Tony • Adaptive Mixtures • Pushpa, Harrison • Support Vector Machines • Daniel W, Tony • Independent Component Analysis • Dan R, Marcin, .. • Self-Organizing Maps • Antonio, Mcihael Arov, Pushpa,

  2. Plan (cont’d) • Problems to be addressed: • Classification Examples: • Signal/Background Discrimination • Flavor-tagging of jets • Parameter Estimation Examples: • Top mass in dilepton channel • Jet energy correction

  3. Plan (cont’d) • Bench-mark Analyses: • Top • ttbar  e  +jets Backgrounds: WW, Z   • Higgs • WH: M = 110 – 140 GeV Backgrounds: Wbb, ttbar • ttH: M = 110 – 140 GeV Backgrounds: ttjj • Z  bb Background: QCD di-jets (improving Z mass resolution)

More Related