1 / 3

BGI status

BGI status. M. Sapinski, Emittance meeting 2013.01.16. Difficult hardware restart. SPS: camera switched on, working correctly but lack of RS485 communication. LHC: cameras switched on, HV as well, all tested on Tuesday and Wednesday.

hasad
Download Presentation

BGI status

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. BGI status M. Sapinski, Emittance meeting 2013.01.16

  2. Difficult hardware restart • SPS: camera switched on, working correctly but lack of RS485 communication. • LHC: cameras switched on, HV as well, all tested on Tuesday and Wednesday. • On Thursday BGI crate (cfv-us45-btvm) found down (maybe electrical glitch played a role, but other BI crates OK), no remote control. • Interventions (Ion and Raymond, afterwards Stephan): • Exchange of Wiener power supply (Ion and Raymond) • Problem with one of the power strips inside the crate (exchange by electrical service called by Raymond) • Second power strip also found off (Stephan and Christophe) – powered on • After that communication with crate OK, but gas injection system found in “STOP interlock present” state. • Remote activation did not work, tunnel intervention was necessary (Didier and Francois) • System operational again on Monday afternoon.

  3. Lesson for the next time: AFTER CHRISTMAS TEST EVERYTHING ASAP because Santa does not exist

More Related