This update provides information on the recent PGDTF meeting, including discussions on GMD activities, the Texas A&M magnetometer project, grid security emergency reports, vulnerability assessments, GIC flows, and the schedule for the 2022 SSWG summer peak/min case building. It also covers upcoming PGDTF activities.

henrygreene
Download Presentation

Geomagnetic Disturbance Task Force (PGDTF) Update

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Planning Geomagnetic Disturbance Task Force (PGDTF) Update to ROS October 11, 2018 Dylan Preas PGDTF Chair

  2. PGDTF Meeting • Business meeting was held onSeptember 13th • Discussed Federal and State activities regarding GMD • Texas A&M magnetometer project – evaluating bids • Grid Security Emergency Report to the DOE – GMD is the second highest security emergency threat (draft 8/31/2018) • Discussed Vulnerability Assessment Event Descriptions • Discussed GIC flows status and steps moving forward • Schedule for 2022 SSWG summer peak/min case building • Reviewed GMD Vulnerability Scope and Schedule 10/11/2018 ROS Meeting

  3. Vulnerability Assessment Event Descriptions • To meet NERC TPL-007-1 R4 (Table 1) • Mis-operation of relays due to harmonics • Presentation from SPWG on the effects of harmonics on relay protection equipment during a GMD event • Microprocessor (digital) relays contain filtering that removes dc and harmonics – will not trip due to GIC flows/harmonics • Electromechanical relays without harmonic restraint may trip due to GIC flows 10/11/2018 ROS Meeting

  4. GIC flows status and steps moving forward • Current 2021 GIC System Models are missing data needed for accurate GIC flows • Missing vector groups, substation grounding resistance • ERCOT determined that zero impedance lines are removed from the GIC System Model by PTI • Had a conference call with PTI to discuss GIC modeling and PTI will issue a software patch to address concerns • ERCOT provided a data request to TSPs to update the GIC System Model (due 10/1/2018) 10/11/2018 ROS Meeting

  5. Schedule for 2022 SSWG summer peak/min GIC case building • The GIC System Model will be updated to the 2022 SSWG summer peak/min cases • The updated cases will be used to conduct the GMD Vulnerability Assessment in 2019 • The new schedule will be developed at a future PGDTF meeting 10/11/2018 ROS Meeting

  6. Review ERCOT GMD Vulnerability Assessment Scope • ERCOT GMD Vulnerability Scope under development • PGDTF provided additional comments based on recent discussion • ERCOT will compile all comments for discussion at the next PGDTF meeting 10/11/2018 ROS Meeting

  7. Upcoming PGDTF Activities • Discuss Vulnerability Event Descriptions • Finalize 2021 SP/min GIC System Model cases for GIC flows • Develop 2022 GIC System Model case building timeline • Finalize comments to the ERCOT GMD Vulnerability Assessment Scope 10/11/2018 ROS Meeting

  8. Questions 10/11/2018 ROS Meeting