1 / 4

Goals of the Summer Integration Test

Goals of the Summer Integration Test. Summer Integration Schedule 16-Jul-03 – 8-Oct-03 Test Infrastructure what we need & what we will have Global Integration Goals Test all Data Links in the L1Cal System for basic functionality Study Data & Data Transfer Problems

hisano
Download Presentation

Goals of the Summer Integration Test

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Goals of the Summer Integration Test • Summer Integration Schedule • 16-Jul-03 – 8-Oct-03 • Test Infrastructure • what we need & what we will have • Global Integration Goals • Test all Data Links in the L1Cal System for basic functionality • Study Data & Data Transfer Problems • Note: this plan will evolve – suggestions welcome! H. Evans Columbia/Nevis http://www.nevis.columbia.edu/~evans/l1cal/hardware/hardware.html#integration Run IIb L1Cal Meeting: 1-May-03

  2. L1Cal Integration Stand semi-permanent on sidewalk outside MCH1 long-term: assemble full L1Cal system here Infrastruct. (J. Anderson) Rack(s) & RMI monitors Power/Ground from MCH isolated platform Cabling for: Splitter(s), SCL Ethernet connections Safety review Mainly during shutdown early July We Supply Crates w/ power supplies & fans Test Equipment Scopes, Logic Analyzers Computers/Software Our prototype cards People to do the testing Information Needed Power Usage estimates Test Infrastructure Run IIb L1Cal Meeting: 1-May-03

  3. Links & Testing Priorities Run IIb L1Cal Meeting: 1-May-03

  4. Some Specific Tests Run IIb L1Cal Meeting: 1-May-03

More Related