Leakage Test Stand Improvement Marie Rohrbaugh

Leakage Test Stand Improvement Marie Rohrbaugh. Mission Statement: Reduce the effect of fixture leakage on leakage data. Background. Situation: External Leakage Testing Important Test Should be very near zero Goal: Reduce the effect of fixture leakage on test data.

hope
Download Presentation

Leakage Test Stand Improvement Marie Rohrbaugh

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Leakage Test Stand ImprovementMarie Rohrbaugh Mission Statement: Reduce the effect of fixture leakage on leakage data

  2. Background Situation: • External Leakage Testing • Important Test • Should be very near zero Goal: • Reduce the effect of fixture leakage on test data

  3. Highly Concentrated Area • Vent Between O-rings to eliminate pressure build-up • Pulse Purge

  4. Large Surface Area • Large o-ring seals • 2 holes 180 degrees apart • Pressurize one side with Nitrogen Nitrogen In Vacuum Chamber

  5. Function Tree

  6. Block Diagram

  7. Voice of the Engineer

  8. Constraints • Use of Nitrogen Gas • 1 psi Vacuum • 24V signal power supply • Class10,000 Clean Room • SAFE USERS

  9. Necessary Tasks • Change Plug Design (Interface with the can) • Pneumatics Design/Layout • FMEA • Software Controls • Moog will provide Manufacturing • Testing • Maintenance and Training Plans

  10. Benchmarks Vented

  11. Brainstorming • Pulse with Nitrogen to both • Large O-rings release to ambient on opposite side • Vent hole toggles between Nitrogen and Vacuum

  12. Brainstorming • Always a Constant flow of Nitrogen to Large Orings • Vent hole Toggles between Vacuum and Nitrogen

  13. Brainstorming • Constant Flow to large O-ring • Vent hole Toggles between pressurized Nitrogen and Ambient

  14. Brainstorming • Constant flow of Nitrogen to Large O-rings • Vent Hole has a constant Vacuum

  15. Staffing

  16. Feedback • Improve Block Diagram to include a detailed interface with the AGT and the two systems • Team Must Understand functionality • Constraints vs. Functions • If team believes another way is better, “ OK” • Timeline • IP considerations: We will work it all out over summer • Drawings • Test Specifications

  17. Questions??