Comprehensive Facilities Master Plan – Progress Report Summary. NEW PALTZ CENTRAL SCHOOL DISTRICT. Purpose of 2013 Study. To update 2010 Building Condition Survey and Formulate a Long Range Facilities Plan. Options. A1 - Infrastructure Only + Partial Air Conditioning

howell
Download Presentation

NEW PALTZ CENTRAL SCHOOL DISTRICT

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Comprehensive Facilities Master Plan – Progress Report Summary NEW PALTZ CENTRAL SCHOOL DISTRICT

  2. Purpose of 2013 Study To update 2010 Building Condition Survey and Formulate a Long Range Facilities Plan

  3. Options • A1 - Infrastructure Only + Partial Air Conditioning • -----------------------------------------------------------------------Upgrade for 21st Century Educational Model • B1 – “Good” Option • Containing all “must haves” • B2 – “Better” Option • Also containing all “should haves” • Upgrading to Full Building Air Conditioning

  4. New Paltz Central School District • Board of Education Meeting – 10/29/13 • Facilities Master Plan – Priorities based on discussions w/ Admin. & BOE

  5. Benefits of Option B1 – Duzine - Good

  6. Renovations at Duzine – Opt B1 - Good

  7. Renovations at Duzine – Opt B1 - Good

  8. Benefits of Option B2 – Duzine - Better

  9. Renovations at Duzine – Opt B2 - Better

  10. Renovations at Duzine – Opt B2 - Better

  11. Benefits of Option B1 – Lenape - Good

  12. Renovations at Lenape – OPT B1 - Good

  13. Renovations at Lenape – OPT B1 - Good

  14. Benefits of Option B2 – Lenape - Better

  15. Renovations at Lenape – OPT B2 - Better

  16. Renovations at Lenape – OPT B2 - Better

  17. Benefits of Option B1 – MS – Good

  18. Renovations at MS – Opt B1 - Good

  19. Renovations at MS – Opt B1 - Good

  20. Renovations at MS – Opt B1 - Good

  21. Renovations at MS – Opt B1 - Good

  22. Renovations at MS – Opt B1 - Good

  23. Renovations at MS – Opt B1 - Good

  24. Benefits of Option B2 – MS – Better

  25. Renovations at MS – Opt B2 - Better

  26. Renovations at MS – Opt B2 - Better

  27. Renovations at MS – Opt B2 - Better

  28. Benefits of Option B1 – HS – Good

  29. Renovations at HS – Opt B1 - Good

  30. Renovations at HS – Opt B1 - Good

  31. Renovations at HS – Opt B1 - Good

  32. Benefits of Option B2 – HS – Better

  33. Renovations at HS – Opt B2 - Better

  34. Renovations at HS – Opt B2 - Better

  35. Options • A1 - Infrastructure Only + Partial Air Conditioning • -----------------------------------------------------------------------Upgrade for 21st Century Educational Model • B1 – “Good” Option • Containing all “must haves” • B2 – “Better” Option • Also containing all “should haves” • Upgrading to Full Building Air Conditioning

  36. Financial Summary OPTION A1…………$30.5 OPTION B1…………$70.4 OPTION B2…………$84.5

  37. Financial Summary: Details OPTION A1(infrastructure + partial air conditioning) Duzine………....$4.6 Lenape………...$4.1 Middle School...$12.3 High School…...$9.5 TOTAL…………$30.5 Expected Aid….$18.3 Net Cost……….$12.2 *Note “partial a/c” = upper floor + gym, aud., & library

  38. Financial Summary: Details OPTION B1(“good” / “must haves”, partial a/c) Duzine………....$7.0 Lenape………...$7.2 Middle School...$38.9 High School…...$17.3 TOTAL…………$70.4 Expected Aid….$39.1 Net Cost……….$31.3 *Note “partial a/c” = upper floor + gym, aud., & library

  39. Financial Summary: Details OPTION B2(“better” / “+ should haves”, + full a/c) Duzine………....$8.4 Lenape………...$9.0 Middle School...$43.8 High School…...$23.3 TOTAL…………$84.5 Expected Aid….$46.4 Net Cost……….$38.1

  40. Air Conditioning Summary Method 1 (Unit Ventilator) Duzine a. full building…$1.8 *only a 1-story building Lenape a. partial……….$1.5 b. full………......$2.7 Middle School (method 1 not cost effective) High School a. partial……....$1.7 b. full …............$4.2 *Note “partial” = upper floor + gym, aud., & library

  41. Air Conditioning Summary Method 2 (Central HVACw/ Energy Recovery ) Duzine a. full building…$2.6 *only a 1-story building Lenape a. partial……….$2.2 b. full………......$3.0 Middle School a. partial……….$1.1 b. full………......$4.7 High School a. partial……....$2.5 b. full …............$6.1 *Note “partial” = upper floor + gym, aud., & library