CT2 Meeting 5-6 March 2013 Hamburg UHAM Plans 2013-2014 Kerstin Jochumsen. Plans 2013/2014. 2013 April: Poseidon cruise , Med. outflow , ADCP test array one 150 kHz and two 75 kHz instruments + Anderaa Current Meters (RCM 11)
E N D
CT2 Meeting 5-6 March 2013 Hamburg UHAM Plans 2013-2014 Kerstin Jochumsen
Plans 2013/2014 2013 April: Poseidon cruise, Med. outflow, ADCP testarray one 150 kHz andtwo 75 kHz instruments + AnderaaCurrent Meters (RCM 11) Summer: Charter cruiseforservicing DS-2 – probablycanceled Exchange 75 kHz at DS-2 with 150 kHz instrument? Waitfor 75 kHz ADCP solution Hedinn/Steingrimurcouldyouservice DS-2? Who will help Laura deploytheReykjanesRige Moorings? August: Meteor cruise, upwellingfilaments off Namibia (newproject) 3 ADCPs neededformooringsuntil May 2014
Plans 2013/2014 Extension ofDenmarkStrait Array towardstheGreenlandShelf
Plans 2013/2014 Two additional ADCP moorings on theshallowerGreenlandsideoftheStrait, one additional RCM mooring on theIcelandicside -> Input needed on the design oftheframes (Svein)
Plans 2013/2014 2014 May: Meteor cruise off Namibia, recoveryof ADCP moorings Summer: Poseidon cruiseforservicing DS-2, deploymentof extra DS mooringswithtrawlresistantframes (design offrames still open) 2015 (not yetproposed) Recoverycruisefor DS mooringsneeded New mixingarrayexperiment?
Plans 2013/2014 Poseidon cruise in 2014
Plans 2013/2014 ADCP deploymentplanning….. Exchange of DS-2 75 kHz ADCP with 150 kHz depending on RDI