1 / 8

CT2 Meeting 5-6 March 2013 Hamburg UHAM Plans 2013-2014 Kerstin Jochumsen

CT2 Meeting 5-6 March 2013 Hamburg UHAM Plans 2013-2014 Kerstin Jochumsen. Plans 2013/2014. 2013 April: Poseidon cruise , Med. outflow , ADCP test array one 150 kHz and two 75 kHz instruments + Anderaa Current Meters (RCM 11)

hua
Download Presentation

CT2 Meeting 5-6 March 2013 Hamburg UHAM Plans 2013-2014 Kerstin Jochumsen

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CT2 Meeting 5-6 March 2013 Hamburg UHAM Plans 2013-2014 Kerstin Jochumsen

  2. Plans 2013/2014 2013 April: Poseidon cruise, Med. outflow, ADCP testarray one 150 kHz andtwo 75 kHz instruments + AnderaaCurrent Meters (RCM 11) Summer: Charter cruiseforservicing DS-2 – probablycanceled Exchange 75 kHz at DS-2 with 150 kHz instrument? Waitfor 75 kHz ADCP solution Hedinn/Steingrimurcouldyouservice DS-2? Who will help Laura deploytheReykjanesRige Moorings? August: Meteor cruise, upwellingfilaments off Namibia (newproject) 3 ADCPs neededformooringsuntil May 2014

  3. Plans 2013/2014 Extension ofDenmarkStrait Array towardstheGreenlandShelf

  4. Plans 2013/2014 Two additional ADCP moorings on theshallowerGreenlandsideoftheStrait, one additional RCM mooring on theIcelandicside -> Input needed on the design oftheframes (Svein)

  5. Plans 2013/2014 2014 May: Meteor cruise off Namibia, recoveryof ADCP moorings Summer: Poseidon cruiseforservicing DS-2, deploymentof extra DS mooringswithtrawlresistantframes (design offrames still open) 2015 (not yetproposed) Recoverycruisefor DS mooringsneeded New mixingarrayexperiment?

  6. Plans 2013/2014 Poseidon cruise in 2014

  7. Plans 2013/2014 ADCP deploymentplanning….. Exchange of DS-2 75 kHz ADCP with 150 kHz depending on RDI

  8. The research leading to these results has received funding from the European Union 7th Framework Programme (FP7 2007-2013), under grant agreement n.308299 NACLIM www.naclim.eu

More Related