1 / 16

Site report: CERN

Site report: CERN. Helge.Meinhard@cern.ch HEPiX/HEPNT Autumn 2003 Vancouver. Structure, management. CERN: Robert Aymar new DG as of January 1 st Major re-organisation expected ‘Physics’ part of IT Division likely to remain unchanged IT Management changes

ilori
Download Presentation

Site report: CERN

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Site report: CERN Helge.Meinhard@cern.ch HEPiX/HEPNT Autumn 2003 Vancouver

  2. Structure, management • CERN: Robert Aymar new DG as of January 1st • Major re-organisation expected • ‘Physics’ part of IT Division likely to remain unchanged • IT Management changes • F. Hemmer becomes leader of new middleware group for EGEE • C. Eck working fully for LCG • P. Anderssen replaces C. Eck as DI GL • D. Foster replaces P. Anderssen as CS group leader • Dissemination unit created in DI (F. Grey) 2

  3. Computer security • Windows RPC vulnerabilities  A. Pace, D. Heagerty • AFS password expiry • 12 months, users get notified by E-mail • Implementation being finalised • Hardware address registration enforced for portables • Procedures in place for CERN users and short-term visitors • Enforced already in IT buildings, rest of site before Christmas • Closure of off-site FTP on 2004/01/20 at the latest • Rules being established for system connected to CERN network • Defines acceptable network and security practices • Draft in preparation 3

  4. FIO – Fabric infrastructure and operations • ELFms management suite being deployed at large scale  T. Kleinwort • Components: • Quattor – configuration and installation • Lemon – monitoring and fault tolerance • Hardware management system • State management system • Quattor, Lemon making copious use of EDG WP4 tools • Outsourced system administration contract being replaced by in-house team of CERN hired system administrators (2nd level of 3-level model) 4

  5. FIO (2) • Procurements: carrying on with ‘white boxes’ for CPU servers and disk storage • Infrastructure for serial console for whole CC being deployed  H. Meinhard • Backup • Consolidating on TSM, new hardware bought • Legato phase-out: stop writing 12/03, last retrieval 03/04 • CDR: 250 TB for Compass, 115 TB for NA48 in 2003 • CC refurbishment ongoing • Civil engineering work for bunker for new 18 kV substation begun 5

  6. FIO (3) 6

  7. ADC – Architecture and Data Challenges • Castor (CERN advanced storage manager) • New stager being developed  J.-D. Durand • Storage Resource Manager ready for deployment • Framework discussed for support to external institutes • Preparing for next Alice computing challenge, aim is 300 MB/s sustained from online to tape 7

  8. ADC (2) • CERN OpenLab • OpenCluster: grid enabled compute and storage farm • ~40 HP dual processor Intel Itanium machines • RedHat AW 2.1, OpenAFS 1.2.7, gcc 2.96, 3.2, 3.3, icc 7, 8beta, LSF 5.1 • Enterasys 10 Gbit switches • IBM StorageTank high-capacity storage system – tests, benchmarking • Applications compiled and verified: Root, CLHEP, Gean4, Aliroot (including large fractions of CERNLIB), online software • Workshops: • 03/03 Storage and Data Management • 07/03 Fabric Management • 11/03 Total Cost of Ownership 8

  9. ADC (3) • RedHat certification…  J. Iven, A. Silverman • Work horse is RH 7.3 • RH 6.1 phased out • Except for a few 10 machines needing it for Objy/DB • Aim was to conclude certification of new Linux in time such that systems could be upgraded during CERN machine shutdown in winter • Started certification based on RH 10 beta (severn) • RH announced more support policy changes • CERN put certification on hold… awaiting this meeting 9

  10. DB – Data Bases • POOL – persistency framework • 1.3.2 released • Successfully integrated into Atlas and CMS software frameworks • CMS reporting 700 k simulated events in POOL • RLS service being deployed on testbeds, distribution kits available • Ever more physics applications require DB services • Oracle 10g out, many new features 10

  11. GD – Grid Deployment • LCG-1 being deployed  I. Neilson, D. Smith 11

  12. IS – Internet Services • Windows XP Professional deployed • New PCs delivered with XP (and/or Linux) • No upgrade campaign for Windows 2000 • Support for NT and 95 stopped earlier this year • Mail migration from IMAP servers on Solaris to Exchange (with improved Anti-Spam tools) well advanced  A. Pace • Evaluating M$ SUS (Software Update Service) for deploying security updates 12

  13. IS (2) • Pilot service for Windows Terminal Server  A. Pace • Web-based file systems, gateway to DFS  A. Pace • CPU cycles from Windows screen saver for simulation • Project advancing 13

  14. PS – Product Support • CVS service in full swing  S. Lopienski • Solaris services being consolidated  S. Lopienski • Some ELFms components ported to Solaris • Phasing out Alpha servers for EDMS and engineering applications • Replacements: Solaris, Windows • Euclid client migration to Windows completed • Migration to new print server system completed • Special clusters for GdfidL (7 dual Xeon machines with 4 GB memory each) and StarCD (Solaris) • Desktop support contract being re-tendered 14

  15. CS – Communication Systems • Current GSM contract expires by 12/03, new contractor as of 01/04 • Transition being prepared • STM-64 line CERN – Chicago operational • Replacing STM-4 • ACB (Automatic Call Back) for connections from home to CERN under discussion 15

  16. AOB • LEP data archiving • Requested by CERN Management • HW, SW, data (25 TB/exp), expertise to be kept alive for ≤ 20 y • Exps with different schedules for wind-down of their activities • Working group set up, more understanding expected until 12/03 • Mac support… • A little, focused on MacOS X • Encouraging self-help of user community • Aim is interoperable browsers, mail clients, web authoring etc.; central application and home directory services on Windows DFS infrastructure • Implementation being prepared 16

More Related