An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Restructuration des groupes CERN CMS • Motivations • Implémentation • Structure proposée • Relation avec la structure de la Coordination Technique dans CMS (A.Ball) P. Bloch 13/02.2008

  2. La structure des groupes actuels a été définie en fonction des projets a livrer a CMS • CMA → Calorimètre électromagnétique • CMT → Tracker • CMI → Infrastructure, aimant,… • CMM → coordination technique

  3. Motivations(1) • Nous entrerons bientôt dans une nouvelle phase d’opération, combinée avec une consolidation et des améliorations de CMS • Le déroulement d’une année comprendra deux périodes d’activité très différentes (prise de données, shutdown) et la structure doit permettre la souplesse entre ces activités.

  4. Motivations(2) • Il est souhaitable que les personnels puissent participer • à l’opération • aux améliorations (“upgrades”) • Une séparation trop rigide entre ces deux activités serait inefficace & priverait les améliorations de l’expérience accumulée durant l’opération • Ceci parle aussi en faveur d’une structure qui permet la souplesse entre ces deux pôles d’activité. Un groupe unifié supprimera au moins en partie les barrières entre les activités

  5. Motivations(3) • Le budget d’opération des groupes PH est en forte baisse • Le budget « utilisable » du CERN est en baisse du aux remboursement du LHC en 2008/9/10/11 • Pour CMS, la conséquence est que le budget d’opération 2008 est 2 fois plus faible que en 2007 ! • Le nombre de staff est en stagnation. • Une multitude de petits groupes ne donne pas la flexibilité nécessaire • L’union fait la force !

  6. Motivations(4) Probablement sur la base des mêmes considérations, une « concentration » des groupes a été demandée par la direction • Les 3 autres groupes des expériences LHC au CERN et les groupes de support mécaniques (DT1,2) suivent une démarche identique. • Le regroupement de l’activité électronique PH dans un groupe unique PH-ESE a eu lieu en Juillet 2007.

  7. Implémentation • La proposition PH: 1/04/08 • Nous préférerions • après la fermeture de CMS pour CMI+M+T , • après la fin de construction du ECAL EE & ES pour CMA Ce qui est important est que la structure soit bien définie et que chacun sache où il sera affecté dans le futur proche Le MARS est fait par le superviseur actuel Votre futur Group/Section leader peut discuter avec votre superviseur actuel si des questions se posent quant aux objectifs en 2008.

  8. Structure Courante

  9. Nouvelle structure Remark: full integration of CMA will take place at the end of ECAL construction

  10. Sous-structure CMX SAFETY OPERATION MAINTENANCE COMPLETION, CONSOLIDATION, UPGRADES

  11. PH-CMX Sections Group leader P. Siegrist, deputies: A.Ball, T. Camporesi, D.Campi, C.Schaefer (safety) CMX-IC A. Gaddi B. Cure [Elec Eng] S. Dos Santos N. Frank M.Gateau A .Lyonnet A. Meynet-C P. Tropea V. Delachenal G. Fetchenhauer S. Klyukhin S. Lusin P-P. Trapani . CMX-EE H. Gerwig P. Petiot L.Veillet J. Bos M. Favre N. Siegrist J-P. Girod M. Chauvey H. Sauce A. Muths D. Druzhkin J.F. Fuchs A. Maurisset A. Patino-Revuelta G. Sidiropoulos N. Smijlkovic M. Stettler A. Surkov R. Goudard M. Di Rosa J. Rodrigues Antunes CMX-DS PH > 50% CMS (non CMS group) A. Onella N.Bourgeois M.Hansen W. Bialas K. Kloukinas P.Petit V. Ryjov C. Sigaud J. Troska P.Vichoudis S.Reynaud R. Pintus J.D. Maillefaud J. Baechler J-L Kottelat R.Loos J. Mulon P. Wertelaers D. Abbaneo K.Gill E.Auffray D.Barney H.Breuker A.Elliott-Peisert M.Eppard W.Funk A.Honma P.Lecoq P.Petagna H. Postema A. Sharma A. Tsirou S.Bally J-P. Chatelain S. Di Vincenzo M. Alidra E. Albert A. Conde Garcia H. Cornet D. Deyrail J. Muffat-Joly J.F. Pernot R. Hall-Wilton M.Passaseo S.Michal W. Van Doninck W.Zeuner F. Valchkova A. Bell I. Kojevnikov S. Mueller T. Sobrier G. Bencze N. Beni M. Wensveen S. Bel G. Bilei D.Contardo A.Colaleo I. Crotty S. Mersi P.Paganini D. Ricci P.Rumerio A.Thea P. Verdini N. Bacchetta S.M Abbas (S. Abdoulline) I. Ahmed M.I Akhtar S.A. Butt S. Colafranceschi F. Drouhin P. Engstrom F. Hartmann J. Kortesmaa A. Kuronen L. Masetti N. Nedfors E. Valladolid Gallego E. Vlassov StaffFellows & associates Students & PJAS & USAS (mes excuses pour les erreurs possibles)

  12. CMS Technical Organisation Overviewfor Operation, Maintenance, Completion & Upgrade Run Coordination T. Camporesi, D. Acosta Technical Coordination A.Ball, W.Zeuner, C.Schaefer Upgrade Coordinator J. Nash Infrastructure & common systems A. Gaddi P5 expt area M.Gastal Engineering & Electronics H.Gerwig, M.Hansen Technical teams Coord L.Veillet, P.Petiot Detector Subsystems D. Abbaneo, K.Gill W.Zeuner Run Field Management P. Siegrist PH-CMS A.Onnela PH-DT groups & facilities TS support groups & facilities FSU TC office & Admin Support D. Hudson Subdetector Field Technical Coordinators (to be re-confirmed) TK N. Bacchetta DT A. Benvenuti Contractors Meetings &/WG’s: TC CRC Run Meeting TCP5 TCM, Commiss Meet TECOPA, TIG Commiss Board CEMESTE MIG, ESSC, WoGEI Projects: CSC A. Lanaro ECAL K. Bell, W.Funk Safety Operation Maintenance Upgrade RPC A. Colaleo ES D. Barney Alignment T. Rodrigo HCAL P. de Barbaro

  13. CMS Technical Coordination Detail Technical Coordination: Ball, Zeuner, Schaefer TC office & Admin Support D. Hudson Engineering & Electronics H.Gerwig, M.Hansen Infrastructure & common systems A. Gaddi. B. Cure PH-CMS A. Onnela P5 EAM M.Gastal J. Osborne Technical teams coordination L.Veillet, P.Petiot Detector Subsystems W. Zeuner, K,Gill Rack infra V. Delachenal Detector zones Sharma Hansen, Racz Electronics systems support V. Ryjov Run ops support (Run Field Manager) P. Siegrist PH DT support groups CERN-CMS Host Lab facilities nnnnnn Planning & work safety coord support M Gastal FSU Elec. System S.Lusin, NNNN Engineering integration G.Faber, J.Bos Mech Eng. Systems H. Gerwig Operating Procedures and trainuing A. Sharma Detector Systms Eng Support H. Postema TK Bacchetta TS support groups DT A. Benvenuti Gas, Lasers G. Fetchenhauer Cable plant M.Wensveen Elec&Electronic Systems support M. Hansen ECAL K. Bell, W.Funk Det.. Cooling P. Tropea Beampipe and surrounds P. Petagna, F. Feyyi MIG: LHC/CMS Communic. J. Spalding, W.Smith CSC A. Lanaro DCS F. Glege DSS & RSS A. Meynet-C. SX5 facilities J-P Girod ES D. Barney Control Rooms D. Stickland BRM R. Hall-Wilton RPC A. Colaleo AT-VAC Network E. Cano Survey R. Goudard HCAL P. de Barbaro Simulations for Ops & Upgrade M Huhtinen IHEP team EMD, INB, ALARA S. Bally Magnet & Yoke B. Cure Alignment T. Rodrigo Logistics Planning & equipment P.Petiot AT, AB Institute tech Teams Detectors technical team J-P Chatelain Areas & Logistics Tech Team PH-CMS Tech team TS EAM team Infra Tech team

  14. CERN structure for CMS Technical Coordination (draft) Technical Coordination: Ball, Campi, Zeuner, Schaefer TC office & Admin Support D. Hudson Infrastructure & common systems A. Gaddi. B. Cure Detector Subsystems K,Gill, A.Sharma Engineering & Electronics H.Gerwig, M.Hansen PS EAM M.Gastal J. Osborne PH-CMS A. Onnella Rack infra V. Delachenal PH - DT support groups Run ops support (Run FieldManager) P. Siegrist Electronics systems support V. Ryjov Planning & work safety coord support M Gastal Detector zone coord Sharma,Hansen,Racz Elec. System S.Lusin, NNNN Operating Procedures and trainuing A. Sharma Engineering integration J.Bos Mech Eng Systems H. Gerwig TS support groups Gas, Lasers G. Fetchenhauer Technical teams coordination L.Veillet, P. Petiot Cable plant M.Wensveen Elec&Electronic Integration M. Hansen BRM & Machine Interface R. Hall-Wilton Det.. Cooling P. Tropea DCS F. Glege FSU DSS & RSS A. Meynet-C. Control Rooms nnnnnnn SX5 facilities J.P Girod EMD, INB, ALARA S. Bally Network E. Cano Simulations for Ops & Upgrade M Huhtinen S.Mueller Survey R.Goudard Beampipe & surrounds P. Petagna Magnet & Yoke B. Cure Logistics Planning & equipment P. Petiot Detector Systems Eng Support H. Postema AT, AB Detectors Technical Team J-P. Chatelain TS EAM team PH-CMS Tech team Areas & Logistics Tech team Infra Tech Team

  15. All names below section leader are provisional: CERN-CMS detector group (PH-CMX) PH-CMX Siegrist(GL) TC office & Admin Support D. Hudson Technical Coordination: Ball, Campi, Schaefer (DGLs), Zeuner Run Coordination Camporesi(DGL) IC DS EE Infrastructure & common systems A. Gaddi. B. Cure CERN team leader P. Bloch Detector Subsystem Coordination D. Abbaneo, K.Gill Engineering Systems H. Gerwig, P.Petiot Technical teams coordination L.Veillet, P.Petiot CERN as institute CERN as host lab Rack infra V. Delachenal Engineering design N. Smijlkovic Detector zone coord Sharma, Hansen Run ops support (RunFieldManager) P. Siegrist Calorimetry nnnnnn Magnet & Yoke B. Cure SX5 facilities J-P.Girod Cable plant M.Wensveen Muon detection nnnnnn Operating procedures and trainuing A. Sharma Electrical System S.Lusin, NNNN CMS Subdetector PM’s Logistic planning and equipment P.Petiot EMD, INB, ALARA S. Bally Tracking nnnnnn Gas, Lasers G. Fetchenhauer BRM & Machine Interface R. Hall-Wilton Beampipe & surrounds P. Petagna, Survey R. Goudard Muom Alignment nnnnnnn Det.ector Cooling P. Tropea Control Rooms nnnnnnnn Integration and as-built model J. Bos Simulations for Ops & Upgrade S.Mueller DSS & RSS A. Meynet Cordonnier Detector Systems Eng Support H. Postema Infra Technical team Areas & Logistics Technical Team Detectors Technical Team J-P. Chatelain