1 / 7

THE FORSCOM IR TEST

THE FORSCOM IR TEST. ANALYSIS OF TEST RESULTS REVISED BY OASA(FM&C). AS OF 22 JUNE 1996. Comparable Man-Years (CMY). Internal Command Review Audit (CA) Total Avail Man-Days 3,120 2,246 Less Liaison Man-Days - 250 -32 Comparable Man-Days 2,870 2,214

Download Presentation

THE FORSCOM IR TEST

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. THE FORSCOM IR TEST ANALYSIS OF TEST RESULTS REVISED BY OASA(FM&C) AS OF 22 JUNE 1996

  2. Comparable Man-Years (CMY) Internal Command ReviewAudit (CA) Total Avail Man-Days 3,120 2,246 Less Liaison Man-Days - 250 -32 Comparable Man-Days 2,870 2,214 Divided by Days per YR 260 260 =Comparable Man-Years 11.048.52

  3. TEST RESULTS: FACTOR #1: INPUTS (COST) • TOTAL COST OF OPERATIONS • INTERNAL REVIEW $826.4K • COMMAND AUDIT $687.8K • TOTAL MAN-DAYS PURCHASED • INTERNAL REVIEW 4,193 • COMMAND AUDIT 2,934 • COST PER MAN-DAY (MD) • INTERNAL REVIEW $197. 09 • COMMAND AUDIT $234.45 • COST PER MAN-YEARS (MY) • INTERNAL REVIEW $51.2K • COMMAND AUDIT $61.0 COST PER MAN-YEAR $61.0K $51.2K NOTE: AVAILABLE MAN-DAYS AND CORRESPONDING COSTS WERE EXTRACTED FROM “INVESTMENT/INPUT” DATA SHEETS COVERING THE PERIOD 1 AUG 95 - 31 MAR 96

  4. TEST RESULTS: FACTOR #2: OUTPUT (PRODUCTIVITY) TOTAL AUDIT ENGAGEMENTS PER CMY: • TOTAL AUDIT ENGAGEMENTS COMPLETED • INTERNAL REVIEW 88 • COMMAND AUDIT 52 • TOTAL CMY • INTERNAL REVIEW 11.04 • COMMAND AUDIT 8.52 • TOT ENGAGEMENTS PER CMY • INTERNAL REVIEW 7.97 • COMMAND AUDIT 6.10 7.97 6.10 SOURCE: PRODUCTIVITY OUTPUT DATA SHEETS FOR THE PERIOD 10/01/95 - 03/31/96.

  5. TEST RESULTS: FACTOR #2: OUTPUT (PRODUCTIVITY) TOTAL AUDIT ENGAGEMENTS: A CLOSER LOOK FOLLOWUP AUDITS PER CMY: CONSULTING PROJECTS PER CMY: FORMAL AUDITS PER CMY: IR 2.99 CA 1.41 IR 4.44 CA 1.41 IR .54 CA 1.41

  6. TEST RESULTS: OUTPUT MONETARY BENEFITS IDENTIFIED PER CMY: • TOTAL MONETARY BENEFITS • INTERNAL REVIEW $23.5M • COMMAND AUDIT $11.9M • TOTAL CMY • INTERNAL REVIEW 11.04 • COMMAND AUDIT 8.52 • MONETARY BENEFITS PER CMY • INTERNAL REVIEW $2.13M • COMMAND AUDIT $1.40M $2.13M $1.40M DOLLARS SAVED (MILLIONS) $.46M SOURCE: PRODUCTIVITY OUTPUT DATA SHEETS FOR THE PERIOD 10/01/95 - 03/31/96.

  7. TEST RESULTS: OUTPUT ESTIMATED RETURN ON INVESTMENT: • TOTAL MONETARY BENEFITS • INTERNAL REVIEW $23.5M • COMMAND AUDIT $11.9M • ESTIMATED 6-MONTH OPERATING COSTS • INTERNAL REVIEW $615K • COMMAND AUDIT $526K • ROI = BENEFITS / COSTS • INTERNAL REVIEW 38.2 TO 1 • COMMAND AUDIT 22.6 TO 1 38.2 TO 1 22.6 TO 1 ESTIMATED 6-MONTH OPERATING COSTS = COST PER M/D FROM 8 MONTH DATA * AVAILABLE MANDAYS DURING 6-MONTH TEST PERIOD.

More Related