1 / 19

“ RAKOR TRIWULAN II TAHUN 2013 ”

“ RAKOR TRIWULAN II TAHUN 2013 ”. Palembang, Juli 2013. PT PLN ( Persero ) Pembangkitan Sumbagsel Sektor Pembangkitan Bengkulu. Progress Program Unggulan 5 S SBKL 2013. Progress Program Unggulan 5 S SBKL 2013. Penandatanganan Komitmen Bersama 5S. Perbaikan Pos Jaga.

isleen
Download Presentation

“ RAKOR TRIWULAN II TAHUN 2013 ”

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. “RAKOR TRIWULAN II TAHUN 2013” Palembang, Juli 2013 PT PLN (Persero) PembangkitanSumbagsel • SektorPembangkitan Bengkulu

  2. Progress Program Unggulan 5 S SBKL 2013

  3. Progress Program Unggulan 5 S SBKL 2013 PenandatangananKomitmenBersama 5S Perbaikan Pos Jaga PenataanRuang Kantor PenataanGudang Material

  4. Program PLN Bersih • CODE OF CONDUCT SBKL • DO • Jujurdanmenjagakomitmen • Berpikircepat, tepatdanakurat • Adildanbertanggungjawab • Menjunjungintegritas data • Inovatifdankreatif • Berwawasanlingkungan • DON’T • Menyalahgunakanwewenangdanjabatan • Pasifdanreaktif • Meminta, memberi, menerimasuapdangratifikasi • Memanipulasi data • Provokatif • Tidakpeduliterhadaplingkungan TempatPenerimaanTamu Sosialisasi PLN Bersih

  5. Progress Program VCS SBKL 2013

  6. HasilVerifikasi VCS SBKL 2013 HasilVerifikasi VCS PLTA Musiuntukperiode April 2010 s.dMaret 2013 adalahsebesar 1.743.705 tCO2 eq Hasil VCS PLTA Musiperiode April 2009 s.dMaret 2010 yang telahterjualadalahsebesar 207.956 tCO2 eq (Euro 302.754 )

  7. HasilAssesmentAsetManajemen SBKL TW II 2013

  8. HasilAssesmentAsetManajemen SBKL TW II 2013

  9. Hasil Audit Readiness OPI SBKL Wave III 2013

  10. RencanaKegiatan Semester II Tahun 2013

  11. RencanaPenurunanPersediaanSmt II Tahun 2013

  12. PrediksiPencapaianKinerja ITO SBKL Realisasi ITO s.d TW II 2013 : 0.45 % Prediksi ITO s.d TW IV 2013 : 1.19 %

  13. Issue Sektor Bengkulu

  14. Issue Sektor Bengkulu

  15. PT. PLN (PERSERO) Pembangkitan Sumbagsel – Sektor Pembangkitan Bengkulu TerimaKasih PT PLN (Persero) PembangkitanSumbagsel • SektorPembangkitan Bengkulu

  16. PencapaianKinerjas.d TW II 2013

  17. PencapaianKinerjas.d TW II 2013

  18. PemeliharaanPeriodikSektor Bengkulu

  19. Project VCS PLN

More Related